Flat Refurbishment Kentish Town
Flat refurbishments in Kentish Town, your flat renewed within the lease, the licence and the rules of the block.
- Rated 4.9 from 31 reviews on MyBuilder
- UK guide: £33,000 to £48,000
- Free site survey, itemised quote
Flat refurbishment is the main refurbishment trade in Kentish Town, because the VOA count puts 87% of homes here in flats. They range from floors of converted Victorian houses to post-war council estates and newer blocks, and 14% of all homes here were built in 2000 or later. Refurbishing any of them means working to a lease, a freeholder and often a managing agent, sharing a staircase with neighbours and keeping water and noise out of the flat below.
For Kentish Town, published UK averages put a full flat refurbishment at £33,000 to £48,000 and a basic one, with budget kitchen and bathroom fittings, at £15,000 to £18,000, and London flats usually cost more (Checkatrade and MyJobQuote, 2026). GS Renovation Ltd, a building contractor based in Potters Bar, does the work in Kentish Town: we refurbish the flat within the terms of your lease and licence to alter, protect the common parts throughout, and a registered electrician certifies the new consumer unit and circuits.
Price guide
| Work | Indicative range |
|---|---|
| Flat, full refurbishment | £33,000 to £48,000 |
| Flat, basic refurbishment | £15,000 to £18,000 |
| Full rewire, one-bed flat | from £3,900 |
| Consumer unit replacement | £350 to £750 |
| Sound insulation under a new floor | £45 to £160 per square metre |
Indicative ranges from published cost guides (Checkatrade and MyJobQuote, 2026), not a quotation. Most are UK-wide figures and London work usually costs more; a row marked London is a London figure. Prices checked September 2026.
Quick estimate from UK guide figures
Guide range: choose above

The three kinds of Kentish Town flat we refurbish
For a refurbishment, Kentish Town flats fall into three broad types, and each sets different limits on the work. The housing is mostly flats, on post-war council estates and in Victorian terraces, and the VOA adds that 14% of homes were built in 2000 or later. A flat on one floor of a converted terrace has timber joists, a shared stair and pipework that may pass through the flat above or below.
A flat on a post-war estate sits on concrete floors, with risers, soil stacks and sometimes heating that belong to the block and not to you. A flat in a newer block often comes with a managing agent, a fire strategy for the building and rules on which contractors may work there. We ask for the lease and any block rules at the first visit, because they decide what can be moved, chased or replaced.
Housing in Kentish Town
On the valuation list Kentish Town counts about 8,940 homes, 87% flats and 13% houses; 44% predate 1919, 4% are interwar and 52% post-war.
Licence to alter and full plans for a Kentish Town flat
A leaseholder in Kentish Town needs two separate permissions before notifiable work starts: the landlord's consent under the lease, and building regulations approval by the full plans route. Camden says a leaseholder must have the freeholder's consent and must make a full plans application rather than a building notice. The licence to alter is often negotiated through the managing agent, and it can set conditions on hours, protection and floor finishes.
On a full plans application Camden gives a decision within 6 weeks, or 2 months for more complex proposals. So a flat refurbishment that moves a bathroom, adds a new drain run or moves a partition has its start date set by paperwork, not by our diary. We give the designer or the owner the method and product details the freeholder's surveyor asks for, and fix the start date once both approvals are in hand. In a higher-risk building under the Building Safety Act, building control for the work sits with the Building Safety Regulator rather than Camden. Work self-certified under a competent person scheme, such as a rewire, does not need its approval.
Working inside a shared block in Kentish Town
Refurbishing a Kentish Town flat means the common parts are part of the site. We protect the stair treads, walls and any lift car before the first delivery, and carry plasterboard, tiles and bagged waste up and down by hand in agreed windows. A lease or the block rules can set tighter working hours than the council does, so we programme to the stricter of the two and tell the neighbours before the noisiest days.
Hard floors need the most care in a block. Replacing carpet with timber or tile can carry footsteps into the flat below, so where the lease asks for it we lay an acoustic underlay or a floating floor to the approved detail. The flat entrance door and compartment walls are fire safety matters for the freeholder or responsible person, so we do not alter them without their written consent and specification.
Refurbishing a Kentish Town flat to let
A landlord refurbishing a Kentish Town flat between tenancies has a legal energy floor to reach. GOV.UK says that since 1 April 2020 landlords cannot let, or continue to let, properties covered by the MEES Regulations with an EPC rating below E without a valid exemption. Those rules are enforced by local authorities, so for a flat that means insulation where the fabric allows, efficient electric or gas heating and good controls.
Sharing tenants bring a second set of rules. Camden says HMO flats in purpose built blocks of 3 or more flats, though exempt from mandatory licensing, must still be licensed under its additional licensing scheme. Camden's additional scheme covers 3 or more people forming 2 or more households, so a flat let that way needs a licence, and its conditions shape the refurbishment. The landlord applies for that licence. The works a licence sets are covered on our HMO conversions page; a flat refurbishment keeps to the lease and the tenancy.
- Consumer unit replacement from the meter onwards
- Secondary glazing inside windows the lease keeps with the freeholder
- Full and basic flat refurbishments within the existing layout
VOA Council Tax stock of properties, March 2025, for Kentish Town West and Kentish Town East. Counts rounded by the VOA.
Trusted Flat Refurbishment in Kentish Town
A flat refurbishment is judged by the neighbours as much as by the owner, so we run it with one site manager who deals with the managing agent, protects the common parts and keeps to the block's hours. You get a written quotation after a visit and a written programme that shows when the noisy work, the deliveries and any water shut-offs fall. The electrical certificate and any building control completion certificate are handed over for your lease file.
- Fire doors and compartment lines left as the building's fire strategy needs them
- New pipework pressure tested so nothing leaks into the flat below
- One point of contact from first survey to handover
George always kept to commitments and arrived on time. He offered helpful suggestions during his initial visit and promptly provided a reasonably…
We loved working with George and Ibrahim and would highly recommend them. They have done splendid job on our new kitchen refurb which including new…
It's the second time I have hired George and he has been absolutely professional and the work he did resembles perfectly what I had in mind. Being an…
FAQ
Frequently Asked Questions about Flat Refurbishment Kentish Town
Why do flat refurbishment quotes in Kentish Town vary?
They rarely price the same work. One includes acoustic underlay to the lease specification, protection of the common parts and the electrician's certificate; another treats them as extras. Published UK averages of £33,000 to £48,000 for a full flat refurbishment (Checkatrade and MyJobQuote, 2026) are a starting point, not a Kentish Town price. Compare quotes line by line.
Does a Kentish Town leaseholder need the freeholder's consent to refurbish?
Yes, for anything the lease controls, and for building regulations work Camden requires it. Camden says a leaseholder must have the freeholder's consent and must make a full plans application rather than a building notice. Decoration may need no consent at all, and like for like kitchen or bathroom renewal may need only the licence to alter, depending on the lease wording.
How long does full plans approval take for a Kentish Town flat?
Camden gives a decision within 6 weeks, or 2 months for more complex proposals. For a flat that is the route a leaseholder must use, so we build that period into the programme and do not book the strip out until the approval and the landlord's licence are both in place.
Can hard floors go down in a Kentish Town flat?
Often, if the lease allows and the sound insulation is right. A lease may require carpet or an approved acoustic layer so that footsteps do not carry into the flat below. We lay the underlay or floating floor the freeholder has approved, and keep the product sheets and photographs so the managing agent can check the build up.
What EPC does a refurbished Kentish Town rental flat need?
At least E. GOV.UK says that since 1 April 2020 landlords cannot let or continue to let properties covered by the MEES Regulations with an EPC rating below E, unless a valid exemption applies. The rules are enforced by local authorities, so a refurbishment is the time to deal with heating, controls and insulation.
Does a shared flat in a Kentish Town block need a licence?
Very likely, if it is let as an HMO. Camden says HMO flats in purpose built blocks of 3 or more flats, though exempt from mandatory licensing, must still be licensed under its additional licensing scheme. The landlord checks how the flat is classed and applies. The licence works themselves are covered on our HMO conversions page, and a flat refurbishment keeps to the lease and the block's rules.
Who is responsible for the entrance door of a flat in a block?
The lease says who owns it, and the freeholder or the building's responsible person controls it, because the entrance door is part of the block's fire safety. We do not replace or alter the entrance door, or cut through compartment walls for services, without their written consent and the specification they set.
How do you stop leaks into the flat below during a refurbishment?
By isolating and capping the water before any pipework is cut, testing new runs under pressure before floors close, and fitting tanking behind and under showers. We tell the neighbour below before the bathroom is stripped and give them a contact number for the whole job, in case anything shows on their ceiling.
Can materials be delivered to a Kentish Town flat with no lift?
Yes. On a converted house or a walk-up block we carry everything by hand, in sizes that turn on the stair, and protect the treads and walls first. Where the van needs a bay outside, Camden asks for parking suspensions to be booked at least 17 days ahead, so delivery days are fixed early and bagged waste leaves on the same runs.
Every Service, One Team
More GS Renovation Services in Kentish Town
One team for every GS Renovation service in Kentish Town:
Same Service, Nearby Areas
Flat Refurbishment Near Kentish Town
We carry out flat refurbishment across Kentish Town and the surrounding areas. Explore a nearby location:
Ready to Start Your Kentish Town Project?
Free, no-obligation quote for flat refurbishment in Kentish Town.