Commercial Fit-Out Soho

Shop, cafe, restaurant, salon and clinic fit-outs in Soho, shopfront to counter under one contract, built around your opening date.

Commercial fit-out in Soho means shops, cafes, restaurants, bars, salons and clinics in period buildings around Carnaby Street, Berwick Street Market and Dean Street, often with flats upstairs. The inside is building work under Westminster's building control, while the shopfront, the signs and any shutters answer to its planning team and, where the unit falls inside it, the Soho Conservation Area. We strip out, build counters, floors, lighting, WCs and the front to your designer's drawings, and hand the unit back ready to trade.

For Soho, published UK guides put refurbishing a retail space at £1,500 to £3,000 per m² and a restaurant or cafe at £2,000 to £4,500 per m², and London units usually cost more (MyBuilder, 2026). GS Renovation Ltd, a building contractor based in Potters Bar, does the work in Soho: our own trades do the strip-out, back of house, counter fitting and finishes, and we coordinate the shopfront, extraction, electrical and fire specialists the unit needs.

Price guide

WorkIndicative range
Retail space refurbishment£1,500 to £3,000 per m²
Restaurant or cafe refurbishment£2,000 to £4,500 per m²
Shop fitting only: counters, display and fixtures, 2024 guide£60 to £140 per sq ft
Aluminium shopfront, single bay up to about 4m wide£2,000 to £5,000
Cafe kitchen extraction with basic odour control£5,000 to £12,000

Indicative ranges from published cost guides (MyBuilder, Checkatrade, Urban Shopfronts and Fan Rescue, 2026), not a quotation. Most are UK-wide figures and London work usually costs more; a row marked London is a London figure. Prices checked September 2026.

Quick estimate from UK guide figures

Guide range: choose above

Ladders, studs and boards fill a stripped-back interior midway through first fix, illustrating commercial fit-out in Soho.
Ladders, studs and boards fill a stripped-back interior midway through first fix.

The kind of commercial unit Soho actually has

Soho's customer facing units are small and close together. Carnaby Street is a shopping street, Berwick Street Market brings stalls and the shops that face them, and Dean Street and the streets around it hold restaurants, bars and cafes at street level and below. Behind a frontage like that the unit can be tight: a narrow ground floor, a lower floor for stores or a kitchen, and a separate door to the flats above.

The layout below street level shapes the job as much as the shop floor does. A lower floor used as a kitchen or store needs its own escape route and ventilation. The separate street door to the flats above also has to stay usable throughout the works, so your designer settles both on the drawings before we price. Opening dates matter here too: a closed unit in a centre this busy loses takings every day, so the programme is worked back from the day the doors open.

Shopfronts, shutters and signs on a Soho street

Changing the front of a Soho shop is a planning matter first. Westminster's shopfront design guide says the alteration and replacement of shopfronts generally requires planning permission, and advertisements may need separate advertisement consent. A canopy with no advertisements on it also needs planning permission. For units in the Oxford Street Development Corporation area, planning decisions now sit with the OSDC rather than Westminster City Council. In a conservation area such as Soho, the drawings should show the existing pilasters, fascia and stallriser and how the new front respects them in proportion and material. If the building is listed, listed building consent is needed as well, and it covers works inside the unit as well as the front.

Security needs deciding before the front is drawn. Westminster's guide says security shutters normally need planning permission and roller shutters will not normally be given consent. The alternatives to discuss are laminated glass, an internal open mesh grille or lockable timber stall panels, settled before the front is ordered. A specialist fabricator makes the front to the consented drawing, and we fit it last so the glass is not damaged during the internal works.

Use class, extraction and drains in a Soho food unit

Before a Soho cafe or restaurant is drawn, check what the unit is allowed to be. Shops, cafes, restaurants, clinics and gyms all sit in Class E, so moving between them does not usually need planning permission, but hot food takeaways, pubs and bars are sui generis and a change to one of them does. A condition on an earlier permission can also restrict the use or the opening hours, so your designer reads the unit's planning history first.

Cooking brings the hardest part of a Soho fit-out: extraction and odour control. An external duct up the rear of a building with flats above normally needs planning permission and the freeholder's agreement, and the filter and fan specification has to satisfy the residents as well as the planners. Inside, grease traps and floor gullies must connect to the existing drain runs, and the Soho Neighbourhood Plan, adopted on 8 October 2021, sits alongside the City Plan for any application.

Working around trading neighbours and residents in Soho

Soho shop units usually share a building with other traders or residents, so the programme is built around the people who stay. Westminster's Code of Construction Practice puts small projects at Level 4, where they are expected to follow its principles but need no formal approval, monitoring or fees. The 2026 version was approved in March 2026 and applies to new sites from 1 June 2026 and existing sites from 1 September 2026, so a job starting now falls under it.

Building control checks Part B fire separation and escape between the unit and the flats above. In practice the site needs dust screens and negative pressure at the shop door, deliveries booked around the market and restaurant service hours, and cutting done off the street. Where your neighbour trades late or a flat sits directly above, we agree quiet periods in writing before we start. The aim is that the landlord, the residents above and the businesses next door have no cause to complain before you open.

  • Service counters, display walls and shelving
  • Programmes worked back from your opening date
  • Fire stopping and separation to the flats above a unit
Service areaSoho · W1
Local authorityWestminster City Council
Part ofCentral London (Inner London)
Typical homesCharacterful period buildings and upper-floor apartments, most of them now flats (98% of homes)
Housing stock48% built before 1919, 5% interwar, 47% post-war; 98% flats, 2% terraced, 0% semi-detached or detached
Also covered nearbyMayfair, Bloomsbury, Marylebone, Belgravia and Clerkenwell

VOA Council Tax stock of properties, March 2025, for the Fitzrovia West & Soho statistical area, which also covers west Fitzrovia. Counts rounded by the VOA.

The GS Renovation Difference in Soho

Every week a Soho unit sits closed behind hoarding is a week of rent with no takings, so the opening date is fixed first and the programme is worked back from it. We build from your designer's consented drawings, order the shopfront and counters early because they take longest to make, and keep one contact on site until handover. The electrics, gas and fire alarm are certified by the registered installers who did that work, and we collect those papers before the keys go back.

  • Free follow-up visit after completion if anything needs attention
  • A single point of contact for your landlord, the residents above and your shop staff
  • Till, fridge and coffee machine circuits certified by a registered electrician
30+ YearsFounder's experience
Fully Insured5 year guarantee
4.9 / 531 MyBuilder reviews
Building ControlCompliant
Free QuotesNo obligation
Reviews

Rated 4.9 / 5 by our clients

★★★★★ 4.9 average from 31 verified reviews on MyBuilder

★★★★★
George always kept to commitments and arrived on time. He offered helpful suggestions during his initial visit and promptly provided a reasonably…
scomtottIslington, London · via MyBuilder
★★★★★
Saaid is the best craftsman I have worked with. He knows what he is doing from the very beginning. He has a great knowledge of construction…
volkan50816Stoke Newington, London · via MyBuilder
★★★★★
It's the second time I have hired George and he has been absolutely professional and the work he did resembles perfectly what I had in mind. Being an…
ariabuffadesignerHornsey, London · via MyBuilder
Read all 31 reviews

FAQ

Frequently Asked Questions about Commercial Fit-Out Soho

How much does a shop or cafe fit-out cost in Soho?

Published UK guides put refurbishing a retail space at £1,500 to £3,000 per square metre and a restaurant or cafe at £2,000 to £4,500 per square metre (MyBuilder, 2026), and London units usually cost more. For a Soho unit the biggest variables are the kitchen and extraction, the shopfront, the electrical supply and accessible WC work. The quote after the survey itemises each of them.

Does a new shopfront in Soho need planning permission?

Generally yes. Westminster's shopfront design guide says the alteration and replacement of shopfronts generally requires planning permission, and advertisements may need separate advertisement consent. In the Soho Conservation Area your designer should draw the new front around the existing pilasters, fascia and stallriser before it is submitted.

Can a Soho shop fit roller shutters?

Unlikely. Westminster's shopfront guide says security shutters normally need planning permission and roller shutters will not normally be given consent. Laminated glass, an internal open grille or timber stall panels are the options to discuss with your designer well before the shopfront is ordered and made.

Does a canopy over a Soho shop door need consent?

Yes. Westminster says a canopy to a shopfront with no advertisements requires planning permission, and any lettering or logo on it may need advertisement consent too. We fit the canopy once the consent is in and, where the fascia is old, a structural engineer has agreed the fixing points.

Can scaffold or hoarding go on the pavement outside a Soho shop during a fit-out?

Yes, with a licence. Westminster needs a temporary structure licence for scaffolding, construction fencing or a cherry picker in the road or on the pavement, and its building site guidance keeps the footway at least 1.5m wide around works. On a narrow Soho street that limits how far a hoarding can stand out, so the shopfront change is planned as a short, tightly timed stage.

What should a restaurant or cafe fit-out plan for first?

The planning use, the extract route and the drainage. Cafes and restaurants sit in Class E, but a hot food takeaway is sui generis, and a planning condition on the unit can restrict the use. External extract ducting normally needs planning permission and, with flats above, the freeholder's agreement. Settle all three before the layout is drawn.

What does a business fitting out a Soho unit have to do under CDM?

As the tenant commissioning the work you are a commercial client under the CDM Regulations, with duties of your own: make suitable arrangements for managing the project, allow enough time and pass on what you know about the building. The first item to pass on is asbestos information. Soho's period units were built and refitted long before asbestos was banned, so a refurbishment survey of the areas being stripped is needed before strip out starts, and its report comes to us with the landlord's fit-out rules.

What access rules apply to a new shop or salon in Soho?

Part M of the Building Regulations covers access to and use of the building, and a new or altered entrance and WC are checked against it. Level thresholds are hard to achieve on an old Soho frontage with a step up, so your designer shows the ramp, door width and WC layout on the drawings before building control sees them.

Does Westminster's Code of Construction Practice apply to a small Soho shop fit-out?

Its principles do. Westminster puts small projects at Level 4 of the Code, where they are expected to follow it but need no formal approval, monitoring or fees. The 2026 Code applies to new sites from 1 June 2026, so dust, noise and deliveries on a Soho job are managed to it.

Ready to Start Your Soho Project?

Free, no-obligation quote for commercial fit-out in Soho.

We use these details only to respond to your enquiry. See our privacy policy.

Free, no-obligation quote. We reply within 24 hours. Or call 07472 424 226.

Call 07472 424 226Free quote