Chimney Breast Removal New Cross
Chimney breast removal with steel beam support in New Cross, the beam sized by the engineer we appoint and the work signed off by building control.
- Rated 4.9 from 31 reviews on MyBuilder
- London guide: £2,200 to £3,250
- Free site survey, itemised quote
Most of the post-war flats and newer blocks in SE14 were built without chimney breasts, so this is mainly work for the Victorian terraces on the streets climbing towards Telegraph Hill Park. Those share their stacks with next door, which means a party wall notice, served by you as building owner, as well as building regulations approval, which we handle. Then we prop, remove and support on steel.
In New Cross, removing a breast on one floor typically costs £2,200 to £3,250 on a steel beam, and £3,000 to £5,000 across two floors (indicative London ranges, MyBuilder and Checkatrade, 2026). GS Renovation Ltd, a building contractor based in Potters Bar, does the work in New Cross.
Price guide
| Work | Indicative London range |
|---|---|
| One floor, steel beam (the usual route) | £2,200 to £3,250 |
| One floor, gallows brackets where the engineer and building control accept them | £1,500 to £2,500 |
| Two floors | £3,000 to £5,000 |
Indicative London ranges (MyBuilder and Checkatrade, 2026), not a quotation. Prices checked September 2026. Full breakdown: Chimney Breast Removal Guide.
How the job runs
- Free site survey at your New Cross address: which floors the breast runs through, a shared stack, any live flue.
- The engineer we appoint designs the support, and the work is registered with Lewisham Council building control or an approved inspector. On a shared wall you serve the party wall notice as building owner; we supply the drawings.
- The floor above is propped and the breast comes down in courses from the top; what remains sits on the support the engineer specified.
- Building control inspects the support before it is covered. We make good, and the completion certificate follows.

Removing a chimney breast in New Cross terraces
Most New Cross terraces still carry their original chimney breasts in the reception rooms and bedrooms, projecting into the space and eating into usable floor area. Because a breast helps carry the masonry stack above it, you cannot simply knock it out. We begin every removal with a structural engineer assessing what the breast supports and how the stack will be held once it is gone.
On the lower floors we carry the retained stack on a steel beam set on padstones, bearing into the party wall; gallows brackets are used only where the engineer and building control accept them. Where the stack is redundant on both sides, taking it down can be cleaner, but on a terrace it is shared, so that needs next door's agreement and, in the Telegraph Hill conservation area, a check on planning first. Whichever route the engineer specifies, the stack is never left unsupported.
Housing in New Cross
New Cross has about 12,080 homes on the Council Tax list: 43% pre-1919, 2% interwar and 49% post-war, with flats making up 72% and houses 28%. Since most homes here are flats, post-war blocks in New Cross rarely have breasts, so one in a flat is checked by the engineer first.
Chimney breasts, stacks and consent in New Cross terraces
With 43% of New Cross homes built before 1919, chimney breasts are part of the ordinary fabric of the older streets. Lewisham names chimney breasts alongside walls, joists and beams as load-bearing elements whose removal or partial removal needs building control approval, so taking out only the ground floor section is still notifiable work. If the breast is coming out as part of a larger job, note that Lewisham's building control fees chart has a line for a single storey extension including removal of a chimney breast. Putting the two together means one application and one scheme from the structural engineer we appoint.
The stack above the roof is a separate question. Lewisham lists alterations to the roof of a house among the changes needing planning permission under an Article 4 direction, and says those directions only apply to houses in use as a single dwelling house. In the Hatcham conservation area, a New Cross house divided into flats has no permitted development rights for exterior changes in any case. So before a redundant stack is taken down rather than supported, ask Lewisham whether the address is covered and whether the removal counts as an exterior or roof change.
Party wall and building control in SE14
New Cross terraces are tightly built, so the chimney stack almost always sits within the party wall shared with the house next door. Removing the breast, or bearing a beam into that shared wall, makes the work notifiable under the Party Wall Act, and you, as building owner, serve notice on your neighbour before starting; we supply the drawings it needs. The structural support is notifiable under building regulations.
Lewisham Council's building control, or a registered building control approver, inspects the support and signs off the finished work under the Building Regulations. This is not a planning matter for internal removal unless the house is listed. We appoint the engineer who designs the support, then handle safe staged removal and propping, capping any redundant flue with ventilation to prevent damp, and replastering so no trace of the breast remains.
Checking what remains of the stack
On the streets climbing towards Telegraph Hill the first task is establishing what is actually still there. Many of these terraces had their stacks taken down to roof level years ago, leaving a length of redundant brickwork sitting in the loft supported on very little. Others still carry full stacks and pots. The two situations lead to completely different designs, so we go into the loft before anything else is considered.
We also check the things that change the method. Flue liners are rare in houses of this age, so the flue is likely to be parged and fragile. Damp staining on the breast points to a failed cap or missing flaunching. And we look at whether the neighbouring house has already removed its side, because a shared stack with one half gone behaves very differently from one that is still intact. The findings go to the engineer with photographs, so the design reflects the house rather than a typical terrace of its date.
Doing the work in a let house
A good number of SE14 houses are let, often to students at Goldsmiths, and that changes the planning more than the building. Work of this kind is genuinely disruptive to anyone living in the room, so the practical window is the void between tenancies rather than the middle of a term. Landlords who plan a summer changeover get a clear house, an empty room and no need to negotiate access, which usually makes for a faster job and a better finish than working around occupied bedrooms.
If the property is occupied, tenants are entitled to reasonable notice and a realistic account of what the week will be like. We would rather give that honestly at the start than have someone discover it on the first morning. For an HMO the room is out of use for the duration, so the letting has to allow for it. We keep the completion certificate and the engineer's details together for your file, because that is the paperwork a lender or a buyer will ask about later, not the invoice.
- Rubble bagged and carried out rather than dropped inside
- Ground floor removal with the upper stack fully supported
- Chimney breast removal on one floor or on every floor
VOA Council Tax stock of properties, March 2025, for New Cross Gate, New Cross South and Telegraph Hill. Counts rounded by the VOA.
Trusted Chimney Breast Removal in New Cross
New Cross homeowners choose GS Renovation because we treat chimney breast removal as the structural job it is. You get an engineer-designed support, usually a steel beam on padstones, with gallows brackets only where the engineer and building control accept them, Lewisham building control handled end to end, tidy working in an occupied SE14 home, and a signed-off, fully squared-off result, backed by our founder's 30+ years on the tools.
We loved working with George and Ibrahim and would highly recommend them. They have done splendid job on our new kitchen refurb which including new…
George was brilliant. Lovely bloke, very reasonably priced and a perfectionist to boot. He completed our small kitchen renovation with care and great…
Giorgio is an excellent and intelligent workman, and with very reasonable prices! He installed a kitchen extractor fan in a complicated situation…
FAQ
Frequently Asked Questions about Chimney Breast Removal New Cross
Can you quote chimney breast removal for an SE14 property over the phone?
GS Renovation will not give a real quotation for chimney breast removal in New Cross over the phone, only the range, £2,200 to £3,250 for one floor on a beam (indicative). On 07472 424 226 we can explain what moves the cost and whether the job needs building regulations approval of the support under the retained stack, but the SE14 property has to be seen first. Builders who quote blind across Lewisham revise the figure once the floor or walls are opened.
How dusty is a chimney breast removal in a New Cross terrace?
Very, unless it is controlled from the start. The flue in an SE14 Victorian terrace is lined with loose soot and failed parging that comes down the moment the brickwork is breached, and brick dust travels through a house quickly. The shaft is sealed before opening up, the working area is screened with a zipped enclosure, and extraction runs while cutting. Waste is bagged at the point of arising.
Can a chimney breast be removed in a New Cross flat?
Sometimes, but it rarely belongs to you alone. In a converted house the breast continues through the flats above and below, and its flues may still serve them. Removing your section would leave theirs unsupported, so the engineer designs steel to carry everything overhead. The freeholder's written consent is usually required, and the other flat owners have to be part of the conversation early.
What if my New Cross neighbour has already removed their half of the chimney breast?
Then your half may now be doing more work than it was built for. The first job is to find out how theirs was supported and whether it was signed off. The engineer designs your support with that in mind, sometimes carrying both halves of the stack. A party structure notice still goes to next door at least two months before any cutting starts.
Should the whole stack come down when a New Cross chimney breast is removed?
If it is redundant on both sides, removing it to below roof level avoids holding a heavy mass in the air. On a terrace the stack is shared, though, so your neighbour must agree and notice goes to them. Where it stays up, the engineer specifies a steel beam, or gallows brackets only where the engineer and building control accept them. The roof is then retiled and the loft opening made weathertight.
Can I remove just the bedroom chimney breast in a New Cross terrace?
Yes, and it is often the simpler job. With the ground-floor breast left in place, the upper section has solid masonry beneath it, so nothing below is left hanging. The stack above still needs carrying, usually on a short steel, or on gallows brackets in the loft only where the engineer and building control accept them. The flue is capped and vented so the room does not develop damp.
How soon can a New Cross chimney breast come out once building control is notified?
Lewisham says that once a building notice is submitted, work can commence within 48 hours. That speed only helps if the support is already designed. The structural engineer we appoint needs to see the stack in the loft and the breast on each floor first, so the steel and the padstones are specified before the notice goes in. In a let house near Goldsmiths that sequence lets the work fit between tenancies.
What paperwork should a New Cross seller keep after a chimney breast removal?
The completion certificate above all. Lewisham Building Control's typical inspection stages end with completion of building, and the certificate issued after that visit is what a buyer's solicitor asks for. Keep the structural engineer's calculations and drawings with it, so a buyer's surveyor can see how the stack is carried. If the breast stood against a party wall, a copy of the party wall notice and any award completes the file.
Does a listed house in New Cross need consent to remove a chimney breast?
Yes. Listed building consent covers internal work as well as external, and a breast with its fireplace and flue is part of the listed fabric. Lewisham has around 368 nationally listed building entries, most of them Grade II and 38 of them Grade II*. Consent is needed before work starts, alongside building control approval. The structural engineer we appoint then designs support that disturbs as little original brick and timber as possible.
Every Service, One Team
More GS Renovation Services in New Cross
One team for every GS Renovation service in New Cross:
Same Service, Nearby Areas
Chimney Breast Removal Near New Cross
We carry out chimney breast removal across New Cross and the surrounding areas. Explore a nearby location:
Ready to Start Your New Cross Project?
Free, no-obligation quote for chimney breast removal in New Cross.