Chimney breast removal with steel beam support in Borough, the beam sized by the engineer we appoint and the work signed off by building control.

Buildings around Borough High Street sit tightly packed, and the chimney is almost always in the shared wall, so the Party Wall Act applies and you, as building owner, serve notice on the neighbour, or your surveyor does. We supply the drawings the notice needs, agree access, and programme the work to suit the neighbours. Then the engineer's steel goes in and the room is put back together.

In Borough, removing a breast on one floor typically costs £2,200 to £3,250 on a steel beam, and £3,000 to £5,000 across two floors (indicative London ranges, MyBuilder and Checkatrade, 2026). GS Renovation Ltd, a building contractor based in Potters Bar, does the work in Borough.

Price guide

WorkIndicative London range
One floor, steel beam (the usual route)£2,200 to £3,250
One floor, gallows brackets where the engineer and building control accept them£1,500 to £2,500
Two floors£3,000 to £5,000

Indicative London ranges (MyBuilder and Checkatrade, 2026), not a quotation. Prices checked September 2026. Full breakdown: Chimney Breast Removal Guide.

How the job runs

  1. Free site survey at your Borough address: which floors the breast runs through, a shared stack, any live flue.
  2. The engineer we appoint designs the support, and the work is registered with Southwark Council building control or an approved inspector. On a shared wall you serve the party wall notice as building owner; we supply the drawings.
  3. The floor above is propped and the breast comes down in courses from the top; what remains sits on the support the engineer specified.
  4. Building control inspects the support before it is covered. We make good, and the completion certificate follows.
A red oxide steel beam installed by GS Renovation with the surrounding structure still propped
The beam in and carrying, with props left standing until the bearings have gone off.

Removing a chimney breast in Borough

Borough's older flats and terraces often still carry their original chimney breasts, long after the open fires stopped being used. Because the breast helps carry the masonry and stack above it, we never treat removal as a simple knock-out. Every job starts with a structural engineer confirming what sits overhead and how the retained brickwork will be held once the breast at that level is gone.

Where we remove a breast on a lower floor but the stack continues up through the house, we support the retained masonry on a steel beam bearing into the party wall, or on gallows brackets bolted into it where the engineer accepts them. In taller SE1 terraces where the stack is fully redundant, we often take the whole stack down and make the roof good, so nothing is ever left hanging unsupported.

Housing in Borough

Borough has about 12,140 homes on the Council Tax list: 18% pre-1919, 3% interwar and 73% post-war, with flats making up 94% and houses 6%. Where most homes are flats, post-war blocks in Borough rarely have breasts, so one in a flat is checked by the engineer first.

Taking out a pre-1919 chimney breast in a Borough building

In Borough 18% of homes were built before 1919 and just 3% between 1919 and 1939, and a chimney breast in one of those older buildings shapes the job. The breast is soft brick in lime mortar, the flues are often gathered together above the first floor, and the stack may lean on the one next door. When the breast comes out, the structural engineer we appoint designs support for what remains above, and the brick it bears on is checked before the design is final.

Southwark Council's online form lets you begin a building regulations application as a building notice, full plans or regularisation. A single breast on engineered steel is a common candidate for a building notice, because the design is short and the key inspection is on site. Book the inspection for the moment the steel is in and packed, before it is boxed and plastered. A Borough job that closes up the support before the inspector sees it has to open it again.

Party wall and building control in SE1

In Borough's older terraces and converted buildings, the chimney stack almost always sits within the party wall shared with the house next door. That makes removing the breast, and bearing a beam or fixing brackets into the shared masonry, notifiable under the Party Wall Act. You, as building owner, serve the correct notice on your neighbour before work starts, using the drawings we supply, so the shared wall is protected and everyone knows what is happening.

The structural support we install is notifiable under the Building Regulations, so Southwark Council's building control inspects and signs it off. We appoint the engineer for the calculations, carry out the propping and safe removal, cap any redundant flue with ventilation to stop damp forming, and replaster so there is no trace the breast was ever there. You get a tidy chimney alcove and a signed-off result.

Working in a tight SE1 street

Chimney removal produces a surprising volume of brick, mortar and soot, and around Borough High Street there is rarely a front garden to stand it in. We plan the waste route out of the building before anything comes down, protect the stairs and hallway, and arrange either a permitted skip or a grab collection, since a skip standing on the public highway needs a licence from Southwark Council and often a parking suspension. Soot is dusty and it stains, so the flue is swept and bagged before any breaking out begins.

Noise is the other consideration in closely built SE1 property. Breaking out brickwork is loud and it travels through party structures, so we agree hours in advance and give neighbours warning. In a leasehold flat the building's own rules on working hours and lift use apply on top of everything else, and where the property is listed or in a conservation area, altering the visible stack needs consent first.

Doing this before the rewire and replaster

The order you do things in decides how much you pay for twice. Removing a chimney breast opens a wall, disturbs the floor at the hearth and leaves a fresh patch of plaster behind, so it belongs near the start of a programme of works rather than at the end of one. Replaster a room and lay a new floor first, and taking the breast out afterwards means paying for part of both again.

If a rewire is coming, do the removal first. The electrician then chases and drops cables into a wall that is already in its final position instead of working around brickwork about to disappear. The same applies to flooring, which should go down after the hearth void is filled and levelled, and to any fitted joinery. Around Borough Market many flats sit above shops and restaurants, where access to the space below is negotiated once rather than repeatedly.

  • Making good, plastering and reinstating the wall line
  • Ceiling and joist support where the breast carried them
  • Rubble bagged and carried out rather than dropped inside
Service areaBorough · SE1
Local authoritySouthwark Council
Part ofSouth London (Inner London)
Typical homesModern and post-war flats among older commercial buildings
Housing stock18% built before 1919, 3% interwar, 73% post-war; 94% flats, 6% terraced, 0% semi-detached or detached
Also covered nearbyBermondsey, Wapping, Vauxhall, Whitechapel and Kennington

VOA Council Tax stock of properties, March 2025, for Borough & Southwark Street and Southwark St George's. Counts rounded by the VOA.

Trusted Chimney Breast Removal in Borough

Borough homeowners choose GS Renovation because we treat chimney breast removal as the structural job it is. You get support designed by the engineer we appoint, a steel beam on padstones, or gallows brackets only where the engineer and building control accept them, properly installed, the programme built around the party wall notice you serve on your neighbour, and Southwark building control handled to sign-off, all delivered tidily in an occupied home and backed by our founder's 30+ years on the tools.

30+ YearsFounder's experience
Fully Insured5 year guarantee
4.9 / 531 MyBuilder reviews
Building ControlCompliant
Free QuotesNo obligation
Reviews

Rated 4.9 / 5 by our clients

★★★★★ 4.9 average from 31 verified reviews on MyBuilder

★★★★★
We loved working with George and Ibrahim and would highly recommend them. They have done splendid job on our new kitchen refurb which including new…
kath833Wood Green, London · via MyBuilder
★★★★★
George always kept to commitments and arrived on time. He offered helpful suggestions during his initial visit and promptly provided a reasonably…
scomtottIslington, London · via MyBuilder
★★★★★
Saaid is the best craftsman I have worked with. He knows what he is doing from the very beginning. He has a great knowledge of construction…
volkan50816Stoke Newington, London · via MyBuilder
Read all 31 reviews

FAQ

Frequently Asked Questions about Chimney Breast Removal Borough

Why do chimney breast removal quotes in Borough vary so much?

Chimney breast removal quotes in Borough spread widely because scope, not skill, is what differs. A figure that omits the engineer's design, the Southwark Council building control fee or the making good will always undercut one that includes them. Sequence is where cheap quotes cut corners: the steel under the stack is inspected before it is boxed in. GS Renovation lists each element for the SE1 address against £2,200 to £3,250 for one floor on a beam (indicative).

What does building control actually inspect during a chimney breast removal in SE1?

Two things above all: the temporary propping and the permanent bearing. Southwark Council's inspector wants to see the support arrangement before it is plastered over, which means a visit while the padstones, the beam ends or the bracket fixings are still exposed. In a Borough flat or terrace they also check the retained flue is capped and vented. A completion certificate follows, and that is the document your solicitor will want.

Can I remove the chimney breast in my Borough flat when the flats above keep theirs?

Only once the masonry above is properly carried. The breasts in the flats overhead sit on yours, so the engineer designs a steel beam beneath them, with gallows brackets used only where building control accepts them. Because the breast is shared structure, the freeholder's written consent is needed under the lease, and a party structure notice goes to the owners affected at least two months ahead.

Is there a real chimney breast in my postwar Borough flat?

Sometimes not. With 73% of Borough's stock dating from after 1945, plenty of flats here sit in blocks that used slim flue blocks or boxed ducts instead of a deep brick breast. What looks like a breast may be a riser carrying services for the whole block. It is opened up and checked before any plan is made, because removing a shared riser is not an option.

Who deals with the stack on the roof when my Borough flat's breast comes out?

Usually the freeholder, since the roof and stack are part of the building they own. Your unused flue still needs to be capped at the top and ventilated so moisture does not collect in it, and that work on the roof needs their agreement and access arrangements. It is agreed when the licence to alter is granted, not left until the internal work is done.

What paperwork will a buyer want after chimney breast removal in a Borough flat?

Two documents in particular. The completion certificate from Southwark Council's building control shows the support was inspected, and the freeholder's licence to alter shows the lease was complied with. The engineer's calculations and any party wall award should be filed alongside them. A buyer's solicitor for a leasehold flat will ask for all of it.

Does removing a chimney breast in Borough need an agreement with next door?

It can. Southwark's Householder SPD notes that certain works may need a Party Wall Agreement with neighbours, which is separate from any planning permission. A breast that sits on the party wall, or steel that bears into it, brings the neighbour in. The building owner serves the notice, with our drawings attached, and the programme waits for the notice period to run or for the neighbour to consent.

Can the chimney stack come off a Borough roof in the Liberty of the Mint?

Ask Southwark first. The Liberty of the Mint Conservation Area lies broadly to the west and south of Borough Tube Station, and a chimney stack is part of the roofline planners look at there. The breast inside is a building control matter. Keeping the stack and carrying it on steel within the roof space keeps the work internal, whereas taking it down changes the outside of the building. In a flat the stack also belongs to the freeholder.

Can a boxed column in a post-war Borough flat pass for a chimney breast?

Easily, which is why nothing is cut before it is identified. In Borough 73% of homes were built after 1945, and in blocks of that age a projection in the wall can be a structural column, a service riser or a ventilation duct. None of those is a breast. We open a small inspection hole, the structural engineer we appoint identifies what is there, and the design follows from that.

Same Service, Nearby Areas

Chimney Breast Removal Near Borough

We carry out chimney breast removal across Borough and the surrounding areas. Explore a nearby location:

Ready to Start Your Borough Project?

Free, no-obligation quote for chimney breast removal in Borough.

We use these details only to respond to your enquiry. See our privacy policy.

Free, no-obligation quote. We reply within 24 hours. Or call 07472 424 226.

Call 07472 424 226Free quote