Flat Conversions New Cross

Houses divided into self-contained flats in New Cross, separating floors, a protected stair and separate services for every flat.

Flat conversions in New Cross start from the houses that are still whole: terraced houses make up 25% of homes in the VOA count for New Cross Gate, New Cross South and Telegraph Hill, against 72% flats. Splitting a house into self-contained flats needs planning permission, and Lewisham's Policy HO2 expects a family sized home to be re-provided unless the property is unsuitable for families. We build the approved scheme, with fire separation, sound insulation, separate services and room sizes worked out before the first stud wall goes up.

In New Cross, converting a house into two or three flats is published at £50,000 to £120,000 including professional and council fees, and an England-wide guide puts a straightforward two-flat split at £40,000 to £80,000 in construction alone, which is the part a builder prices (indicative London ranges, Architectural Drawings and Mayfair Studio, 2026). GS Renovation Ltd, a building contractor based in Potters Bar, does the work in New Cross: we build the conversion to the approved drawings, building control inspects the fire and sound separation, and a registered electrician certifies each flat's electrics.

Price guide

WorkIndicative range
House into 2 to 3 flats in London, fees and build (Architectural Drawings)£50,000 to £120,000
Build cost per square metre, London (Architectural Drawings)£1,000 to £2,000
House into 2 flats, construction only, England-wide guide (Mayfair Studio)£40,000 to £80,000
Sound insulation and fire separation, England-wide guide (Mayfair Studio)£5,000 to £15,000
Separate utility connections, 3 flats, London (Architectural Drawings)£3,000 to £6,000

Indicative ranges from published cost guides (Architectural Drawings and Mayfair Studio, 2026), not a quotation. Each row names its source and whether it is a London, UK or England-wide figure. Prices checked September 2026.

Quick estimate from published guides

Guide range: choose above

Pink fire-rated plasterboard being fixed by GS Renovation to battens around a steel beam, set out with a laser level
Fire board going onto a steel. Where flats sit one above another, whatever carries the floor between them needs fire protection too.

Lewisham's family housing test for a New Cross conversion

A house to flats conversion in New Cross normally has to keep a family home in the mix. Lewisham Local Plan Policy HO2 supports turning a single family dwelling or a 3+ bedroom unit into smaller self-contained flats only where set criteria are met. One of those is that the scheme re-provides a family sized unit of 3 or more bedrooms, unless the house is shown to be unsuitable for family accommodation. A terrace split into studios alone does not normally fit that policy.

In practice this sets the layout of a New Cross conversion. The larger unit can take the ground floor and garden, with a smaller flat above, and the stair is arranged so each unit has its own front door off a protected hall. The London Plan small sites text lists residential conversions that add homes among the forms of incremental intensification, which is the wider backdrop to HO2. Your designer or planning agent makes the application, and we price the build from the drawings.

Housing in New Cross

For New Cross the Council Tax list gives about 12,080 homes; by type 72% flats and 28% houses, by age 49% post-war, 2% interwar and 43% older than 1919. Since most homes here are flats, a flat in New Cross can be split or combined only with the freeholder's consent, and changing the number of homes usually needs planning permission as well.

Room sizes and ceiling heights in a converted New Cross house

The London Plan space standards apply to conversions as well as new build, since its table treats a new dwelling as including conversions and change of use. Under Policy D6 a one-bedspace single bedroom must be at least 7.5 square metres and at least 2.15m wide, and a two-bedspace double or twin bedroom needs at least 11.5 square metres. Lewisham Policy QD8 asks housing proposals to meet and where possible exceed these standards. In a narrow New Cross terrace, the back bedroom on each floor is where the figures bite.

Policy D6 also sets a minimum floor to ceiling height of 2.5m for at least 75 per cent of each dwelling's gross internal area. Victorian upper floors can fall short once new floors are built up for sound insulation, so we measure existing heights at survey and tell your designer what the build-up leaves. GOV.UK notes that the Nationally Described Space Standard sits in the planning system, not the building regulations, so in New Cross these sizes are settled at planning stage.

Fire separation and sound testing between New Cross flats

Splitting a house is a material change of use, so the building regulations apply to the whole result, not just the new walls. Part B asks for fire separation between the flats and a protected escape route: fire resisting floors between units, fire doors onto the common stair, detection linked as the fire strategy requires, and fire-stopping wherever pipes and cables cross. The strategy comes from your designer and building control, and in a New Cross terrace we open the old floors and build it in before anything is boarded.

Part E sets the sound standard. Approved Document E sets at least 43 dB airborne for walls and floors in flats formed by a change of use, and 64 dB maximum impact for floors and stairs. A bare Victorian timber floor is not built to that standard, so we add resilient bars, insulation and heavier boards to the ceilings below and a floating layer above. Pre-completion sound testing follows, and we leave time in the New Cross programme for it before decoration.

Separate services, addresses and neighbours in a New Cross conversion

Each new flat in a New Cross conversion needs to stand on its own. That means a separate electricity supply and meter, a separate gas supply or electric heating, its own water supply where the water company requires it, and drainage that does not run through another flat without access. Lewisham uses a full plans application for any new proposal to build above or within 3 metres of a drain or sewer, so the drain runs are traced before the building control route is chosen. New flats also need addresses through the council's street naming and numbering service.

Party walls come into it when the work cuts into a wall shared with the house next door, such as new steel bearings or a chase for a stack. Lewisham Building Control says the Party Wall Act is a civil matter it does not administer, so the building owner serves any notices, and the work proceeds on written consent or an agreed award. New dwellings can also fall under Lewisham's CIL, levied since 1 April 2015, and your designer checks liability before work starts.

  • Heating and hot water for each flat, gas by a Gas Safe registered engineer
  • New soil stacks, wastes and bathrooms stacked floor over floor
  • Decoration, flooring and making good throughout, ready to let or sell
Service areaNew Cross · SE14
Local authorityLewisham Council
Part ofSouth East London (Inner London)
Typical homesVictorian terraces and post-war infill housing
Housing stock43% built before 1919, 2% interwar, 49% post-war; 72% flats, 25% terraced, 3% semi-detached or detached
Also covered nearbyDeptford, Peckham, Bermondsey, Catford and Camberwell

VOA Council Tax stock of properties, March 2025, for New Cross Gate, New Cross South and Telegraph Hill. Counts rounded by the VOA.

Why New Cross Homeowners Choose GS Renovation

You get one team for the structural, fire and acoustic work a conversion depends on. We build to the approved drawings, follow your structural engineer's details for any new openings, and give you a written programme with the building control stages and the sound test marked. Our founder has more than thirty years of hands-on experience. A registered electrician certifies the wiring and alarms in each flat, and a registered gas engineer handles any boilers, so each unit is handed over with its own paperwork.

  • Full plans application to building control, never a building notice
  • Registered in England, Companies House no. 14611254
  • Every flat checked against the space standard before the layout is priced
30+ YearsFounder's experience
Fully Insured5 year guarantee
4.9 / 531 MyBuilder reviews
Building ControlCompliant
Free QuotesNo obligation
Reviews

Rated 4.9 / 5 by our clients

★★★★★ 4.9 average from 31 verified reviews on MyBuilder

★★★★★
George was brilliant. Lovely bloke, very reasonably priced and a perfectionist to boot. He completed our small kitchen renovation with care and great…
OscarCrofton Park, London · via MyBuilder
★★★★★
Giorgio is an excellent and intelligent workman, and with very reasonable prices! He installed a kitchen extractor fan in a complicated situation…
Adil KhanWoolwich, London · via MyBuilder
★★★★★
Saaid is the best craftsman I have worked with. He knows what he is doing from the very beginning. He has a great knowledge of construction…
volkan50816Stoke Newington, London · via MyBuilder
Read all 31 reviews

FAQ

Frequently Asked Questions about Flat Conversions New Cross

How much does it cost to convert a house into flats in New Cross?

Published London figures put converting a house into two or three flats at £50,000 to £120,000 including professional and council fees (Architectural Drawings, 2026), and an England-wide guide puts a straightforward two-flat split at £40,000 to £80,000 in construction alone (Mayfair Studio, 2026). A New Cross scheme moves with the number of flats, the separating floors and the new services. Design, planning and building control fees sit outside our building quote.

Can a New Cross house be converted into flats?

Yes, where it meets Lewisham's criteria. Dividing a house into flats is a material change of use, so the owner or their designer applies for planning permission. Policy HO2 supports converting a single family dwelling into smaller self-contained units only where set criteria are met, including re-providing a family sized unit of 3 or more bedrooms unless the house is unsuitable for family use. We build the approved layout.

What room sizes must new flats in New Cross meet?

The London Plan minimums. Under Policy D6 a single bedroom must be at least 7.5 square metres and 2.15m wide, and a double or twin bedroom at least 11.5 square metres, with the table covering conversions as well as new build. Lewisham Policy QD8 asks schemes to meet and where possible exceed them. We check the drawings against these sizes before partitions are set out.

How is sound between converted flats dealt with?

Through the separating walls and floors. Approved Document E sets at least 43 dB airborne sound insulation for walls, floors and stairs in flats formed by a change of use, and a maximum of 64 dB impact sound for floors and stairs. We build the separating floors and walls to your designer's specification and leave time in the programme for pre-completion sound testing.

Is the ceiling height in a New Cross terrace high enough for flats?

Often it is tight on the upper floors. Policy D6 sets a minimum floor to ceiling height of 2.5m for at least 75 per cent of each dwelling's gross internal area, and new acoustic floors take height away. We measure every room at survey and give your designer the finished heights the build-up will leave.

Does each new flat need its own meters and address?

Yes, in practice. Each flat should have its own electricity meter, heating and water arrangement, and suppliers normally want an official address before setting up a supply. The council's street naming and numbering service issues the new addresses. We plan meter positions and service routes with the suppliers so the connections are booked before completion.

Who deals with the neighbours' party wall on a New Cross conversion?

The building owner. Lewisham Building Control says the Party Wall Act is a civil matter and it is not involved in its administration. Where the conversion cuts into or builds on a shared wall, you or your surveyor serve the notices and agree any award before those works start. We programme the party wall work to follow the award.

Can flats in New Cross be turned back into a single house?

Yes, physically, and the building work is simpler than the original split. It involves removing extra kitchens and bathrooms, opening the staircase back up to one house, and arranging with the suppliers to merge the meters. Merging flats reduces the number of homes, so settle the planning position with your designer before work starts. We carry out the strip-out and refinish the house.

Does a new drain connection affect a New Cross conversion?

It can change the paperwork. Lewisham uses a full plans application for building above or within 3 metres of a drain or sewer. Its guidance also says to apply for a build over agreement before any works if your home is within 3 metres of a public drain or 1 metre of a public lateral drain. Extra kitchens and bathrooms often mean a new stack or rear connection, so we trace the drains at survey.

Same Service, Nearby Areas

Flat Conversions Near New Cross

We carry out flat conversions across New Cross and the surrounding areas. Explore a nearby location:

Ready to Start Your New Cross Project?

Free, no-obligation quote for flat conversions in New Cross.

We use these details only to respond to your enquiry. See our privacy policy.

Free, no-obligation quote. We reply within 24 hours. Or call 07472 424 226.

Call 07472 424 226Free quote