One contract covering design and construction, one price against an agreed scope, and one company answerable from survey to completion certificate.
Design and build is not a type of building work. It is a way of buying it. Under a design and build arrangement one company holds both the design and the construction, so you sign one contract, get one price and have one organisation to hold responsible when something does not line up. GS Renovation Ltd works this way on domestic projects across Central and Greater London, and this page explains exactly how it works, what it costs you and where it is the wrong choice.
The traditional route is architect first, then tender. You appoint a designer, they develop the scheme and obtain consents, an engineer is appointed alongside them, the drawings are completed and then the finished design is priced by two or three contractors. The traditional route gives you competitive pricing on a fixed design and an independent professional acting for you. What it does not give you is a single point of responsibility: when the drawings do not resolve on site, the designer and the contractor each have a defensible account of whose problem it is, and you are the one standing between them.
Design and build closes that gap by putting both under one contract. The trade off is that you give up some design control and some ability to compare like for like tenders, because there is no completed design to tender.
| Traditional: architect then tender | Design and build | |
|---|---|---|
| Contracts you hold | Separate: designer, engineer, contractor | One, with the contractor |
| When you get a firm price | Once the design is complete, at tender | Earlier, against an agreed scope and specification |
| Who resolves a clash between drawing and site | You, between two consultants | The contractor, inside their own contract |
| Design control | High, the designer works for you throughout | Lower once the scope is fixed, changes are variations |
| Cost certainty before work starts | Good, on a completed design | Good on the agreed scope, but the scope must be defined properly |
| Best suited to | Complex, design-led or heritage projects | Well understood project types where delivery and programme matter most |
Being straightforward about our own role matters more here than anywhere else on this site. GS Renovation is a building contractor. We are not architects, structural engineers or party wall surveyors, and design and build does not change that. What it changes is who holds the appointments.
The single most useful thing in any building contract is that money follows completed work. Payments should be staged against defined milestones, such as completion of substructure, structure complete and watertight, first fix complete, and practical completion. A large deposit before anything has happened protects nobody but the builder. Long lead time materials, meaning steel, joinery, stone and glazing, are the legitimate exception and should be itemised as such rather than folded into a lump sum.
Variations are where domestic projects unravel, and design and build makes the distinction sharper rather than softer. A change you instruct, a better worktop, a moved door, an extra socket run, is a variation: it gets priced and agreed in writing before it is carried out. A change needed because the design does not work is not a variation, it is ours to resolve within the contract sum, and that is precisely the risk you are paying us to carry.
The genuine exception is what nobody could see. Foundations that are shallower than expected, a rotten wall plate, asbestos in a 1960s artex ceiling, a drain that is not where the survey says it is. Those are handled as provisional sums and a contingency, both stated plainly in the quotation. A contractor who tells you there will be no unknowns on a Victorian house is telling you something about the contractor. Our budget and contingency guide explains how to set the contingency, and the renovation mistakes guide covers the rest.
This section exists because the term is oversold. Design and build is a good route for a lot of London projects and a bad one for some, and the difference is worth knowing before you sign.
If you already have an architect and drawings, that is not a problem and it is not wasted. We will price and build to a completed design as a straightforward main contractor, which is the traditional route, and quite often it is the right one. Our guide to who does what explains where the architect's role ends and the engineer's begins.
Design and build is priced against a scope rather than against a rate card, but the underlying benchmarks are the same ones published across this site.
| Project type | Basis | Typical London figure |
|---|---|---|
| Full refurbishment, mid-range | Per m² of internal floor area | £1,500 to £2,200 per m² |
| Full refurbishment, high end or structural | Per m², including structural openings and premium finishes | £2,500 to £3,500+ per m² |
| Single storey extension | Per m² of new floor area, standard to mid-range finish | £2,000 to £3,700 per m² |
| Side return extension | Complete project on a London terrace | £60,000 to £100,000 |
| Double storey rear extension | Complete project, from | from £75,000 |
| Wraparound extension | Complete project on a London terrace | £80,000 to £130,000 |
| Loft conversion | Rooflight through to mansard, by type | £30,000 to £100,000+ |
| Basement | Complete project under a London terrace | £100,000 to £250,000+ |
On a traditional route you would pay the designer and engineer separately, typically 10 to 15 per cent of the build cost between them plus application fees. Under design and build those appointments sit inside our price. The money does not disappear, it moves, and you should be able to see it in the quotation either way.
Holding the design does not mean doing it. It means appointing the right people and making sure what they issue actually reaches site.
Under CDM 2015 the client duties on a domestic project pass to the contractor in most cases, and where more than one contractor is involved someone must be appointed principal contractor. On a design and build project that is us, and it is a fair question to put to anyone quoting for your work.
FAQ
A design and build contractor holds both the design and the construction of a project under a single contract. Instead of appointing an architect and an engineer yourself and then tendering the finished drawings, you agree a scope and a budget with the contractor, who appoints the design team and carries responsibility for coordinating drawings and construction. You sign one contract, get one price against an agreed scope and have one company answerable for the outcome.
Not automatically. On a traditional route you pay the designer and engineer separately, typically 10 to 15 per cent of build cost between them, and you get competitive tenders on a completed design. Under design and build those fees sit inside the contractor's price and you trade some competitive tension for a single point of responsibility and usually a shorter overall programme. Design and build tends to win on time and on coordination risk rather than on headline price.
You still need design, but you do not have to appoint the designer yourself. On a design and build project we appoint the architect or architectural designer and the structural engineer, and they work under our contract. The design is still produced by qualified independent professionals, and structural calculations always come from a chartered engineer. GS Renovation is a building contractor and never produces structural calculations itself.
Money should follow completed work. Payments are tied to defined milestones such as substructure complete, structure complete and watertight, first fix complete and practical completion. Long lead time materials such as steel, glazing, stone and joinery are itemised separately rather than hidden in a lump sum. A large deposit paid before anything happens protects the builder and not you, and we do not ask for one.
Under design and build, we do. A change needed because the design does not work is not a variation and is resolved within the contract sum, which is the risk you are paying the contractor to carry. A change you instruct is a variation and is priced and agreed in writing before it is carried out. Genuinely unforeseeable conditions in an older property, such as shallow foundations or asbestos, are handled through stated provisional sums and a contingency.
When the architecture is the point. A design-led scheme, a listed building or a heritage project usually deserves a designer working directly for you, developing the design properly and then tendering it, with an independent contract administrator on your side of the table. Design and build is also the wrong route if you want to compare like for like tenders on a completed design. We will say so at survey rather than sell you the route that suits us.
What We Deliver This Way
The project types most often delivered under a single design and build contract.
Free Quote
Send us the brief, the property and any drawings you already have. We will survey it, tell you which route suits it and price the work properly.
Call 07472 424 226 to talk through scope, programme and price with the contractor who would run it.
Get Your Free Quote