Office Fit-Out Hammersmith
Office fit-outs for small and medium office suites in Hammersmith, partitions, ceilings, lighting and small power for your office, with the IT and specialist trades coordinated.
- Rated 4.9 from 31 reviews on MyBuilder
- UK guide: £70 to £120 per sq ft
- Free site survey, itemised quote
Office fit-out in Hammersmith sits in a real office market. The borough's Local Plan describes Hammersmith town centre, around Hammersmith Broadway, as the council's preferred office location and seeks to stop it losing office uses. We work at the scale of a small builder: a suite being refitted for a new tenant, a floor above shops on the approach to the Broadway, a studio or a professional office. We strip out, build partitions, ceilings and floors, and coordinate the specialist trades.
For Hammersmith, the construction part of an office fit-out is published at £70 to £120 per sq ft as a UK guide, and an all-in London office fit-out at £148 to £359 per sq ft (Oktra and Cushman and Wakefield, 2026). GS Renovation Ltd, a building contractor based in Potters Bar, does the work in Hammersmith: we build the office partitions, ceilings, lighting and finishes as one contract and coordinate the IT supplier and specialist trades around them.
Price guide
| Work | Indicative range |
|---|---|
| Office fit-out, construction only | £70 to £120 per sq ft |
| London office fit-out, all-in | £148 to £359 per sq ft |
| Metal stud partition, boarded both sides | £55 to £65 per m² |
| Suspended ceiling, grid and tile | £22 to £35 per m² |
| Dilapidations at lease end | £15 to £20 per sq ft |
Indicative ranges from published cost guides (Cushman and Wakefield, Oktra and Checkatrade, 2026), not a quotation. Most are UK-wide figures and London work usually costs more; a row marked London is a London figure. Prices checked September 2026.
Quick estimate from UK guide figures
Guide range: choose above

Hammersmith town centre and the office space it keeps
The Local Plan names Hammersmith town centre as the council's preferred office location and seeks to stop it losing office uses. For a business taking space here, that policy is meant to keep office floors around the Broadway in office use. A fit-out that leaves the floor lettable as an office, with sensible partitions and services a later tenant can reuse, works with the council's aim and with your landlord's.
The London Plan asks boroughs to use Article 4 Directions so that office clusters are not undermined by office to residential permitted development. Hammersmith and Fulham says full planning permission has been needed for office to residential conversions since a direction came into place on 28 April 2018. That is the landlord's planning question, not the tenant's. For you it means a suite is expected to be refitted for the next business rather than turned into flats.
Cat A and Cat B in a Hammersmith office suite
Cat A is the landlord's base finish for a Hammersmith office: ceilings, lighting, raised floor or trunking, heating and cooling, WCs and a finished shell. Cat B is the tenant's fit-out on top of it: partitions and glazed screens, meeting rooms, a tea point or kitchenette, extra small power, signage and furniture. Ask the agent which category the space is offered at, because a Cat A suite can need most of its ceiling grid and lighting adjusted around your new rooms.
In a floor above shops, or a suite in a converted period building, there may be no Cat A at all. Those spaces start from bare plaster and old wiring, so the fit-out includes the base work as well: a new distribution board, lighting, heating and a WC or shower where the drainage reaches. We coordinate your IT supplier for data cabling, fixing containment routes before the ceilings close so the cabling goes in without opening finished work.
Building control and fire safety for Hammersmith offices
Office fit-out work in Hammersmith that needs building regulations approval goes on a Full Plans application where the council is the building control body. Its guide says offices must be built on Full Plans because the London Fire Authority has to be consulted. The council aims to decide a Full Plans application within 5 weeks, though it may take longer, so the application goes in well before the start date. Part B covers escape routes and fire separation, Part M access, and Part L lighting and services.
The fire strategy fixes the travel distances, which doors are fire rated and self closing, where emergency lighting goes and how the alarm is extended into new rooms. Glazed meeting rooms can lengthen escape routes, so their layout is checked against the strategy before glass is ordered. We sequence fire stopping above the ceilings for inspection before the tiles go in. Completion inspections need 5 days' notice, which we build into the last week before you move in.
Working in an occupied Hammersmith office building
A Hammersmith office fit-out often happens in a building where other tenants are still working, and the landlord's licence for alterations sets the rules. Noisy work is kept within the council's limit of 8am to 6pm on weekdays and 8am to 1pm on Saturdays, and a landlord may push drilling and cutting outside core office hours on top of that. Lift use, loading, and protection to reception and corridors are agreed with the building manager before the start date.
As a business commissioning construction work, you are a commercial client under the CDM Regulations, with duties of your own: allowing enough time and resources, and passing on what you know about the building, such as asbestos surveys. At the end of a lease, the same trades carry out dilapidations and reinstatement, stripping out partitions and returning the space to the condition the lease describes. We price that work against the schedule of dilapidations your surveyor agrees with the landlord.
- Strip-out of the previous tenant's office, with disposal
- Data containment laid for your IT supplier to cable
- Tea points and kitchenettes on the existing risers
VOA Council Tax stock of properties, March 2025, for Hammersmith Broadway, Brook Green, Ravenscourt Park North and Ravenscourt Park South. Counts rounded by the VOA.
The GS Renovation Difference in Hammersmith
An office fit-out in Hammersmith runs against a lease date, a landlord's licence and a building still in use. We are a small, founder-led builder, and we price from a survey of the actual space rather than a rate per square metre. You get a written sequence covering strip out, partitions, fire stopping, ceilings and making good, and one contact who deals with the building manager. Electrical, alarm and mechanical work is carried out and certified by the specialist trades the job needs.
- Office strip-out and core drilling booked outside other tenants' working hours
- A programme built back from the date your staff move in
- Free, no-obligation quotations
George always kept to commitments and arrived on time. He offered helpful suggestions during his initial visit and promptly provided a reasonably…
It's the second time I have hired George and he has been absolutely professional and the work he did resembles perfectly what I had in mind. Being an…
Saaid is the best craftsman I have worked with. He knows what he is doing from the very beginning. He has a great knowledge of construction…
FAQ
Frequently Asked Questions about Office Fit-Out Hammersmith
Why do office fit-out quotes in Hammersmith vary so much?
Because the scope differs. One quote covers only partitions and ceilings; another includes fire alarm changes, lighting, data containment, the tea point and out-of-hours working. Published guides give £70 to £120 per square foot for the construction element (Oktra, 2026). Compare quotes against the same written scope.
What is the difference between Cat A and Cat B in a Hammersmith office?
Cat A is the landlord's base build: ceilings, lighting, floors, heating and cooling, and WCs, ready for a tenant. Cat B is the tenant's layer: partitions, meeting rooms, kitchenette, extra power, finishes and signage. In the smaller suites around Hammersmith Broadway the line is often blurred, so we list what the space has before we price the rest.
Does an office fit-out in Hammersmith need a Full Plans application?
Yes, where it includes building work and the council is the building control body. Hammersmith and Fulham's building control guide says offices must be built on a Full Plans application because the London Fire Authority is consulted. Allow for that in the programme, since the council aims to decide within 5 weeks but may take longer.
Why does the council protect office space in Hammersmith town centre?
Because the Local Plan names Hammersmith town centre as the council's preferred office location and seeks to stop it losing office uses. For a tenant, that means the stock of office suites here is meant to stay in office use, which supports refitting rather than converting.
Can an office in Hammersmith be converted to flats under permitted development?
Not simply. Hammersmith and Fulham says full planning permission has been needed for office to residential conversions since an Article 4 direction came into place on 28 April 2018. That is a question for the building owner and their planning adviser. For an office tenant, it means the space is expected to stay as offices.
Can an office fit-out in Hammersmith run in the evenings?
Quiet stages often can, if the landlord agrees. The council tries to keep noisy building work to 8am to 6pm on weekdays and 8am to 1pm on Saturdays, so drilling and cutting stay within those hours. Painting, ceiling tiles, second fix and cleaning suit evening shifts in a building where other tenants work by day.
What CDM duties does a business have on a small office fit-out?
A business commissioning building work is a commercial client under the CDM Regulations. You make sure the project has enough time and resources, and you pass on information you hold about the building, such as an asbestos survey. Where more than one contractor works on the project, you appoint a principal designer and a principal contractor in writing.
Who organises data cabling in a Hammersmith office fit-out?
Your IT supplier specifies it, and we coordinate the building side: containment routes, floor boxes, ceiling voids and power to the comms cabinet. The containment goes in before ceilings close, and the cabling follows on a date agreed with your supplier. That keeps the ceilings in the Hammersmith suite from being opened twice.
What does dilapidations work at the end of an office lease involve?
Returning the space to the condition the lease requires. That usually means removing tenant partitions, making good ceilings and floors, reinstating lighting layouts and redecorating. Your surveyor and the landlord's agree a schedule of dilapidations, and we price the works against it so the space can be handed back on time.
Every Service, One Team
More GS Renovation Services in Hammersmith
One team for every GS Renovation service in Hammersmith:
Same Service, Nearby Areas
Office Fit-Out Near Hammersmith
We carry out office fit-out across Hammersmith and the surrounding areas. Explore a nearby location:
Ready to Start Your Hammersmith Project?
Free, no-obligation quote for office fit-out in Hammersmith.