Open-Plan Conversions Hammersmith

Open-plan kitchen, diner and living conversions in Hammersmith, steel, floors, heating and finishes as one job.

GS Renovation creates open-plan living in Hammersmith, where 77% of homes are flats, so a knock-through is often inside a converted terrace or block. Abdelaaziz Saaid, our founder, has 30+ years on the tools and reads the lease before the wall, since a leaseholder rarely owns the structure.

In Hammersmith, a knock-through finished as one room typically costs £3,000 to £8,000 or more, including the steel beam (indicative London ranges, MyBuilder and Checkatrade, 2026). GS Renovation Ltd, a building contractor based in Potters Bar, does the work in Hammersmith: the structural engineer we appoint designs the steel, we install it, and building control signs it off.

Price guide

WorkIndicative London range
Open-plan conversion, steel beam and finishing£3,000 to £8,000+

Indicative London ranges (MyBuilder and Checkatrade, 2026), not a quotation. Prices checked September 2026. Full breakdown: Open-Plan Kitchen-Diner Ideas.

How the job runs

  1. Free site survey at your Hammersmith address, covering the walls, services and floor levels, and an itemised quote.
  2. The engineer we appoint sizes the beam, and the work is registered with Hammersmith and Fulham Council building control or an approved inspector. On a shared wall you serve the party wall notice as building owner; we supply the drawings.
  3. Props in, opening cut, beam on padstones; then floors, heating and electrics are joined up.
  4. Building control inspects the steel before it is covered. We finish the room, and the completion certificate follows.
An open-plan living and dining space completed by GS Renovation, lit by a roof lantern
The finished space after the structural opening was formed, with a lantern over the new floor area.

Opening up a Hammersmith terrace

In the W6 houses still in one ownership, a front reception, a middle room and a closet-wing kitchen are divided by walls that carry real load. Taking out the wall between the receptions and reworking the rear means steel sized by a structural engineer, and in a converted flat that steel may also carry the floor of the flat above. Broken-plan touches, like a Crittall divider, can keep some separation where you want it.

We install the beams the same disciplined way every time: prop the structure above, cut in stages, then lift the RSJs onto padstones and pack them tight before the props come out. Done well, the front bay light runs straight through to a bright kitchen-diner at the back. It is a change these W6 terraces take to naturally when the structure is handled properly.

Housing in Hammersmith

Hammersmith's housing, as the Council Tax list records it, is about 15,040 homes: 23% houses, 77% flats, with 56% pre-1919, 9% interwar and 34% built since 1945. Where most homes are flats, opening up a flat in Hammersmith changes the protected route from the bedrooms to the front door, so building control checks the escape before any wall comes out.

Opening up a listed or locally registered Hammersmith home

The statutory list includes almost 500 buildings in Hammersmith and Fulham, and changing one inside or out without Listed Building Consent is a criminal offence. For an open-plan scheme that matters more than for most work, because the historic room plan can be part of what the listing protects. The front and back parlours, the hall and the position of the stair may all carry significance. A proposal to open a listed house up is therefore designed with the consent in mind, keeping nibs, downstands or a wide opening that still reads as two rooms.

The borough also has a Local Register of Buildings of Merit, adopted in 2000, for buildings valued locally for their townscape, architecture or history. A house on that register is not listed, so an internal open-plan scheme there needs building regulations approval but not Listed Building Consent. The difference is worth confirming before design starts, because owners sometimes assume the stricter regime applies and hold back, or assume the lighter one applies and are wrong. We check which list, if any, covers the address at the first survey in Hammersmith.

Consents and sign-off in W6

If the new steel must sit in the wall your W6 home shares with the next house or flat, the Party Wall Act covers that cut. You serve the notices before work begins, which matters in these continuous terraced runs between the Thames and Brook Green where houses share their flank walls with those on either side.

The structural side is a Building Regulations matter, inspected and certified by Hammersmith and Fulham Council's building control rather than requiring planning permission for the internal works. We coordinate the engineer's design, the propping and beam installation, the inspections and the making good, so you get a genuinely open, well-lit space with all the paperwork in order and no loose ends.

  • Bi-fold and sliding door openings onto the garden
  • Openings formed in stages to keep the home usable
  • Heat loss and acoustic considerations before the wall comes out
Service areaHammersmith · W6
Local authorityHammersmith and Fulham Council
Part ofWest London (Inner London)
Typical homesVictorian terraces and riverside period homes, most of them now flats (77% of homes)
Housing stock56% built before 1919, 9% interwar, 34% post-war; 77% flats, 18% terraced, 5% semi-detached or detached
Also covered nearbyShepherd's Bush, Chiswick, Barnes, Holland Park and Acton

VOA Council Tax stock of properties, March 2025, for Hammersmith Broadway, Brook Green, Ravenscourt Park North and Ravenscourt Park South. Counts rounded by the VOA.

The GS Renovation Difference in Hammersmith

In a Hammersmith flat the order is freeholder consent, then survey, then steel, then certificate. We arrange the engineer's beam design, give you the drawings your party wall notice needs, install the steel and see building control through to sign-off, working tidily in your W6 home. That order is how our founder has worked through 30+ years on the tools.

30+ YearsFounder's experience
Fully Insured5 year guarantee
4.9 / 531 MyBuilder reviews
Building ControlCompliant
Free QuotesNo obligation
Reviews

Rated 4.9 / 5 by our clients

★★★★★ 4.9 average from 31 verified reviews on MyBuilder

★★★★★
George always kept to commitments and arrived on time. He offered helpful suggestions during his initial visit and promptly provided a reasonably…
scomtottIslington, London · via MyBuilder
★★★★★
It's the second time I have hired George and he has been absolutely professional and the work he did resembles perfectly what I had in mind. Being an…
ariabuffadesignerHornsey, London · via MyBuilder
★★★★★
Saaid is the best craftsman I have worked with. He knows what he is doing from the very beginning. He has a great knowledge of construction…
volkan50816Stoke Newington, London · via MyBuilder
Read all 31 reviews

FAQ

Frequently Asked Questions about Open-Plan Conversions Hammersmith

How much should a Hammersmith homeowner set aside for open-plan conversion?

The right sum to set aside for open-plan conversion in Hammersmith is fixed after the survey, not before it, and usually falls within £3,000 to £8,000 or more (indicative). Guessing usually means guessing wrong, and the W6 visit costs nothing. GS Renovation then gives an itemised total including building regulations approval of the steel and interlinked alarms. Call 07472 424 226 or email info@gsrenovationltd.co.uk.

Can I combine my two reception rooms and the kitchen into one open-plan space in Hammersmith?

Usually yes. In a typical W6 terrace it means removing the load-bearing walls between the receptions and towards the closet wing, with steel beams sized by an engineer to carry the loads. Because those walls tie into the party wall, the Party Wall Act applies, and building control signs off the finished structure. Flats need freeholder consent first.

Does opening up my Hammersmith flat need a fire strategy?

In most layouts, yes. When the living room and kitchen join, bedrooms can end up escaping through the space where a fire is most likely to start. Building control needs an agreed fire strategy, perhaps a protected lobby, sprinklers or a reworked plan, before work begins. As 77% of Hammersmith homes are flats, this is normally the first design question, with the freeholder's consent.

Can the cornicing be kept when a Hammersmith period room is opened up?

Largely, yes. The beam cuts across the line where the wall stood, so cornice there is lost, but the runs around the room can be protected and the missing sections re-run in plaster to match. A downstand beam can be given its own moulding so it reads as a deliberate division. Planning this before demolition saves original plaster that would otherwise be knocked off.

Should the fireplace stay when my Hammersmith rooms are opened up?

It often helps the room. A retained chimney breast gives the open space a focus and zones the seating area, and it avoids supporting a stack above. The beam then has to be designed around it, sometimes bearing on the breast itself if the engineer confirms it is sound. Removing it instead is a separate structural job with its own notices.

What is the order of work in a Hammersmith flat open-plan conversion?

Freeholder consent first, then the engineer's design and fire strategy, then Building Regulations approval. Props go in, the wall comes out, and the steel is set on padstones and inspected. Electrics and plumbing first fix follow while walls are open, then plastering and making good. Ordering the kitchen during the design stage keeps the programme moving.

Can an open-plan Hammersmith flat be finished before the completion inspection?

Almost finished, not fully. The completion inspection needs 5 days' notice, so it is requested while the last trades are still on site. The inspector checks the fire strategy as built, including detection, doors and the escape route, and that is easier before furniture and decoration hide things. Hammersmith and Fulham Council then issues the completion certificate, which you will need when you come to sell.

Does taking out a non-structural partition in a Hammersmith flat need building control?

It can, if the partition protects the escape route. A hallway wall that looks lightweight may be what keeps the route from the bedrooms to the front door separate from the kitchen. Removing it changes the fire strategy, which is building regulations work. The council's guidance keeps the Building Notice route for very small works, and a change to the escape route is better handled with drawings.

What should a Hammersmith owner do while a Full Plans decision is pending?

Get everything ready that does not depend on it. Hammersmith and Fulham Council aims to give a decision on a Full Plans application within 5 weeks, though it may take longer. That time suits the freeholder's licence, ordering the kitchen, booking the steel fabricator for a provisional date and warning the neighbours. The wall stays up until the approval arrives.

Ready to Start Your Hammersmith Project?

Free, no-obligation quote for open-plan conversion in Hammersmith.

We use these details only to respond to your enquiry. See our privacy policy.

Free, no-obligation quote. We reply within 24 hours. Or call 07472 424 226.

Call 07472 424 226Free quote