Kitchen Extensions Hillingdon
Rear, side return and wraparound kitchen extensions in Hillingdon, the room, the services and the kitchen built as one job.
- Rated 4.9 from 31 reviews on MyBuilder
- London guide: £45,000 to £97,500
- Free site survey, itemised quote
In Hillingdon, 25% of homes are terraced houses and 36% are semi-detached or detached, and a house has the permitted development rights a flat lacks. The borough sets its own limits: Policy DMHD 1 says a single storey rear extension on a terrace or semi should not exceed 3.3 metres deep on a plot of 5 metres or less, and 3.6 metres on a wider plot. A borough-wide Article 4 Direction on large rear extensions has also been in force since 22 September 2014. We build the shell, the steel and the kitchen as one programme.
In Hillingdon, a rear kitchen extension of about 30 square metres typically costs £45,000 to £97,500 excluding VAT, or £60,000 to £100,000 for a side return (indicative London ranges, Resi, MyBuilder and Checkatrade, 2026). GS Renovation Ltd, a building contractor based in Potters Bar, does the work in Hillingdon: the structural engineer we appoint designs the foundations and steel, we build the room and fit the kitchen, and a registered electrician certifies the electrics.
Price guide
| Work | Indicative London range |
|---|---|
| Rear kitchen extension, about 30 square metres, ex VAT | £45,000 to £97,500 |
| Side return kitchen extension, standard to high specification | £60,000 to £100,000 |
| Wraparound kitchen extension, standard to high specification | £80,000 to £130,000 |
| Side return build rate, per square metre of new floor | £2,400 to £3,200 |
| Kitchen supplied and fitted within the extension | £5,000 to £14,000 |
| Structural engineer's fee | £950 to £2,500 |
Indicative London ranges (Resi, MyBuilder and Checkatrade, 2026), not a quotation. Prices checked September 2026. Full breakdown: Extension Cost and Planning Guide.
Quick estimate for Hillingdon
Hillingdon range: choose above

How deep a Hillingdon kitchen extension can go at the back
The depth is set by plot width and house type before anything else. Hillingdon Policy DMHD 1 says a single storey rear extension on a terraced or semi-detached house should not exceed 3.3 metres deep where the plot is 5 metres wide or less, or 3.6 metres on a wider plot. For a detached house the figure is 4.0 metres. Measure your plot at the rear wall before a designer draws anything, because a few centimetres either side of 5 metres changes the depth your kitchen can have, and so where the island, the table and the glazing can sit.
National permitted development allows a single storey rear extension of three metres beyond the original rear wall of a semi or terrace, and four metres for a detached house. In Hillingdon an Article 4 Direction removes permitted development for extensions that go more than 4 metres beyond the original rear wall, so the larger home extension route, which needs prior approval, stops at 4 metres here for a semi or terrace. Within three metres no application is needed, though a lawful development certificate confirms it. Between three and 4 metres the prior approval comes first, and anything larger needs a householder application. Either way the drawings we build from should show the original rear wall clearly, because that line is where every measurement starts.
Housing in Hillingdon
On the valuation list Hillingdon counts about 118,240 homes, 34% flats and 66% houses; 4% predate 1919, 37% are interwar and 59% post-war. A semi in Hillingdon can take its kitchen extension across the back and round into the side passage, which leaves room for a utility behind the kitchen, and 27% of homes here are semi-detached.
Side returns, wraparounds and height limits in Hillingdon
A side extension in Hillingdon should not exceed half the width of the original property under Policy DMHD 1, which matters on interwar semis where the side passage is the only route to the garden. 37% of the borough's homes were built between 1919 and 1939, and on an interwar semi a wraparound kitchen combines a rear addition with a narrow side infill. The side part often takes the kitchen run, with dining in the rear section, so the half-width limit decides whether a full-height larder wall fits or whether the run turns into the rear.
Height is the second limit. Hillingdon says a flat roofed single storey extension should not exceed 3.0 metres high, or 3.4 metres with a pitched or sloping roof, measured from ground level. On a sloping garden that measurement point changes the finished floor level you can have inside, so we set out levels on site before the slab is poured and check them against the drawn heights. A pitched roof gives a little more headroom for roof windows, while a flat roof with a lantern keeps the eaves low against the neighbour's boundary.
Conservation areas and parapets on Hillingdon kitchen extensions
Hillingdon has 31 designated conservation areas, and inside them the design rules tighten. Under permitted development rules all side extensions on designated land, such as a conservation area, need householder planning permission, so a side return in Ruislip Village or Hayes Village is always an application. Hillingdon's Ruislip Village Conservation Area leaflet adds that side extensions should normally be set back from the original building line, which trims a little floor area off the side section and moves the wall your worktop runs against.
Where the extension has a flat roof, Hillingdon expects a parapet in conservation areas and Areas of Special Local Character. A parapet changes the build: the wall rises above the roof deck, the roof falls to a hidden gutter or outlet, and the membrane detail at the upstand has to be right first time. It also changes how roof lights sit, since a low-profile unit can disappear behind the parapet line. We price that detail from the drawings rather than treating it as a standard flat roof, so the programme holds.
Drainage, steel and the fit-out in one Hillingdon programme
Opening the back of a Hillingdon house into the new kitchen usually means a steel beam across the old rear wall, and that steel needs structural calculations. A Hillingdon full plans application needs detailed plans and structural calculations, and you will normally receive a formal decision within 5 weeks. The structural engineer we appoint sizes the beam and padstones, and we order the steel once the calculations are approved, so the opening, the kitchen layout and the inspections line up. Where the new foundations or steel bearings come close to a neighbour, you serve the Party Wall Act notices. For a council-owned house next door they go to the Mayor and Burgesses of The London Borough of Hillingdon.
Drainage is the other early job. A kitchen that moves to the back of the extension takes its sink and dishwasher waste further from the existing stack, and any manhole or run under the new floor has to be found, surveyed and diverted or protected before the slab. Building over or near a public sewer needs the sewerage company's agreement. We sequence the fit-out behind that: first fix plumbing and wiring in the new walls, plastering, then units, worktop templating and appliances, with a registered electrician certifying the new circuits. Keeping the builder and the kitchen fitter as one team avoids the gap where the shell is finished and nobody owns the snagging.
- Airbrick ducts to keep existing timber floors ventilated
- Steel beams and goalpost frames into the existing house
- Wet underfloor heating laid in the new screed
VOA Council Tax stock of properties, March 2025, for all 32 statistical areas in Hillingdon. Counts rounded by the VOA.
Why Choose GS Renovation in Hillingdon
You would use GS Renovation for a Hillingdon kitchen extension because one team runs it from the first dig to the last worktop. Abdelaaziz Saaid, the founder, has spent his working life on hands-on building work, and he sees the job through the structural steel, the roof detail and the kitchen fit-out. We build to the consent and the approved drawings you or your designer obtain, give you a written programme before work starts, and coordinate the structural engineer we appoint, the building control inspections and the trades that follow the shell.
- Cooker extract taken outside through the new roof or flank wall, not recirculated
- Building control and Part P certificates handed over together at the end
- Fully insured, with cover in place on every site
The kitchen has been fitted to the high standard. Saaid was polite, professional, tidy, he pays attention to a little details that make huge…
It's the second time I have hired George and he has been absolutely professional and the work he did resembles perfectly what I had in mind. Being an…
Saiid did a complete refurbishment of our small bathroom. This involved ripping out the existing bath/shower, basin, toilet, pipework, and tiles and…
FAQ
Frequently Asked Questions about Kitchen Extensions Hillingdon
Do you charge for a survey before quoting kitchen extensions in Hillingdon?
A kitchen extensions survey in Hillingdon costs nothing, and it is part of quoting rather than a service to bill for. GS Renovation allows enough time at UB8 to check the post-war suburban details that move a figure within £45,000 to £97,500 excluding VAT for a rear kitchen extension of about 30 square metres (indicative), and to plan the order: the boiler flue, soil pipe and gully on the rear wall are moved before the new walls enclose them. Nothing is owed if you go elsewhere in Hillingdon.
How deep can a kitchen extension be on a Hillingdon semi?
On a semi or terrace, Hillingdon Policy DMHD 1 says a single storey rear extension should not exceed 3.3 metres deep where the plot is 5 metres wide or less, and 3.6 metres where it is wider. A detached house can go to 4.0 metres. Those figures apply to a planning application. Under permitted development a semi can go three metres, or up to 4 metres with prior approval, because the borough's Article 4 Direction removes the right beyond that.
Does the Hillingdon Article 4 Direction affect a kitchen extension?
Yes, if the extension goes more than 4 metres beyond the original rear wall. Hillingdon's large rear extensions Article 4 Direction applies to the whole borough and has been in force since 22 September 2014, and it removes permitted development rights for rear extensions deeper than that. A scheme beyond that depth can still go through a householder planning application, because the direction removes the automatic right, not the chance of consent.
Can a ground floor flat in Hillingdon have a kitchen extension?
You can, but only with planning permission, because householder permitted development rules for extensions apply to houses only and not to flats and maisonettes. With 34% of Hillingdon homes being flats, that rule reaches a large part of the borough. You will normally also need the freeholder's consent under the lease, and the extension may sit under a flat above, which affects the roof and fire detailing.
What height can a single storey kitchen extension be in Hillingdon?
Hillingdon limits a flat roofed single storey extension to 3.0 metres high and a pitched or sloping roof to 3.4 metres, both measured from ground level. The internal ceiling height comes out lower once the roof structure, insulation and finished floor are allowed for. We check the drawn levels against the ground on site before the foundations go in, because a sloping garden can eat into that allowance.
Does a side return extension in a conservation area need planning permission?
Yes. Under permitted development rules every side extension on Article 2(3) designated land, which includes a conservation area, needs householder planning permission. Hillingdon has 31 designated conservation areas, so check whether your street falls in one before a designer starts. Hillingdon also says applications in conservation areas should be supported by a heritage statement, which your designer prepares with the drawings.
Can a Hillingdon kitchen extension go through building control on a building notice?
It can, but Hillingdon Council does not issue plans approval on a building notice and strongly recommends against the route unless your builder has the ability to complete the works. For a kitchen extension with a steel beam, a full plans application gives you approved drawings and calculations before work starts. Within 5 days of completion a Notice of Completion goes in, and the council then issues a free completion certificate.
How long does a kitchen extension take from start to finished kitchen?
The build and the kitchen run as one sequence: foundations and drainage, walls and steel, roof and glazing, then first fix, plaster, units and worktops. The length follows the size, the ground conditions and the lead time on glazing and worktops. We give you a written programme after the site visit, with the points where building control inspects and where the kitchen supplier's deliveries land.
Are roof lights or a lantern better on a Hillingdon kitchen extension?
Roof glazing is the most direct way to get daylight into the middle of a deep kitchen, and the choice follows the roof. A flat roof takes a lantern or flat roof lights, while a pitched roof takes inline roof windows. In a Hillingdon conservation area or Area of Special Local Character, a flat roof is expected to carry a parapet, so the glazing has to sit clear of it.
Every Service, One Team
More GS Renovation Services in Hillingdon
One team for every GS Renovation service in Hillingdon:
Same Service, Nearby Areas
Kitchen Extensions Near Hillingdon
We carry out kitchen extensions across Hillingdon and the surrounding areas. Explore a nearby location:
Ready to Start Your Hillingdon Project?
Free, no-obligation quote for kitchen extensions in Hillingdon.