HMO Conversions Westminster

House to HMO conversions and licence upgrades in Westminster, fire doors, detection and shared amenities built to the council's licence standards.

HMO conversion in Westminster is shaped more by licensing than by the stock. The whole City sits under a renewed Additional HMO Licensing Scheme that took effect on 31 August 2026. Under it, a shared house or flat where three or more people from two or more households share a kitchen or bathroom needs a licence. With 91% of homes being flats, the building can be a flat share or an older converted building as well as a whole house.

In Westminster, a light HMO conversion for four to six tenants typically costs £40,000 to £75,000 in construction, or £90,000 to £150,000 with an en-suite to every bedroom (indicative London ranges, Mayfair Studio and LetCompliance, 2026). GS Renovation Ltd, a building contractor based in Potters Bar, does the work in Westminster: we build the fire doors, detection, bathrooms and kitchens to the council's HMO standards, the landlord applies for the licence, and a registered electrician certifies the electrics.

Price guide

WorkIndicative range
Light HMO conversion, London, 4 to 6 tenants, construction only (Mayfair Studio)£40,000 to £75,000
Full HMO conversion with en-suites, London, 5 to 6 beds (Mayfair Studio)£90,000 to £150,000
5-bed HMO conversion, London and South East (LetCompliance)£35,000 to £60,000
Fire safety works, typical 5-bed HMO, UK guide (LetCompliance)£5,000 to £9,500
En-suite added to one bedroom, London (Mayfair Studio)£3,500 to £8,000 per room
Second shared bathroom, UK guide (LetCompliance)£4,000 to £9,000

Indicative ranges from published cost guides (Mayfair Studio and LetCompliance, 2026), not a quotation. Each row names its source and whether it is a London, UK or England-wide figure. Prices checked September 2026.

Quick estimate from published guides

Guide range: choose above

A tiled bathroom by GS Renovation with a bath, a glass bath screen and a wall-hung WC
A full bathroom with a wall-hung WC. The council's amenity standard sets how many of these an HMO needs for the people living in it.

Use classes and planning for a Westminster HMO

The planning question in Westminster turns on how many people will share. The London Plan glossary puts HMOs for three to six people in Use Class C4 and larger ones in sui generis, which always needs planning permission. Class L of the General Permitted Development Order makes a change from a single C3 home to a C4 HMO permitted development. It does not allow one former house to be used as two or more separate C4 HMOs.

Class L can be removed locally, and the London Plan asks boroughs weighing such directions between C3 and C4 to consider the strategic as well as local importance of HMOs. The owner or their planning agent should confirm the position for the address before the layout is drawn. The London Plan also says HMOs of a reasonable standard should generally be protected, which matters when an existing Westminster HMO is upgraded rather than returned to a family home.

Housing in Westminster

Take the 132,230 or so homes the valuation list gives Westminster: 91% flats, 9% houses, 48% from before 1919, 10% interwar and 40% post-war.

Mandatory and additional HMO licensing across Westminster

A licence is needed before a Westminster HMO is let, and the landlord applies for it. GOV.UK defines a large HMO as one rented to 5 or more people who form more than 1 household, which needs a mandatory licence. Westminster first brought in borough-wide additional licensing on 30 August 2021. The renewed scheme was designated on 21 April 2026, took effect on 31 August 2026 and runs until 30 August 2031.

Mandatory licensing does not reach a flat in a purpose-built block of three or more self-contained flats; where such a flat is shared, it is the council's additional scheme, if any, that applies.

Additional licensing reaches flat shares, bedsits and some converted flats that fall outside the mandatory scheme. Westminster also says a building converted into flats that are not all fully self contained may need a mandatory or additional licence even with no shared facilities. That catches older conversions, so a survey of the separation between units comes before any quote. GOV.UK warns that renting out an unlicensed HMO can lead to an unlimited fine, so the build finishes before the first tenancy.

Room sizes, kitchens and sharing under Westminster HMO standards

Westminster's HMO standards turn into dimensions on the drawing. The council has produced four sets of standards for different types of shared property, updated in April 2021, and may attach works conditions to a licence to achieve them. For a shared house or flat, a kitchen must be at least 5.5 square metres and arranged for safe access and use. No more than two people may sleep in one bedroom, and a child counts as a person.

Bedrooms must also meet the national minimum sizes that apply as licence conditions: 6.51 square metres for one person over 10, 10.22 for two, and no sleeping room under 4.64 square metres. Where statutory bedroom sizes are breached, Westminster says it has a legal duty to act but allows an 18-month period to put it right. The sizes are measured on usable floor area: floor under 1.5 metres of ceiling height and fixed boxing do not count, though a door swing does. The 18 months is a correction period, not a design allowance, so we set out partitions to the sizes on the approved plan and check them before plastering. Bathrooms and WCs are sized to the occupancy the licence will name.

Fire safety, sound and energy in a Westminster HMO

Fire safety is the core of an HMO build in Westminster. Bedroom doors become fire doors with self closers, the escape stair is protected, and linked fire detection and alarms go in to the grade set for the building, following Part B and the LACORS housing fire safety guidance. For buildings of self-contained flats that count as HMOs, Westminster's standard treats 60 minutes as the benchmark but accepts 30 minutes with appropriate automatic fire detection in most existing conversions.

Sound between lettings matters more than in a family house, because each room is a separate household with its own hours. Stud partitions are filled with mineral wool and floors between bedrooms get a resilient layer. Energy rules apply too: since 1 April 2020 a landlord cannot let, or continue to let, a home with an EPC rating below E unless a valid exemption is registered. The government has set 1 October 2030 for private lets to reach EPC C, subject to regulations, so insulation and heating controls belong in the scope while floors and walls are open.

  • Electrics extended to every bedroom, certified by a registered electrician
  • Hot water sized for several sharers showering at once, with any gas work by a Gas Safe registered engineer
  • Emergency lighting on the escape route where the house needs it
Service areaWestminster · W1, SW1, W2, WC2, NW1, NW8, W9 and W10
Local authorityWestminster City Council
Part ofCentral London (Inner London)
Typical homesGrand stucco terraces, period mansion blocks and prestigious townhouses, most of them now flats (91% of homes)
Housing stock48% built before 1919, 10% interwar, 40% post-war; 91% flats, 8% terraced, 1% semi-detached or detached
Also covered nearbyKensington and Chelsea, Camden, Lambeth, Wandsworth and Brent

VOA Council Tax stock of properties, March 2025, for all 24 statistical areas in Westminster. Counts rounded by the VOA.

Why Choose GS Renovation in Westminster

An HMO has to pass a licence inspection as well as building control, so we build to both from the first drawing. We set out rooms to the approved sizes and check them before plastering, install fire doors, detection and protected escape routes in the order inspectors want to see them, and coordinate the registered electrician and a registered gas engineer. The landlord applies for the licence; we hand over the certificates and a record of the fire safety work to support it.

  • Building control applications and inspections coordinated for you
  • Sound lining between bedrooms so one sharer does not keep another awake
  • Detection laid out to the grade the council's HMO fire guidance sets
30+ YearsFounder's experience
Fully Insured5 year guarantee
4.9 / 531 MyBuilder reviews
Building ControlCompliant
Free QuotesNo obligation
Reviews

Rated 4.9 / 5 by our clients

★★★★★ 4.9 average from 31 verified reviews on MyBuilder

★★★★★
George always kept to commitments and arrived on time. He offered helpful suggestions during his initial visit and promptly provided a reasonably…
scomtottIslington, London · via MyBuilder
★★★★★
Saaid is the best craftsman I have worked with. He knows what he is doing from the very beginning. He has a great knowledge of construction…
volkan50816Stoke Newington, London · via MyBuilder
★★★★★
It's the second time I have hired George and he has been absolutely professional and the work he did resembles perfectly what I had in mind. Being an…
ariabuffadesignerHornsey, London · via MyBuilder
Read all 31 reviews

FAQ

Frequently Asked Questions about HMO Conversions Westminster

What should a landlord budget for an HMO conversion in Westminster?

Start from £40,000 to £75,000 in construction for a light conversion (Mayfair Studio, 2026), or £90,000 to £150,000 with en-suites throughout. Then add planning where an Article 4 direction applies, the licence fee and the fire risk assessment. A Westminster quote follows a survey against the council's HMO standards, with fire works, bathrooms and kitchens as separate lines.

Which shared homes in Westminster fall under additional licensing?

Flat shares, bedsits and some converted flats that fall outside mandatory licensing. The test is three or more occupiers from two or more households sharing a kitchen, bathroom or similar basic amenity, anywhere in the City. The owner applies for the licence, and we build to the standards it will be checked against.

How long does Westminster's renewed additional licensing scheme run?

Until 30 August 2031. Westminster designated the renewal on 21 April 2026 and it took effect on 31 August 2026, following the first borough-wide scheme of 30 August 2021. A house or flat to be let as shared rooms should be built to its standards from the first drawing.

Can a Westminster converted building count as an HMO when every flat is self-contained?

It can. Westminster's standards class such a building as an HMO where the conversion does not fully meet the 1991 Building Regulations and fewer than two thirds of the flats are held by long leaseholders. Upgrading the fire and sound separation is then the likely scope, and the owner checks the licensing position with the council.

How big must a shared kitchen be in a Westminster HMO?

At least 5.5 square metres under Westminster's shared house and flat standard, and arranged to allow safe access and use. The number of cookers, sinks and worktop lengths then rises with the number of occupiers, so the kitchen is sized to the occupancy the licence will name rather than to the room available.

How many people can share a bedroom in a Westminster HMO?

No more than two, and a child counts as a person. That comes from Westminster's shared house and flat standard, and the bedroom must also meet the national minimum size: 6.51 square metres for one person over 10 and 10.22 for two. We set out the partitions to the approved sizes before the rooms are plastered.

Does turning a house into a shared house for six need planning permission?

Not always. A change from a single home to a C4 HMO for three to six people is permitted development under Class L, unless a local direction removes it. Seven or more people makes the HMO sui generis, which always needs planning permission. The owner or their agent confirms the position before the layout is fixed.

What happens if a Westminster HMO bedroom is found to be too small?

Westminster says it has a legal duty to act where statutory HMO bedroom sizes are breached, but allows an 18-month period for this to be corrected. Correcting a room after letting means moving walls around tenants, so it is far simpler to plan every bedroom to the minimum size at the design stage.

What fire resistance is accepted in an older converted building licensed as an HMO?

Westminster's self-contained flat HMO standard names 60 minutes as the building regulations benchmark, but accepts 30 minutes with appropriate automatic fire detection in most existing conversion flat buildings. New work is still built to what Part B and building control require, with detection linked across the flats.

Ready to Start Your Westminster Project?

Free, no-obligation quote for hmo conversions in Westminster.

We use these details only to respond to your enquiry. See our privacy policy.

Free, no-obligation quote. We reply within 24 hours. Or call 07472 424 226.

Call 07472 424 226Free quote