HMO Conversions Southall
House to HMO conversions and licence upgrades in Southall, fire doors, detection and shared amenities built to the council's licence standards.
- Rated 4.9 from 31 reviews on MyBuilder
- London guide: £40,000 to £75,000
- Free site survey, itemised quote
An HMO conversion in Southall now starts with a planning application. Ealing's immediate Article 4 direction removed the right to turn a dwelling into a small HMO from 30 October 2024, and a non-immediate direction followed on 14 November 2025. It covers the borough apart from Perivale ward and the Old Oak and Park Royal Development Corporation area. After planning comes licensing, and Ealing's standards for shared houses then fix bedroom sizes, kitchens, bathrooms and fire safety. We build the shared house to the approved plans and the licence conditions, for landlords converting a family house or upgrading an existing HMO.
In Southall, a light HMO conversion for four to six tenants typically costs £40,000 to £75,000 in construction, or £90,000 to £150,000 with an en-suite to every bedroom (indicative London ranges, Mayfair Studio and LetCompliance, 2026). GS Renovation Ltd, a building contractor based in Potters Bar, does the work in Southall: we build the fire doors, detection, bathrooms and kitchens to the council's HMO standards, the landlord applies for the licence, and a registered electrician certifies the electrics.
Price guide
| Work | Indicative range |
|---|---|
| Light HMO conversion, London, 4 to 6 tenants, construction only (Mayfair Studio) | £40,000 to £75,000 |
| Full HMO conversion with en-suites, London, 5 to 6 beds (Mayfair Studio) | £90,000 to £150,000 |
| 5-bed HMO conversion, London and South East (LetCompliance) | £35,000 to £60,000 |
| Fire safety works, typical 5-bed HMO, UK guide (LetCompliance) | £5,000 to £9,500 |
| En-suite added to one bedroom, London (Mayfair Studio) | £3,500 to £8,000 per room |
| Second shared bathroom, UK guide (LetCompliance) | £4,000 to £9,000 |
Indicative ranges from published cost guides (Mayfair Studio and LetCompliance, 2026), not a quotation. Each row names its source and whether it is a London, UK or England-wide figure. Prices checked September 2026.
Quick estimate from published guides
Guide range: choose above

Planning permission for a Southall HMO under Article 4
A Southall house can no longer become a small HMO under permitted development. Class L of the General Permitted Development Order allows a change from a C3 dwellinghouse to a C4 HMO, but Ealing's Article 4 directions take that right away. The non-immediate direction covers the whole borough apart from Perivale ward and the Old Oak and Park Royal Development Corporation area, so Southall is inside it. An HMO for more than six people is sui generis and needs planning permission in any case.
Ealing's HMO planning guidance is aimed at converting a C3 dwelling to a small C4 HMO of 3 to 6 occupants, and applications are assessed against the London Plan 2021, including Policy H9, and Ealing's Development Management DPD 2013. A Management Plan goes in with the drawings. Likely conditions fix the approved plans and room sizes and prevent later subdivision, so the Southall house cannot quietly gain a bedroom after the licence. We build exactly what was approved.
Housing in Southall
Count the homes in Southall and you get about 14,510: 23% built since 1945, 47% between the wars and 30% before 1919, with flats at 36% and houses at 64%.
Which licence a Southall HMO needs
While the current designation lasts, a Southall HMO of three or more people from more than one household needs one of Ealing's licences. Mandatory HMO licensing applies where five or more people not living as a single household share facilities. Below that, Ealing's additional HMO licensing scheme has covered HMOs let to 3 or 4 unrelated individuals since 1 April 2022, across the whole borough, and the designation ceases on 31 March 2027 unless revoked earlier. Ealing ran a consultation on additional HMO licensing from 15 July 2026 to 24 September 2026.
GOV.UK warns that renting out an unlicensed HMO can lead to an unlimited fine, so the licence and the build run together. Ealing property licences generally last 5 years where there has been no previous enforcement. The landlord or their agent applies for the licence. We build to the standards it sets and hand over the fire alarm, emergency lighting, electrical and gas certificates that the installers issue, so the Southall house is ready when the licensing officer inspects.
Room sizes, kitchens and bathrooms in a Southall HMO
Ealing's standards set the layout of a Southall HMO before any wall moves. The national mandatory licence conditions govern bedroom size: at least 6.51 square metres for one adult, 10.22 for two, and no sleeping room under 4.64 square metres. Ealing adds its own rule that a room under 6.5m2 is never slept in, a bedroom holds two people at most, and no bedroom may be reached through a shared kitchen. Floor area under a ceiling below 1.5m does not count towards occupant numbers, which catches bedrooms in a rear roof slope. For planning, Ealing expects bedrooms to meet the Nationally Described Space Standard and London Plan housing design guidance.
The mandatory scheme stops short of flats in purpose-built blocks of three or more self-contained flats, which only an additional licensing scheme can catch.
Shared space is fixed too. Ealing requires 1 kitchen and 1 bathroom per 5 occupiers, and its HMO planning guidance asks for a combined living, dining and kitchen area of at least 25 sqm for 3 people, rising to 31 sqm for 6. On an interwar Southall terrace that often keeps the front reception as shared space and puts a second shower room upstairs. We price the plumbing and drainage for those extra wet rooms before the layout is fixed.
Fire safety, sound and energy in a Southall shared house
Fire safety is the core of an HMO conversion in Southall. The escape route through the hall and stair is protected, bedroom doors become self-closing fire doors, and a mains-powered interlinked detection and alarm system covers the rooms and circulation. The layout follows building regulations Part B, Ealing's HMO fire standards and the LACORS housing fire safety guidance, which licensing officers use as the recognised guide. Kitchens get a heat detector and a fire blanket. The common parts fall under the Fire Safety Order, so the work needs full plans rather than a building notice.
Sound and energy come next. Sound insulation between bedrooms and between floors cuts disputes between tenants who keep different hours, so we add insulated stud walls and upgrade ceilings where the budget allows. Since 1 April 2020 a landlord cannot let a property covered by the MEES Regulations with an EPC rating below E without a valid exemption. A Southall HMO conversion is the time to insulate the roof, upgrade the boiler and fit room-by-room heating controls.
- Service holes sealed so each bedroom and the kitchen stay separate fire compartments
- Snagging before the council's licence inspection
- Hard-wearing floors, finishes and decoration for a let house
VOA Council Tax stock of properties, March 2025, for all 5 statistical areas in Southall. Counts rounded by the VOA.
The GS Renovation Difference in Southall
An HMO conversion has three sets of rules working on the same house: the planning approval, the licence conditions and the building regulations. We build from one set of drawings that satisfies all three, so the room sizes planning fixed are the ones built and the fire doors and alarms are the ones the licensing officer checks. You get a written programme, a certificate file for the licence application your agent submits, and one team from strip-out to handover. As a landlord converting to let, you are a commercial client under the CDM Regulations, with duties of your own.
- Fire doors, closers and seals fitted to every door on the escape route
- Aftercare and snagging support once the job is finished
- Detection laid out to the grade the council's HMO fire guidance sets
The kitchen has been fitted to the high standard. Saaid was polite, professional, tidy, he pays attention to a little details that make huge…
Saiid did a complete refurbishment of our small bathroom. This involved ripping out the existing bath/shower, basin, toilet, pipework, and tiles and…
George always kept to commitments and arrived on time. He offered helpful suggestions during his initial visit and promptly provided a reasonably…
FAQ
Frequently Asked Questions about HMO Conversions Southall
What should a landlord budget for an HMO conversion in Southall?
Start from £40,000 to £75,000 in construction for a light conversion (Mayfair Studio, 2026), or £90,000 to £150,000 with en-suites throughout. Then add planning where an Article 4 direction applies, the licence fee and the fire risk assessment. A Southall quote follows a survey against the council's HMO standards, with fire works, bathrooms and kitchens as separate lines.
Do you need planning permission for an HMO in Southall?
Yes. Ealing's non-immediate Article 4 direction, in force since 14 November 2025, removes the permitted change from a house to a small HMO across the borough except Perivale ward and the Old Oak and Park Royal Development Corporation area. Southall is inside it, so the change needs an application with a Management Plan.
What is the smallest bedroom allowed in a Southall HMO?
The national mandatory licence conditions set 6.51 square metres for one adult and 10.22 for two, and no room under 4.64 square metres may be slept in. Ealing adds that floor area under a ceiling lower than 1.5m is not counted. For a planning application Ealing expects bedrooms to meet the Nationally Described Space Standard, so design to that rather than the licensing minimum.
Does a three-person shared house in Southall need a licence?
Yes, if the three are not one household, under Ealing's additional HMO licensing scheme, which covers HMOs let to 3 or 4 unrelated individuals across the whole borough from 1 April 2022. The designation ends on 31 March 2027 unless revoked earlier, and Ealing consulted on additional HMO licensing from 15 July 2026 to 24 September 2026, so check the position before letting.
When does a Southall HMO need a mandatory licence?
When five or more people who do not live as a single household share facilities, Ealing applies mandatory HMO licensing. GOV.UK defines a large HMO in the same way, as one rented to 5 or more people forming more than 1 household. The landlord applies, and the licence conditions then set the standards we build to.
How many kitchens and bathrooms does a Southall HMO need?
Ealing requires 1 kitchen and 1 bathroom per 5 occupiers, so a six-person house needs a second of each. Its HMO planning guidance also sets a shared living, dining and kitchen area of at least 25 sqm for 3 people, rising to 31 sqm for 6. Fix the room schedule before drainage is designed.
Can a Southall HMO house seven or more tenants?
Only with planning permission for a large HMO. The London Plan glossary defines HMOs for three to six people as Use Class C4 and those for more than six as sui generis, which always needs an application. Ealing's bedroom, kitchen and bathroom standards then limit how many people the house can hold.
What fire safety work does an HMO conversion need?
A protected escape route, self-closing fire doors to bedrooms and kitchen, and an interlinked mains-powered detection and alarm system, with emergency lighting where the route needs it. The standard follows building regulations Part B, the council's HMO fire standards and the LACORS housing fire safety guidance. We fit the items to that specification, and the alarm installer and a registered electrician certify them.
Can a Southall HMO later be split into more rooms?
Not without a new approval. Ealing's likely HMO conditions include approved plans that fix room sizes and prevent later subdivision, and Class L never allowed one house to become two or more separate C4 HMOs. Any extra bedroom means a new planning application and a licence variation.
Every Service, One Team
More GS Renovation Services in Southall
One team for every GS Renovation service in Southall:
Same Service, Nearby Areas
HMO Conversions Near Southall
We carry out hmo conversions across Southall and the surrounding areas. Explore a nearby location:
Ready to Start Your Southall Project?
Free, no-obligation quote for hmo conversions in Southall.