HMO Conversions Borough

House to HMO conversions and licence upgrades in Borough, fire doors, detection and shared amenities built to the council's licence standards.

HMO conversion in Borough is a narrow service, because the VOA's count for the wider Borough & Southwark Street and Southwark St George's area has only 6% of homes as houses, all terraced, and the rest as flats. What comes up is a terrace let as a shared house, a flat let to sharers, or an existing HMO upgraded to meet licence conditions. Southwark runs additional HMO licensing across the whole borough and sets its own HMO Standards for rooms, kitchens and bathrooms. The landlord applies for the licence; we build to the standard it assumes.

In Borough, a light HMO conversion for four to six tenants typically costs £40,000 to £75,000 in construction, or £90,000 to £150,000 with an en-suite to every bedroom (indicative London ranges, Mayfair Studio and LetCompliance, 2026). GS Renovation Ltd, a building contractor based in Potters Bar, does the work in Borough: we build the fire doors, detection, bathrooms and kitchens to the council's HMO standards, the landlord applies for the licence, and a registered electrician certifies the electrics.

Price guide

WorkIndicative range
Light HMO conversion, London, 4 to 6 tenants, construction only (Mayfair Studio)£40,000 to £75,000
Full HMO conversion with en-suites, London, 5 to 6 beds (Mayfair Studio)£90,000 to £150,000
5-bed HMO conversion, London and South East (LetCompliance)£35,000 to £60,000
Fire safety works, typical 5-bed HMO, UK guide (LetCompliance)£5,000 to £9,500
En-suite added to one bedroom, London (Mayfair Studio)£3,500 to £8,000 per room
Second shared bathroom, UK guide (LetCompliance)£4,000 to £9,000

Indicative ranges from published cost guides (Mayfair Studio and LetCompliance, 2026), not a quotation. Each row names its source and whether it is a London, UK or England-wide figure. Prices checked September 2026.

Quick estimate from published guides

Guide range: choose above

A tiled bathroom by GS Renovation with a bath, a glass bath screen and a wall-hung WC
A full bathroom with a wall-hung WC. The council's amenity standard sets how many of these an HMO needs for the people living in it.

Planning for a Borough HMO: Class L, Article 4 and seven sharers

Changing a Borough house from a family home to a small shared house is normally permitted development. Class L of the national order allows a change from Class C3 dwellinghouses to Class C4 houses in multiple occupation, and the London Plan defines C4 as an HMO for three to six people. Class L does not allow one house to become two or more separate HMOs. Southwark says planning permission is needed for an HMO let to 7 or more people, which is sui generis, or for any HMO in an Article 4 direction area.

The two HMO Article 4 directions in our research are for Henshaw Street, SE17, and Bywater Place, Surrey Docks, SE16. Borough is in SE1, so neither is on its streets, but that does not prove no direction covers your address, so ask Southwark's planning department before buying. If a Borough scheme does need permission, Policy P9 of the Southwark Plan 2022 brings further tests: shared living space inside and out, somewhere to store bins and recycling, a bike space for each resident, and no overconcentration of HMOs nearby.

Housing in Borough

Take the 12,140 or so homes the valuation list gives Borough: 94% flats, 6% houses, 18% from before 1919, 3% interwar and 73% post-war.

Which licence a Borough shared house needs

While Southwark's additional scheme runs, a shared house in Borough needs a licence of one kind or another. The national mandatory licence catches the large HMO, meaning 5 or more tenants who make up more than 1 household, though not a flat in a purpose-built block of three or more flats. Below that size, the borough's own designation fills the gap. Southwark made it on 28 October 2021, it took effect on 1 March 2022, and its reach is the whole borough. It captures shared houses with no more than 4 tenants sharing a kitchen or bathroom.

Its expiry date is 1 March 2027, earlier if the council revokes it, so confirm whether a renewal is in place before planning around those dates. The designation also reaches section 257 HMOs, a converted block of at least 3 storeys holding 3 or more self-contained flats with one owner or controller, where the old conversion falls short of current standards. GOV.UK warns that letting an unlicensed HMO risks an unlimited fine. The landlord makes the licence application; our job is to deliver a building that meets the conditions.

Southwark HMO Standards for rooms, kitchens and bathrooms in Borough

Southwark's HMO Standards fix the layout of a Borough shared house before the first stud goes up. With the kitchen in its own room, a letting room for one person must reach 10 square metres, and one for a couple 14 square metres. At least half of each room's habitable floor should have 2.3 metres or more of headroom, which can rule out a low attic or back addition room. Beneath these local figures sit the national licence conditions: 6.51 square metres for one adult, 10.22 for two, and no sleeping room under 4.64.

Facilities rise with headcount. Where tenants cannot each have their own, the Standards set a ratio of 5 occupants to each shared bathroom or shower room, each toilet and each wash hand basin, and the same ratio of 5 to each shared kitchen. In a small Borough terrace, the drainage stack and the kitchen size often decide how many rooms can be let. We set out the rooms against these figures with the landlord's designer before we price the work.

Fire safety, sound and energy in a Borough HMO

Fire safety drives the building work in a Borough HMO. Each letting room gets a fire door with a self closer onto a protected escape route, the stair is enclosed with fire rated linings, and an interlinked fire detection and alarm system covers the rooms, the escape route and the kitchen. The LACORS fire safety guide for housing sets the accepted benchmark, and the council's fire standards and Part B apply where building work is done.

Sound between lettings matters more than in a family home, because each room is a separate household with its own hours. We add acoustic insulation in partitions and floors between rooms, and seal gaps around services. Energy rules apply too: since 1 April 2020 a landlord cannot let, or continue to let, a home rated below EPC E without a valid exemption, and Southwark states that letting a domestic property rated F or G is illegal. We plan insulation and heating upgrades into the conversion.

  • Large HMO conversions for seven or more, once planning is granted
  • Insulation and heating upgrades toward the minimum EPC for letting
  • Hard-wearing floors, finishes and decoration for a let house
Service areaBorough · SE1
Local authoritySouthwark Council
Part ofSouth London (Inner London)
Typical homesModern and post-war flats among older commercial buildings
Housing stock18% built before 1919, 3% interwar, 73% post-war; 94% flats, 6% terraced, 0% semi-detached or detached
Also covered nearbyBermondsey, Wapping, Vauxhall, Whitechapel and Kennington

VOA Council Tax stock of properties, March 2025, for Borough & Southwark Street and Southwark St George's. Counts rounded by the VOA.

The GS Renovation Difference in Borough

An HMO conversion is judged at the licence inspection and in the fire risk assessment, so small details count: door closers, detector positions, fire stopping and room sizes. We survey the house, price it in writing and give a written programme that the landlord's designer and the licensing officer can check against the standards. One team covers the partitions, fire doors, plastering, kitchens, bathrooms and decoration. A registered electrician installs and certifies the alarm circuits and electrics, and gas work goes to an engineer on the Gas Safe Register. The founder is your single contact.

  • Neighbours given notice before the noisy stages
  • Existing HMOs brought up to licence conditions, fire works first
  • Finished and snagged before the council's licence inspection
30+ YearsFounder's experience
Fully Insured5 year guarantee
4.9 / 531 MyBuilder reviews
Building ControlCompliant
Free QuotesNo obligation
Reviews

Rated 4.9 / 5 by our clients

★★★★★ 4.9 average from 31 verified reviews on MyBuilder

★★★★★
George always kept to commitments and arrived on time. He offered helpful suggestions during his initial visit and promptly provided a reasonably…
scomtottIslington, London · via MyBuilder
★★★★★
Saaid is the best craftsman I have worked with. He knows what he is doing from the very beginning. He has a great knowledge of construction…
volkan50816Stoke Newington, London · via MyBuilder
★★★★★
George was brilliant. Lovely bloke, very reasonably priced and a perfectionist to boot. He completed our small kitchen renovation with care and great…
OscarCrofton Park, London · via MyBuilder
Read all 31 reviews

FAQ

Frequently Asked Questions about HMO Conversions Borough

How much does an HMO conversion cost in Borough?

Published figures put a light HMO conversion for four to six tenants at £40,000 to £75,000 in construction, and a full conversion with an en-suite to every bedroom at £90,000 to £150,000 (Mayfair Studio, 2026). A Borough house moves within that range with the fire works, the extra bathrooms and the kitchen size. Planning and licence fees are the landlord's and sit outside our quote.

Does a shared house in Borough need an HMO licence?

Yes, while Southwark's additional licensing runs. Its designation reaches every part of the borough and takes in shared houses of up to 4 tenants with a common kitchen or bathroom. Five or more tenants in more than 1 household is a large HMO, which needs the mandatory licence instead, unless it is a flat in a purpose-built block of three or more flats. GOV.UK warns of an unlimited fine for letting an unlicensed HMO, so the landlord should apply before the first tenancy starts.

When does Southwark's additional HMO licensing scheme end?

On 1 March 2027, unless the council revokes it earlier. The designation was made on 28 October 2021 and came into force on 1 March 2022. A scheme can be renewed, so a Borough landlord should build to the licensing standards anyway, since they reflect the room and facility levels Southwark sets for shared housing.

Is planning permission needed to turn a Borough house into an HMO?

For 7 or more occupants, yes, and for an HMO of any size inside an Article 4 direction area. Otherwise a change from a C3 house to a C4 HMO for three to six people is permitted development under Class L. Class L does not allow one house to become two or more separate HMOs, and the owner or their agent makes any application.

Is Borough covered by an HMO Article 4 direction?

Southwark's recorded HMO directions are for Henshaw Street, SE17, covering changes to a small HMO for 4 to 6 people, and Bywater Place, Surrey Docks, SE16, covering HMOs for 3 to 6 people. Borough covers SE1, so neither falls within it. Those are the only two in our research, which is not proof that no direction applies, so ask the planning department to confirm the specific address before buying for an HMO scheme.

How big must a letting room be in a Borough HMO?

With a separate kitchen, Southwark's HMO Standards want 10 square metres or more for a room let to one person and 14 square metres for a room let to a couple. Headroom of 2.3 metres should cover at least half of the room's habitable floor. We mark those minimums out on the floor with the landlord's designer before any stud wall is built.

How many bathrooms and kitchens does a Borough HMO need?

Southwark's HMO Standards work on a ratio of 5 occupants to each shared bathroom or shower room, toilet and wash hand basin, and 5 occupants to each shared kitchen, where tenants lack their own. A six person house in Borough therefore needs a second bathroom and a second set of kitchen facilities, in a second kitchen or a larger shared one, which usually drives the drainage layout.

Does a Borough block of converted flats count as an HMO?

It can. Southwark's additional scheme takes in section 257 HMOs, meaning a converted building of at least 3 storeys with 3 or more self-contained flats in one ownership or control. Southwark makes no charge for a section 257 licence. Where the original conversion falls short of today's building standards, upgrading fire separation and sound insulation is often how the licence conditions are met.

What fire safety work goes into a Borough HMO conversion?

Self closing fire doors to each letting room and the kitchen, an enclosed escape route lined in fire rated board, sealed service penetrations, and an interlinked alarm and detection system. The LACORS fire safety guide for housing is the accepted benchmark for the level of protection. We fit these to the licence conditions and the landlord's fire risk assessment.

Same Service, Nearby Areas

HMO Conversions Near Borough

We carry out hmo conversions across Borough and the surrounding areas. Explore a nearby location:

Ready to Start Your Borough Project?

Free, no-obligation quote for hmo conversions in Borough.

We use these details only to respond to your enquiry. See our privacy policy.

Free, no-obligation quote. We reply within 24 hours. Or call 07472 424 226.

Call 07472 424 226Free quote