Chimney breast removal with gallows bracket or beam support in New Barnet. Trusted, professional, 30+ years' hands-on experience.
In a New Barnet terrace the chimney stack sits inside the party wall and is usually shared, with your flues and your neighbour's flues in the same brickwork. That is why breast removal here is a structural job with a notice attached. The retained masonry above goes onto a beam designed by the structural engineer we appoint.

The breast in a New Barnet front room takes roughly the depth of a bookshelf out of the middle of the wall, and in a narrow terrace room that matters more than it would in a wide semi. Removing it is not a demolition question but a support question: whatever masonry stays above has to bear on something permanent. Gallows brackets are no longer the default answer, since the standard bracket detail was withdrawn in 2024 and most inspectors now want a beam. We price the beam, so there is no awkward change halfway through.
Work top down, always. If breasts are coming out on both floors we deal with the loft section and the stack first, then the bedroom, then the ground floor, so nothing is ever hammered directly above something only recently propped. Where the stack comes off the roof, scaffold goes up and the roof is made watertight before any internal breaking out starts underneath it. A New Barnet terrace roof is usually reached from the front or the rear only, so scaffold access needs settling with the neighbours early.
Because the stack is inside the party wall, the flues serving next door often run through the same brickwork you are cutting. Break into the wrong pot and you have opened a working flue into your own room, which is a real risk on a terrace where the neighbour still has an open fire or a boiler flue in the stack. The engineer's detail says what may be cut and what stays. Work to the party wall is notifiable under the Party Wall etc. Act 1996 and the notice is served by you as building owner, with two months to run.
Barnet Council building control, or an approved inspector, signs off the structural support under the Building Regulations. No planning application is needed for internal work of this kind. We cap any redundant flue and ventilate it, top and bottom, because a sealed damp flue will show as a stain on the chimney breast a winter later. Then the wall is replastered flush. Expect to redecorate the whole room rather than patch, since new plaster takes colour differently and a patch always reads as a patch.
New Barnet owners choose GS Renovation because a shared Victorian stack is not a job to improvise on. We appoint the structural engineer, build the permanent support to their calculations, supply the detail your party wall notice needs for the neighbour who owns half that stack, and hold Barnet building control to their inspection before anything is covered. Founder led, with 30+ years of hands-on structural work.
George was a great find. The job required re-plastering the walls before fitting acrylic panels. He also re-plumbed the shower waste under the solid…
What can I say!!! George is an extremely lovely man his workmanship is second to none, he has an excellent eye for detail and nothing was to much…
George was brilliant. Lovely bloke, very reasonably priced and a perfectionist to boot. He completed our small kitchen renovation with care and great…
FAQ
Any change is costed and agreed in writing before it is carried out. If you add to the chimney breast removal scope at your EN4 property, or the bay-fronted Victorian terraced structure needs more than the survey suggested, GS Renovation sets out the effect on both price and programme. Work does not continue on a New Barnet site until you have agreed it. Ring 07472 424 226 and GS Renovation will explain how variations are handled at an EN4 address. As a rough guide, chimney breast removal in London costs roughly £1,500 to £2,500 for a single floor where gallows brackets are accepted, or £2,200 to £3,250 where a steel beam is needed, which is the more common route now that LABC has withdrawn its standard gallows detail; two floors run £3,000 to £5,000 (indicative London ranges, MyBuilder and Checkatrade, 2026). Your figure depends on the size, specification and condition of the property, which is why we survey before quoting.
Generally yes, because there is less to make good. A newer EN4 home has regular dimensions and predictable construction, so chimney breast removal spends less time on plaster and joinery than it does in Edwardian bay-fronted houses with generous ceiling heights and long rear gardens. The structural stage is similar in both. GS Renovation programmes each New Barnet property on what the survey actually finds rather than on its age alone. The New Barnet programme reflects the construction GS Renovation finds at EN4, not the build date.
Over 30 years of hands-on experience sits behind every judgement made on your EN4 site. That is our founder's, and it shows in how chimney breast removal is scoped in bay-fronted Victorian terraced housing before anything is committed. GS Renovation is fully insured, handles Barnet Council approvals and leaves the New Barnet site clean each day. Ring 07472 424 226 and speak to the people who will actually do the Barnet work. Ask to meet the named manager beforehand.
On a steel beam, or on gallows brackets bolted to the party wall where the building inspector accepts them. LABC withdrew its standard gallows detail in 2024, so most inspectors now prefer a beam. The engineer specifies which suits your EN4 property and Barnet Council inspects it.
More demanding in places, but not harder for a team that works on them constantly. Chimney breast removal at an EN4 address of that age needs proper investigation before design and more care in the finishing afterwards. GS Renovation allows for both in the New Barnet programme. The structural stage itself is usually no more complex than in a newer Barnet property. Ask on 07472 424 226 how chimney breast removal runs on a comparable EN4 house in Barnet.
Only if the masonry above is permanently supported, and in a converted flat that masonry belongs to the flat above and to the freeholder. So it needs three things: a structural engineer's design for a beam carrying the retained stack, the freeholder's written consent under your lease, and notice under the Party Wall etc. Act 1996 to the flat above, the flat below and possibly next door too, because the stack sits in the party wall. Barnet building control inspects the support. Start with the lease and the engineer.
We do not set one. What decides whether GS Renovation takes a chimney breast removal job at an EN4 address is whether we can do it properly and when, not the size of the invoice. Small work in New Barnet often turns into a longer relationship. Call 07472 424 226 and we will tell you honestly if another Barnet trade suits you better. The survey costs nothing regardless. A modest job at EN4 often becomes a longer Barnet relationship.
Every Service, One Team
The same trusted team, 30+ years' hands-on experience and free, no-obligation quotes apply to every GS Renovation service in New Barnet. Explore what else we do locally:
Same Service, Nearby Areas
We carry out chimney breast removal across New Barnet and the surrounding areas. Explore a nearby location:
Free, no-obligation quote for chimney breast removal in New Barnet. Rated 4.9 from 31 reviews on MyBuilder, fully insured, and building control handled for you.