Chimney Breast Removal New Barnet
Chimney breast removal with steel beam support in New Barnet, the beam sized by the engineer we appoint and the work signed off by building control.
- Rated 4.9 from 31 reviews on MyBuilder
- London guide: £2,200 to £3,250
- Free site survey, itemised quote
In a New Barnet terrace the chimney stack sits inside the party wall and is usually shared, with your flues and your neighbour's flues in the same brickwork. That is why breast removal here is a structural job with a notice attached. The retained masonry above goes onto a beam designed by the structural engineer we appoint.
In New Barnet, removing a breast on one floor typically costs £2,200 to £3,250 on a steel beam, and £3,000 to £5,000 across two floors (indicative London ranges, MyBuilder and Checkatrade, 2026). GS Renovation Ltd, a building contractor based in Potters Bar, does the work in New Barnet.
Price guide
| Work | Indicative London range |
|---|---|
| One floor, steel beam (the usual route) | £2,200 to £3,250 |
| One floor, gallows brackets where the engineer and building control accept them | £1,500 to £2,500 |
| Two floors | £3,000 to £5,000 |
Indicative London ranges (MyBuilder and Checkatrade, 2026), not a quotation. Prices checked September 2026. Full breakdown: Chimney Breast Removal Guide.
How the job runs
- Free site survey at your New Barnet address: which floors the breast runs through, a shared stack, any live flue.
- The engineer we appoint designs the support, and the work is registered with Barnet Council building control or an approved inspector. On a shared wall you serve the party wall notice as building owner; we supply the drawings.
- The floor above is propped and the breast comes down in courses from the top; what remains sits on the support the engineer specified.
- Building control inspects the support before it is covered. We make good, and the completion certificate follows.

Taking a breast out of a New Barnet house
The breast in a New Barnet front room takes roughly the depth of a bookshelf out of the middle of the wall, and in a narrow terrace room that matters more than it would in a wide semi. Removing it is not a demolition question but a support question: whatever masonry stays above has to bear on something permanent. Gallows brackets are no longer the default answer, since the standard bracket detail was withdrawn in 2024 and most inspectors now want a beam. We price the beam, so there is no awkward change halfway through.
Work top down, always. If breasts are coming out on both floors we deal with the loft section and the stack first, then the bedroom, then the ground floor, so nothing is ever hammered directly above something only recently propped. Where the stack comes off the roof, scaffold goes up and the roof is made watertight before any internal breaking out starts underneath it. A New Barnet terrace roof is usually reached from the front or the rear only, so scaffold access needs settling with the neighbours early.
Housing in New Barnet
The New Barnet and Hadley Wood statistical areas has around 10,670 homes on the Council Tax list: 52% post-war, 32% interwar and 17% predate 1919, with 50% flats and 50% houses. Many homes here are flats, and post-war blocks in New Barnet rarely have breasts, so one in a flat is checked by the engineer first.
Post-war flues and street-facing stacks in New Barnet
With 52% of New Barnet's homes built after 1945, the breast you want gone may not be a Victorian brick chimney at all. In post-war houses it can be block built with clay or concrete liners, or it can enclose a flue that once served a back boiler or warm air heater. Those later flues were sometimes asbestos cement pipe. We ask for an asbestos survey of the breast before anyone breaks into it, and any appliance still connected is disconnected by a registered gas engineer before the props go up.
Taking the stack off the roof is the part that can need more than building control. On a house it normally falls within householder rights, and a conservation area alone does not change that, but an Article 4 direction can. Barnet's directions each list the works they cover, as the one approved on 31 July 2002 in the Glenhill Close Conservation Area does for gates, fences and walls. Planning Data returns 16 conservation area results for Barnet. If a New Barnet stack is visible from the street, check the address for a conservation area and any direction before scaffold is booked. In a flat, the stack is usually the freeholder's to alter, not yours.
The shared stack, the notice and Barnet sign off
Because the stack is inside the party wall, the flues serving next door often run through the same brickwork you are cutting. Break into the wrong pot and you have opened a working flue into your own room, which is a real risk on a terrace where the neighbour still has an open fire or a boiler flue in the stack. The engineer's detail says what may be cut and what stays. Work to the party wall is notifiable under the Party Wall etc. Act 1996 and the notice is served by you as building owner, with two months to run.
Barnet Council building control, or a registered building control approver, signs off the structural support under the Building Regulations. No planning application is needed for internal work of this kind, unless the house is listed, when listed building consent is needed first. We cap any redundant flue and ventilate it, top and bottom, because a sealed damp flue will show as a stain on the chimney breast a winter later. Then the wall is replastered flush. Expect to redecorate the whole room rather than patch, since new plaster takes colour differently and a patch always reads as a patch.
- Flue capping with ventilation to keep the stack dry
- Rubble bagged and carried out rather than dropped inside
- Fireplace opening infill and new plasterboard finish
VOA Council Tax stock of properties, March 2025, for the New Barnet and Hadley Wood statistical areas, which also take in East Barnet and Hadley Wood. Counts rounded by the VOA.
Why New Barnet Homeowners Choose GS Renovation
New Barnet owners choose GS Renovation because a shared Victorian stack is not a job to improvise on. We appoint the structural engineer, build the permanent support to their calculations, supply the detail your party wall notice needs for the neighbour who owns half that stack, and hold Barnet building control to their inspection before anything is covered. Founder led, with 30+ years of hands-on structural work.
We loved working with George and Ibrahim and would highly recommend them. They have done splendid job on our new kitchen refurb which including new…
The kitchen has been fitted to the high standard. Saaid was polite, professional, tidy, he pays attention to a little details that make huge…
Saiid did a complete refurbishment of our small bathroom. This involved ripping out the existing bath/shower, basin, toilet, pipework, and tiles and…
FAQ
Frequently Asked Questions about Chimney Breast Removal New Barnet
What happens to the chimney breast removal price if the scope changes in New Barnet?
A scope change on chimney breast removal in New Barnet is costed and agreed in writing before it is carried out. If you add to the work at EN5, or the structure of the post-war suburban home needs more than the survey suggested, GS Renovation sets out the effect on price and programme against the original figure within £2,200 to £3,250 for one floor on a beam (indicative). Even a change keeps to the sequence of work: the steel under the stack is inspected before it is boxed in.
My New Barnet flat has a chimney breast. Can I take it out on my floor only?
Only if the masonry above is permanently supported, and in a converted flat that masonry belongs to the flat above and to the freeholder. So it needs three things: a structural engineer's design for a beam carrying the retained stack, the freeholder's written consent under your lease, and notice under the Party Wall etc. Act 1996 to the flat above, the flat below and possibly next door too, because the stack sits in the party wall. Barnet building control inspects the support. Start with the lease and the engineer.
What happens to the hearth and floor after a New Barnet chimney breast comes out?
The hearth goes too, and it is usually deeper than it looks: a concrete or brick slab sitting below the level of the suspended timber floor. Once it is broken out, new joists are fixed to span the gap and boarded to match the existing floor height. Where the room has a solid floor, the hole is filled and screeded. Either way, the floor is levelled before anything is laid.
If I remove my breast in New Barnet, what happens to my neighbour's on the other side?
It stays, because it is theirs. In New Barnet semis and terraces the two breasts sit back to back within the shared wall, and one stack above holds both sets of flues. Your new support has to carry your portion of that brickwork without disturbing theirs. Because the work cuts into a party wall, your neighbour is served notice two months or more in advance and may agree or dissent, the latter leading to a surveyor's award.
Should the chimney breast come out before or after a New Barnet loft conversion?
Before, or as part of the same job. The loft section of the breast is often the part in the way of the new stair or a dormer, and removal works from the top down, so leaving it until later means propping and cutting through finished rooms. Doing it together also lets the engineer design one support scheme, and building control inspect the steel once.
Does removing a breast in my New Barnet house affect the roof?
Only if the stack comes off. Removing the breasts inside and keeping the stack means the steel carries it and the roof is not touched. Taking the stack down as well means scaffold, stripping the tiles around it, and closing up the hole with new rafters, battens and felt before any demolition inside. Any flue left unused should be capped and ventilated, whether or not the stack stays.
Does a purpose-built New Barnet flat have a chimney breast worth removing?
It may have none, and a boxed projection in the corner of a room is something else. In a post-war block it can be a structural column, a riser carrying the building's soil stack and pipes, or a ventilation duct. Half of New Barnet's homes are flats, and in a block that box may be shared with the flats above and below. Nothing boxed in is opened until the freeholder's drawings or a small inspection hole confirm what it is.
Can a chimney come out of a New Barnet house built in 2000 or later?
Usually more simply than in an older house. In newer homes the chimney can be a prefabricated flue system inside a framed or block enclosure, sometimes for a gas fire. The enclosure may carry nothing, but that is confirmed before it goes. In New Barnet 11% of homes were built in 2000 or later. The appliance is disconnected first, the flue removed, and any roof terminal taken off and weathered.
What happens to the shared stack when one interwar New Barnet semi removes its chimney?
Your half of the stack comes down only if next door's half stays stable. On an interwar semi the two sets of flues usually rise in one stack on the party wall, so cutting it back is notifiable and the building owner serves the notice. In New Barnet 32% of homes were built between 1919 and 1939. Reclaimed tiles matching the pair are sourced before the stack is opened.
Every Service, One Team
More GS Renovation Services in New Barnet
One team for every GS Renovation service in New Barnet:
Same Service, Nearby Areas
Chimney Breast Removal Near New Barnet
We carry out chimney breast removal across New Barnet and the surrounding areas. Explore a nearby location:
Ready to Start Your New Barnet Project?
Free, no-obligation quote for chimney breast removal in New Barnet.