Chimney Breast Removal Barnet

Chimney breast removal with steel beam support in Barnet, the beam sized by the engineer we appoint and the work signed off by building control.

Once a Barnet chimney comes down, what happens to the flue decides whether the finish lasts. We cap the head, fit a vent at low level, and only then reinstate and plaster. Support above is a steel beam sized by the structural engineer we appoint, set on padstones and checked by the building inspector.

In Barnet, removing a breast on one floor typically costs £2,200 to £3,250 on a steel beam, and £3,000 to £5,000 across two floors (indicative London ranges, MyBuilder and Checkatrade, 2026). GS Renovation Ltd, a building contractor based in Potters Bar, does the work in Barnet.

Price guide

WorkIndicative London range
One floor, steel beam (the usual route)£2,200 to £3,250
One floor, gallows brackets where the engineer and building control accept them£1,500 to £2,500
Two floors£3,000 to £5,000

Indicative London ranges (MyBuilder and Checkatrade, 2026), not a quotation. Prices checked September 2026. Full breakdown: Chimney Breast Removal Guide.

How the job runs

  1. Free site survey at your Barnet address: which floors the breast runs through, a shared stack, any live flue.
  2. The engineer we appoint designs the support, and the work is registered with Barnet Council building control or an approved inspector. On a shared wall you serve the party wall notice as building owner; we supply the drawings.
  3. The floor above is propped and the breast comes down in courses from the top; what remains sits on the support the engineer specified.
  4. Building control inspects the support before it is covered. We make good, and the completion certificate follows.
A red oxide steel beam installed by GS Renovation with the surrounding structure still propped
The beam in and carrying, with props left standing until the bearings have gone off.

Chimney breasts in Barnet's interwar houses

Most Barnet semis were built with a chimney breast on the party wall serving the front and rear rooms, and that breast helps carry the masonry and stack above it. Homeowners in Finchley and Edgware often want the breast gone to reclaim floor space in a bedroom or reception room, but the flue and stack overhead still have to be supported once the brickwork below is removed.

Where we take out a breast on the lower floors and leave the stack above, we support the retained masonry on a steel beam bearing on padstones, or on gallows brackets only where the engineer and building control accept them. In many Barnet houses the whole stack is now redundant, so removing it entirely and making the roof good is often the cleaner solution. A stack is never left unsupported.

Housing in Barnet

The valuation list shows roughly 160,480 homes in Barnet, of which 20% are pre-1919, 34% interwar and 46% post-1945, split 50% flats to 50% houses. Many homes here are flats, and a chimney breast in a flat in Barnet often supports the breasts in the flats above, so removal needs the freeholder's licence and designed support.

Chimney stacks on Barnet terraces and on The Burroughs

18% of Barnet's homes are terraced houses and 30% are semi-detached or detached, and the chimney question is different in each. In a terrace or a semi, the stack on a party wall often carries flues from both houses, so taking your breast out still leaves next door's flues in the same brickwork. The engineer designs support for masonry that is not yours alone, and the building owner serves party wall notice before it is cut. A detached house has no such neighbour: once every flue is confirmed redundant, the whole stack can come down from the roof in one sequence, which leaves nothing above the removed breasts to carry and nothing to maintain.

Above the roofline, planning can matter as well. Hendon The Burroughs Conservation Area was designated on 27 July 1983, and its Article 4 direction, which covers the houses at 1-8 Burroughs Gardens and 63-77 (odd) The Burroughs, removes permitted development rights for other roof alterations. On those houses, taking a stack down or cutting it below the ridge can be a planning question, so ask Barnet Council before the scaffold is booked. Keeping the stack and removing only the breasts inside avoids that question, and the engineer then designs the steel to hold the retained stack in place.

Party wall notices for Barnet chimney work

In the typical Barnet semi the chimney stack sits within the party wall shared with the house next door, so removing the breast or seating steel in that wall is notifiable under the Party Wall Act. You serve notice on your neighbour as building owner before work starts, with the drawings we supply. The structural support itself is a Building Regulations matter, and Barnet Council building control signs it off, not the planning department.

Once the brickwork is out we cap any redundant flue and ventilate it to prevent damp, then reinstate the floor, walls and skirting so there is no trace the breast was ever there. Because these houses are lived in throughout, we sheet the work area, control the dust from cutting old lime mortar, and clear away the masonry rather than leaving it stacked in the garden.

Faults we find before the breast comes down

Three things commonly go wrong on a Barnet chimney job, and all three are found by looking first. The first is a stack already leaning or cracked at roof level, in which case supporting the base solves nothing and the head needs rebuilding in the same visit. The second is a flue still serving a neighbour's appliance or an open fire, which cannot simply be sealed up and forgotten. Both change the scope, and both are cheaper to find early.

The third is soot. An interwar flue that burned coal for forty years holds a surprising quantity of it, and opening the breast without sealing the room spreads fine black dust through the whole house. We bag the flue high up, bring the soot down in a controlled way and remove it before the brickwork starts. Doing these checks at survey stage is why a price quoted in Finchley or Mill Hill tends to hold to the end.

  • Structural engineer's calculations arranged and followed
  • Loft inspection of the retained stack before work starts
  • Roof tiling, flashing and leadwork made good
Service areaBarnet · EN5, EN4, N2, N3, N11, N12, N20, NW4, NW7, NW9, NW11 and HA8
Local authorityBarnet Council
Part ofNorth London (Outer London) · about 5 miles from our base
Typical homes1930s semis, period houses and substantial suburban homes
Housing stock20% built before 1919, 34% interwar, 46% post-war; 50% flats, 18% terraced, 30% semi-detached or detached, 2% bungalows
Also covered nearbyHaringey, Brent, Camden, Harrow and Enfield

VOA Council Tax stock of properties, March 2025, for all 42 statistical areas in Barnet. Counts rounded by the VOA.

The GS Renovation Difference in Barnet

Barnet homeowners choose GS Renovation because chimney breast removal is structural work and we treat it that way. You get support designed by the structural engineer we appoint, usually a steel beam on padstones, with gallows brackets only where the engineer and building control accept them. We handle Barnet Council building control, keep the dust controlled in your occupied home and leave a fully finished room, backed by our founder's 30+ years on the tools.

Reviewed jobs near Barnet

2 MyBuilder reviews from Barnet, with each customer's own job title:

  • Install new kitchen, Barnet, 15 Apr 2022 (5 out of 5)
  • Bathroom Refurbishment, Barnet, 14 Oct 2021 (5 out of 5)

Read all 31 on our reviews page.

30+ YearsFounder's experience
Fully Insured5 year guarantee
4.9 / 531 MyBuilder reviews
Building ControlCompliant
Free QuotesNo obligation
Reviews

Rated 4.9 / 5 by our clients

★★★★★ 4.9 average from 31 verified reviews on MyBuilder

★★★★★
We loved working with George and Ibrahim and would highly recommend them. They have done splendid job on our new kitchen refurb which including new…
kath833Wood Green, London · via MyBuilder
★★★★★
Saiid did a complete refurbishment of our small bathroom. This involved ripping out the existing bath/shower, basin, toilet, pipework, and tiles and…
mr52782Barnet · via MyBuilder
★★★★★
The kitchen has been fitted to the high standard. Saaid was polite, professional, tidy, he pays attention to a little details that make huge…
khalid75711Barnet · via MyBuilder
Read all 31 reviews

FAQ

Frequently Asked Questions about Chimney Breast Removal Barnet

How accurate is a chimney breast removal quote for a Barnet house?

Accuracy on a chimney breast removal quote in Barnet comes from surveying, itemising and standing behind the total within £2,200 to £3,250 for one floor on a beam (indicative). Quoting low to win a job and correcting it later is the commonest complaint about builders. GS Renovation prices in the order the work runs: the stack above is supported before the breast below comes out. Anything unforeseen is costed before continuing at EN5.

Should we remove the chimney breast on both floors of our Barnet semi?

Taking both floors out is usually the cleaner job. Removing only the ground-floor breast leaves the bedroom breast and the stack above needing permanent support, which means a beam and its bearings inside a shared wall. Go up through both floors and take your side of the stack down at roof level and there is far less left to hold, though on a semi the stack is usually shared, so the engineer designs support for next door's half. The trade-off is scaffolding, roof making good and a longer programme in an occupied 1930s house.

Our Barnet chimney breast still has a gas fire: what happens to it first?

It is disconnected before any demolition. A Gas Safe registered engineer caps the supply safely, and if a boiler or fire elsewhere still uses a flue in the same stack, that appliance is identified too, because it cannot be interrupted. Only when every live flue is accounted for does the engineer's support design get finalised for building control.

Can we remove just the bedroom chimney breast in our Barnet semi?

Yes, and it is often the simpler option. Removing only the upper breast leaves the ground floor breast carrying the stack as before, so the support is limited to the brickwork directly above. Building control approval is still needed, the flue from the ground floor room is kept or capped, and the wall is made good to match the room.

What stops damp appearing after a chimney breast is removed in Barnet?

Venting the old flue. Once a breast is out, the flue above is usually capped at the pot with a ventilated cap and given a small vent at low level, so air keeps moving through it. A sealed flue traps condensation and rainwater, which later marks the plaster. On a shared stack the neighbour's flues are left alone.

Will we need paperwork for a removed chimney breast when selling our Barnet house?

Yes, the completion certificate. A buyer's solicitor will ask for Barnet Council building control's certificate confirming the support was inspected and approved, and a missing one can hold up a sale. If the work touched the party wall, the notice or award should also be kept with your house documents.

Can a Barnet flat owner remove a chimney breast when the flat above keeps its own?

Often, with support designed for everything above. In a converted house the breasts on each floor sit on top of one another, so the one in your flat may be carrying the breast in the flat upstairs and the stack beyond it, and 50% of Barnet homes are flats. The engineer designs steel for that load, the freeholder's written consent is obtained first, and where shared structure is cut the building owner serves notice on the upstairs owner.

Does removing a chimney breast in a detached Barnet house need a party wall notice?

Not for the breast itself, because a detached house has no party wall. 30% of Barnet homes are semi-detached or detached, and where the house is fully detached the main neighbour question is excavation: a new foundation within three metres of a neighbouring building and deeper than its footings is notifiable. Building control approval is still needed for the support design, and taking the full stack down removes the need for steel at all.

Do The Burroughs Article 4 rules stop chimney breasts coming out inside?

No. The Hendon The Burroughs direction removes permitted development rights for enlarging or altering the house and for other roof alterations, which are changes to the outside. Removing breasts inside is Building Regulations work, with an engineer's design for whatever stays above. A planning question can arise if the stack itself is shortened or taken down, so a scheme that keeps the stack on the roof stays clear of the direction.

Ready to Start Your Barnet Project?

Free, no-obligation quote for chimney breast removal in Barnet.

We use these details only to respond to your enquiry. See our privacy policy.

Free, no-obligation quote. We reply within 24 hours. Or call 07472 424 226.

Call 07472 424 226Free quote