Chimney Breast Removal Barking and Dagenham
Chimney breast removal with steel beam support in Barking and Dagenham, the beam sized by the engineer we appoint and the work signed off by building control.
- Rated 4.9 from 31 reviews on MyBuilder
- London guide: £2,200 to £3,250
- Free site survey, itemised quote
A lot of the housing here came out of one build programme, so the same few house types repeat street after street and the chimneys repeat with them. That familiarity helps us price accurately, but every removal still gets its own structural engineer's calculation, and its own building control approval.
In Barking and Dagenham, removing a breast on one floor typically costs £2,200 to £3,250 on a steel beam, and £3,000 to £5,000 across two floors (indicative London ranges, MyBuilder and Checkatrade, 2026). GS Renovation Ltd, a building contractor based in Potters Bar, does the work in Barking and Dagenham.
Price guide
| Work | Indicative London range |
|---|---|
| One floor, steel beam (the usual route) | £2,200 to £3,250 |
| One floor, gallows brackets where the engineer and building control accept them | £1,500 to £2,500 |
| Two floors | £3,000 to £5,000 |
Indicative London ranges (MyBuilder and Checkatrade, 2026), not a quotation. Prices checked September 2026. Full breakdown: Chimney Breast Removal Guide.
How the job runs
- Free site survey at your Barking and Dagenham address: which floors the breast runs through, a shared stack, any live flue.
- The engineer we appoint designs the support, and the work is registered with Barking and Dagenham Council building control or an approved inspector. On a shared wall you serve the party wall notice as building owner; we supply the drawings.
- The floor above is propped and the breast comes down in courses from the top; what remains sits on the support the engineer specified.
- Building control inspects the support before it is covered. We make good, and the completion certificate follows.

Chimney breast removal in Barking and Dagenham's terraced houses
Many of the borough's 1930s terraced houses still have their original chimney breasts in the reception rooms and bedrooms, long after the fireplaces stopped being used. In these interwar houses the stack typically sits on the party wall shared with the adjoining house, and the breast helps support the masonry rising above it, so we begin every job with a structural engineer confirming what the removal will affect.
Where you remove a breast on the ground or first floor but keep the stack above, that remaining masonry must be carried, usually on a steel beam bearing on padstones, or on gallows brackets only where the engineer and building control accept them. A stack is never left unsupported. Where the whole stack is redundant we often take it down entirely and make the roof good instead.
Housing in Barking and Dagenham
The stock in Barking and Dagenham runs to roughly 81,800 dwellings, 36% of them flats and 64% houses, built 4% before 1919, 50% between 1919 and 1939 and 46% after 1945. A terrace breast in Barking and Dagenham usually sits on the party wall, so removal needs a notice, and 55% of homes here are terraced.
Old chimney breast removals in Barking and Dagenham homes
Chimney breast removal has its own line in the building control fee schedule issued by Be First Building Control, and Barking and Dagenham asks to be told about removing chimney breasts. That matters when you buy a house as well as when you alter one. If a breast has already gone, ask the seller's solicitor for the completion certificate before exchange. Without one, you inherit the question of what holds up the breast and stack above, and in a Barking and Dagenham terrace the answer can be steel on padstones, gallows brackets, or nothing more than the bedroom floor.
Barking and Dagenham accepts 4 types of building control application, and regularisation is the one for work already done without approval. For a removed breast, it means opening the ceiling or the loft floor so the inspector and the structural engineer we appoint can see what carries the retained breast and stack. Where there is sound steel on padstones, that may be all that is needed. Where there is nothing, the support is designed and fitted before the regularisation is signed off. Start this before a sale is agreed, because it cannot be rushed once a buyer's solicitor is waiting.
Party wall and building control in the borough
Because the chimney stack in a Barking and Dagenham house usually stands within the party wall shared with next door, removing the breast or seating steel in that wall is notifiable under the Party Wall Act. You serve the notice on your neighbour as building owner before work begins, with the drawings we supply, so the shared wall is properly accounted for.
The support to the retained stack is structural, so it is notifiable under the Building Regulations and Barking and Dagenham Council's building control signs it off, not the planning department. We manage the lot: appointing the engineer for the design, safe removal, propping and capping, ventilating any redundant flue to keep damp out, and replastering so the room looks like the breast was never there.
Why Becontree construction changes the approach
The Becontree houses went up quickly through the 1920s and 1930s, and they were not all built the same way. Some are conventional cavity brickwork, others use a thinner outer skin or non-traditional panel construction, and a number were repaired or rebuilt after wartime damage. That matters because the support has to bear on sound masonry. A steel beam on padstones is now the usual route, and gallows brackets, which need sound solid brickwork to bolt into, are used only where the engineer and building control accept them.
In a terraced row the flues usually rise back to back inside the shared wall, so your neighbour's flue may be a single brick from yours. We check whether their fireplace is still in use before opening anything, because breaking into a live flue pushes fumes next door. If the house was bought from the council, it is worth checking your transfer for any covenant covering structural alterations before we begin. Where the property is still leasehold from the council, consent has to be obtained before the first brick moves.
Where the rubble goes in Dagenham
A breast taken out over two floors produces far more waste than most owners expect, several tonnes of brick, mortar and old flue parging, and every bit of it leaves the house by hand. In the Becontree streets that is usually the easy part, because most of these houses have a front garden or a hardstanding, so a skip or a set of tonne bags can stand on your own land and no permit is needed at all.
Where a house has no frontage, or the drive is already taken, the skip has to sit on the public highway and the council issues a permit for that. We arrange it rather than leaving it with you. Everything that leaves site travels with a licensed carrier under the duty of care and we keep the transfer notes. Sound facing brick is often set aside if you want it for a garden wall, and the rest is sorted for recycling.
- Structural engineer's calculations arranged and followed
- Steel beam support on padstones for a retained stack above
- Skirting, cornice and picture rail matched back in
VOA Council Tax stock of properties, March 2025, for all 22 statistical areas in Barking and Dagenham. Counts rounded by the VOA.
Why Barking and Dagenham Homeowners Choose GS Renovation
Barking and Dagenham homeowners choose GS Renovation because we treat chimney breast removal as the structural job it really is. You get support designed by the structural engineer we appoint, usually a steel beam on padstones, with gallows brackets only where the engineer and building control accept them. We give you the drawings for the party wall notice you serve, handle building control from start to finish and work tidily in your occupied home, leaving a certified result backed by our founder's 30+ years on the tools.
We loved working with George and Ibrahim and would highly recommend them. They have done splendid job on our new kitchen refurb which including new…
Giorgio is an excellent and intelligent workman, and with very reasonable prices! He installed a kitchen extractor fan in a complicated situation…
George was very friendly and helpful from start to finish. He worked really hard to ensure our kitchen was installed to a high standard and was…
FAQ
Frequently Asked Questions about Chimney Breast Removal Barking and Dagenham
Why do chimney breast removal quotes in Barking and Dagenham vary so much?
Variation in chimney breast removal quotes across Barking and Dagenham almost always comes from what has been left out. GS Renovation prices structure, trades, approvals and reinstatement after an IG11 survey, so the total can look higher than a quote covering half of it. The honest range is £2,200 to £3,250 for one floor on a beam (indicative), and whether the stack above is kept or taken down decides the support and roof work, which a quote without a survey cannot know.
Can an unsupported chimney breast left by a previous owner in RM8 be fixed?
Yes, and it should be dealt with promptly. This turns up in interwar houses across the borough: a ground-floor breast taken out decades ago with the first-floor masonry sitting on nothing but the plaster skin. An engineer inspects, specifies retrofit support, and we install it, usually a beam because LABC's 2024 decision to drop its bracket detail left that as the straightforward route. Barking and Dagenham Council building control then regularises the work.
If I remove my chimney breast in a Dagenham terrace, what happens to next door's?
Nothing physically, but they still have to be told. In a terrace the flues from both houses usually rise inside the shared wall, so your breast and your neighbour's sit back to back. Taking yours away, or cutting into that wall to seat a beam, counts as work to a party structure, so you serve notice at least two months ahead and their side is recorded before we start.
Should I take out the breast on both floors of my Barking house?
Usually it is cleaner to do both. If only the ground-floor projection comes out, the breast upstairs and the stack above it need carrying on new steel. Take out both and only the stack is left to support, on a single beam at loft level, or it can come down entirely if it is redundant. The engineer compares the options, and the choice also decides whether roof work and scaffolding are needed at all.
Will I need paperwork for a chimney breast removal when I sell my Barking and Dagenham home?
Yes: buyers' solicitors ask for the building control completion certificate. Barking and Dagenham Council issues it once the inspector has seen the support under the retained stack and the finished work. Without it, a sale can stall while the buyer asks for an engineer's report or indemnity. Keeping the calculations, the inspection record and any party wall award together makes that question easy to answer later.
What happens to the hearth when a chimney breast comes out in RM8 or RM10 Dagenham houses?
The hearth has to go too, and it is heavier than people expect. On a suspended timber floor it usually sits on a concrete or brick base built up between trimmer joists, so once it is broken out the joists are extended or new ones fitted and the floor is boarded level with the rest of the room. The flue behind is capped and a vent is fitted so it stays dry.
Does removing a chimney stack need consent in a Barking and Dagenham conservation area?
Ask before assuming it does not. In the borough's conservation areas, the council's consent is required to demolish buildings and structures in whole or part, and changing the profile of a roof requires the council's consent. A stack taken down alters the roofline, so raise it with the planning team first. Removing the breasts inside, with the stack kept and carried on steel, leaves the outside unchanged while that is settled.
How much notice does Barking and Dagenham need before a chimney breast comes out?
At least 48 hours before work starts on the building notice route, with the fee paid on submission. The route is meant for minor domestic works such as alterations, which a single breast in a house fits. Have the steel or brackets on site and the propping ready before the notice goes in, then ask for the inspection on the day the support is in place and before any ceiling is boarded.
Should the breasts on both floors of a Barking and Dagenham terrace come out together?
Usually, and the paperwork is simpler done once. 55% of homes in Barking and Dagenham are terraced houses, where the breast on each floor can stand against the party wall, and cutting one away brings a party wall notice served by the building owner. Removing both in one job means one application, one set of props and one inspection of the support for the stack. Doing the ground floor now and the bedroom later means two applications and two rounds of making good.
Every Service, One Team
More GS Renovation Services in Barking and Dagenham
One team for every GS Renovation service in Barking and Dagenham:
Same Service, Nearby Areas
Chimney Breast Removal Near Barking and Dagenham
We carry out chimney breast removal across Barking and Dagenham and the surrounding areas. Explore a nearby location:
Ready to Start Your Barking and Dagenham Project?
Free, no-obligation quote for chimney breast removal in Barking and Dagenham.