Bathroom Renovation Highgate

Bathroom and wet-room refurbishment in Highgate, tanked, plumbed and tiled by one team.

GS Renovation fits bathrooms and en-suites across Highgate, working within the tight footprints of N6's Victorian and Edwardian houses and flats. We handle waterproofing, drainage, tiling, heating and ventilation as one job, turning dated bathrooms and awkward closet-wing spaces into calm, hard-wearing rooms that last.

In Highgate, a full bathroom refit typically costs £6,000 to £20,000 or more (indicative London ranges, MyBuilder and Checkatrade, 2026). GS Renovation Ltd, a building contractor based in Potters Bar, does the work in Highgate: we carry the tanking, plumbing and tiling as one contract, with the electrics certified by a registered electrician.

Price guide

WorkIndicative London range
Bathroom renovation, full refit£6,000 to £20,000+

Indicative London ranges (MyBuilder and Checkatrade, 2026), not a quotation. Prices checked September 2026. Full breakdown: Bathroom Renovation Cost.

Quick estimate for Highgate

Highgate range: choose above

How the job runs

  1. Free design visit at your Highgate home and an itemised quote.
  2. Strip-out, then first-fix plumbing and electrics.
  3. Tanking to the wet areas, then tiling.
  4. Sanitaryware and second fix, with notifiable electrics certified by a registered electrician. Typically 10 to 15 working days on site.
A walk-in shower built by GS Renovation, tiled in large format marble-effect porcelain with a lit recess
A low profile tray with a linear waste, black framed screen and a lit niche formed in the tiling.

Wet rooms and en-suites in Highgate

Proper waterproofing is the part you never see but always feel the benefit of. We tank walls and floors before tiling, so a wet room or walk-in shower in a Highgate terrace stays watertight for years rather than leaking into the timber floors below. Getting the falls, drainage and membranes right is especially important in these period homes, where suspended floors and old joists leave little room for error.

Space is usually the challenge in an N6 bathroom. Many Highgate houses have their bathroom in the rear closet wing, long, narrow and short on natural light, so we plan space-saving layouts, wall-hung sanitaryware and walk-in showers to make the most of every inch. Squeezing an en-suite into a bedroom or over the stairs is often possible too, and we sort the drainage runs and ventilation to make it work.

Housing in Highgate

Highgate counts roughly 10,090 homes for Council Tax; 47% are older than 1919, 24% interwar and 28% post-war, with 69% flats and 31% houses. Since most homes here are flats, a bathroom in a flat in Highgate sits over a neighbour's ceiling, so it is tanked before tiling and a moved WC needs the freeholder's licence.

Old drains and tree roots under a Highgate bathroom

A new bathroom in Highgate connects to drains that may be well over a century old. 47% of homes here were built before 1919, and on plots with mature trees, clay pipes of that age can have open joints that roots have found. Before a new en-suite or a relocated bathroom is connected, have the underground run surveyed by camera from the new connection to the public sewer. Finding a cracked or root-filled pipe before the new floor goes in is simpler than after the first blockage.

If the survey points to a tree, the fix can involve cutting roots back. Highgate was designated as a Conservation Area in 1968, so check whether your plot is inside it. If it is, Camden wants six weeks' notice before roots are cut on any tree whose trunk is more than 75mm across at 1.5 metres up. In a converted house the drains serve every flat, so the survey report goes to the freeholder, and the lease decides who pays for the repair to the shared run. Settle that before the bathroom programme depends on it.

Period bathroom upgrades across N6 Highgate

Underfloor heating makes a real difference in a Highgate bathroom, freeing up wall space and taking the chill off the tiled floors these solid-walled homes are prone to. We lay it beneath porcelain or natural stone, pair it with a heated towel rail, and insulate properly so the warmth goes up into the room rather than down into the floor void. It is one of the upgrades N6 clients notice most.

Ventilation and drainage decide whether a bathroom stays fresh or grows damp, and in a period terrace both need thinking through. We fit effective extraction to clear moisture, run new soil and waste connections where the old ones fall short, and detail the tiling and finishes to suit the character of the house. Careful sequencing means the room is out of use for as short a time as possible.

  • Wall and floor tiling in stone, porcelain or mosaic
  • Downstairs cloakroom and WC installation
  • Bespoke vanity units and storage
Service areaHighgate · N6
Local authorityCamden Council and Haringey Council (depending on the address)
Part ofNorth London (Inner London)
Typical homesPeriod houses on the edge of the Heath, most of them now flats (69% of homes)
Housing stock47% built before 1919, 24% interwar, 28% post-war; 69% flats, 16% terraced, 15% semi-detached or detached
Also covered nearbyCrouch End, Muswell Hill, Hampstead, Golders Green and Kentish Town

VOA Council Tax stock of properties, March 2025, for Highgate West, Highgate East and Highgate Wood. Counts rounded by the VOA.

The GS Renovation Difference in Highgate

Highgate clients choose us because we get the hidden work right, the tanking, falls, drainage and ventilation, not just the tiles on top. Fitting bathrooms into the tight closet wings and period layouts of N6 takes experience, and our founder's 30+ years on the tools means we make small, awkward spaces work beautifully and stay watertight for the long term.

30+ YearsFounder's experience
Fully Insured5 year guarantee
4.9 / 531 MyBuilder reviews
Building ControlCompliant
Free QuotesNo obligation
Reviews

Rated 4.9 / 5 by our clients

★★★★★ 4.9 average from 31 verified reviews on MyBuilder

★★★★★
Saiid did a complete refurbishment of our small bathroom. This involved ripping out the existing bath/shower, basin, toilet, pipework, and tiles and…
mr52782Barnet · via MyBuilder
★★★★★
George was a great find. The job required re-plastering the walls before fitting acrylic panels. He also re-plumbed the shower waste under the solid…
andrew_lackEnfield · via MyBuilder
★★★★★
It's the second time I have hired George and he has been absolutely professional and the work he did resembles perfectly what I had in mind. Being an…
ariabuffadesignerHornsey, London · via MyBuilder
Read all 31 reviews

FAQ

Frequently Asked Questions about Bathroom Renovation Highgate

How accurate is a bathroom renovation quote for a Highgate house?

The accuracy of a bathroom renovation quote in Highgate depends on the information behind it. A phone figure will move; one written after GS Renovation has checked the N6 property usually does not, because soil stack distance decides where a Highgate WC can go, and that is only visible on site. Any Camden Council or Haringey Council building control fee is shown separately, and the range to compare against is £6,000 to £20,000 or more (indicative).

Can you fit a wet room into a small Highgate closet-wing bathroom?

Yes. The rear closet wing of a Highgate terrace is often the ideal spot for a wet room, though the suspended timber floor means the tanking and falls have to be detailed carefully to stay watertight. We fully waterproof the space, set the drainage and gradients correctly, and choose a layout and sanitaryware that make the most of a narrow N6 footprint.

How long will my Highgate flat be without a bathroom?

The refit takes 10 to 15 working days on site, and in a one-bathroom flat the room is out of action for most of that. Where the layout allows, the toilet can be reconnected at the end of each day through the early stages. Tanking must cure before tiling, so the middle of the programme cannot be rushed. Some owners stay elsewhere for the tiling and fitting days.

How do I protect the flat below when renovating my Highgate bathroom?

By treating every wet surface as if it will leak. The floor is tanked and the membrane taken up the walls, waste joints stay accessible, and the shower tray or former is fully bedded so it cannot flex. Before the floor is closed, the waste runs are tested with water. In a converted Highgate house, water through a timber floor ends up on a neighbour's ceiling, so this is where care is spent.

My Highgate flat bathroom has no window. How is it ventilated?

With a mechanical fan ducted to outside, which Part F requires in any case. In an internal bathroom the duct usually runs through a ceiling void to an external wall or a shared riser, the latter needing the freeholder's agreement. A fan with an overrun timer, plus an undercut door to let replacement air in, keeps condensation off the walls. The duct length is checked at survey.

Will a new shower have enough pressure in my upper floor Highgate flat?

That depends on how the water reaches you. A combi boiler or unvented cylinder runs at mains pressure, which usually copes on an upper floor, though the flow rate limits a large shower head. A gravity system fed from a tank only slightly above the shower gives weak pressure and may need a pump, which then needs a suitable valve. Flow is measured at survey before anything is chosen.

Does a Highgate flat bathroom move need Camden building control approval?

Where new waste pipes connect to the shared stack, yes, because that is drainage work under building regulations. A leaseholder in Camden needs the freeholder's consent and must make a full plans application rather than a building notice. With 69% of Highgate homes being flats, this is the route a leaseholder's bathroom move takes, so allow for the approval before booking the strip out.

Can a bathroom go into a listed Highgate house without disturbing historic fabric?

Only with listed building consent, since any change to a listed building in Camden needs it, separately from planning. The consent application should show every pipe route, not only the fittings, because notching historic joists, lifting original boards or cutting a new vent through a front wall is what the consent turns on. Running wastes in a raised floor or a later partition keeps more original fabric intact.

Is a bathroom in a newer Highgate flat harder to move?

Often, because of the floor rather than the plumbing. Only 5% of Highgate homes were built in 2000 or later, and a flat of that age is likely to have a concrete slab with a shallow screed, which leaves little depth for a waste fall. A raised floor with a step, or a pumped waste, may be needed to move a shower. Ask the managing agent for the as-built drainage drawings before choosing a layout.

Ready to Start Your Highgate Project?

Free, no-obligation quote for bathroom renovation in Highgate.

We use these details only to respond to your enquiry. See our privacy policy.

Free, no-obligation quote. We reply within 24 hours. Or call 07472 424 226.

Call 07472 424 226Free quote