Bathroom Renovation Golders Green

Bathroom and wet-room refurbishment in Golders Green, tanked, plumbed and tiled by one team.

GS Renovation renovates bathrooms across Golders Green, working within the tight upstairs spaces of NW11's Edwardian and interwar houses and flats. We deliver fully waterproofed bathrooms, wet rooms and en-suites, handling the drainage, tiling, ventilation and heating so everything works reliably and lasts.

In Golders Green, a full bathroom refit typically costs £6,000 to £20,000 or more (indicative London ranges, MyBuilder and Checkatrade, 2026). GS Renovation Ltd, a building contractor based in Potters Bar, does the work in Golders Green: we carry the tanking, plumbing and tiling as one contract, with the electrics certified by a registered electrician.

Price guide

WorkIndicative London range
Bathroom renovation, full refit£6,000 to £20,000+

Indicative London ranges (MyBuilder and Checkatrade, 2026), not a quotation. Prices checked September 2026. Full breakdown: Bathroom Renovation Cost.

Quick estimate for Golders Green

Golders Green range: choose above

How the job runs

  1. Free design visit at your Golders Green home and an itemised quote.
  2. Strip-out, then first-fix plumbing and electrics.
  3. Tanking to the wet areas, then tiling.
  4. Sanitaryware and second fix, with notifiable electrics certified by a registered electrician. Typically 10 to 15 working days on site.
A walk-in shower built by GS Renovation, tiled in large format marble-effect porcelain with a lit recess
A low profile tray with a linear waste, black framed screen and a lit niche formed in the tiling.

Waterproofing bathrooms in Golders Green houses

Bathrooms in NW11 houses are frequently squeezed into the rear closet wing or a boxed-off corner of a bedroom, often with older plumbing and poor ventilation. Before any tiling goes up, we tank and waterproof the walls and floor properly, which matters in wet rooms and walk-in showers where water is not contained by a tray. Done correctly, this prevents damp, leaks and the problems that plague poorly built bathrooms.

Ventilation and drainage need real thought in these older homes. We fit extraction that clears moisture properly, upgrade waste runs where the falls are inadequate, and address any existing damp before the new bathroom goes in. Underfloor heating is a popular addition, warming tiled floors that would otherwise feel cold, and it frees up wall space by removing the radiator, which is valuable in a compact period bathroom.

Housing in Golders Green

Take the 7,590 or so homes the valuation list gives Golders Green: 56% flats, 44% houses, 47% from before 1919, 26% interwar and 27% post-war. Where most homes are flats, a bathroom in a flat in Golders Green sits over a neighbour's ceiling, so it is tanked before tiling and a moved WC needs the freeholder's licence.

Water pressure and hot water in Golders Green period bathrooms

47% of Golders Green homes were built before 1919, and a house of that age may still run its bathroom from a tank in the loft and a vented cylinder, giving low pressure at the shower. A new rainfall shower or a second bathroom will expose that. The choices are a pump on the stored system, an unvented cylinder fed from the mains, or a combination boiler, and the last two depend on the mains supply being strong enough. Before sanitaryware is chosen, we measure the incoming flow and pressure at the stop tap, and check whether the supply pipe is old lead that limits both.

Newer flats have their own limits. 13% of Golders Green homes were built in 2000 or later, and in a block of that age the soil stack and supply pipes pass through fire-stopped openings in each floor, often inside a riser behind the bath or WC. When the old suite comes out, that fire stopping has to be left intact or reinstated with a tested product, and the riser access panel kept usable. Tiling over an access panel, or packing the gap round a pipe with ordinary expanding foam, breaks the block's fire design, and the managing agent may inspect for it.

En-suites and layouts in Golders Green homes

Adding an en-suite to a main bedroom is a common request in these larger period houses, borrowing space from an oversized bedroom or a landing. The challenge is running new hot, cold and waste pipes discreetly through a solid-walled house and keeping the drainage falls right. We plan the layout so the fittings work in a small footprint, using compact sanitaryware and walk-in showers to make the space feel generous.

For family bathrooms we make the most of awkward period proportions, fitting the bath under a sloping ceiling or building storage into an alcove beside the chimney breast. Tiling, underfloor heating, ventilation and lighting are all handled by our own team, and the notifiable electrical work is certified by a registered electrician under Part P. From a full family bathroom to a compact en-suite, we finish to a standard built for daily use.

  • Shower pumps and pressure improvements where flow is poor
  • Grout, silicone and trim detailing at completion
  • Floor strengthening before large-format tiles or stone
Service areaGolders Green · NW11
Local authorityBarnet Council
Part ofNorth London (Outer London) · about 8 miles from our base
Typical homesEdwardian and interwar houses
Housing stock47% built before 1919, 26% interwar, 27% post-war; 56% flats, 6% terraced, 36% semi-detached or detached
Also covered nearbyFinchley, Hendon, Hampstead, Highgate and Muswell Hill

VOA Council Tax stock of properties, March 2025, for Golders Green North and Golders Green South. Counts rounded by the VOA.

Trusted Bathroom Renovation in Golders Green

Golders Green homeowners choose GS Renovation for bathrooms because we get the parts you cannot see right, the tanking, drainage and ventilation, before the tiling ever begins. Our founder's 30+ years on the tools means we know how to route services through solid walls and use tight spaces well. One team delivers a watertight, well-finished bathroom.

30+ YearsFounder's experience
Fully Insured5 year guarantee
4.9 / 531 MyBuilder reviews
Building ControlCompliant
Free QuotesNo obligation
Reviews

Rated 4.9 / 5 by our clients

★★★★★ 4.9 average from 31 verified reviews on MyBuilder

★★★★★
Saiid did a complete refurbishment of our small bathroom. This involved ripping out the existing bath/shower, basin, toilet, pipework, and tiles and…
mr52782Barnet · via MyBuilder
★★★★★
George was a great find. The job required re-plastering the walls before fitting acrylic panels. He also re-plumbed the shower waste under the solid…
andrew_lackEnfield · via MyBuilder
★★★★★
The kitchen has been fitted to the high standard. Saaid was polite, professional, tidy, he pays attention to a little details that make huge…
khalid75711Barnet · via MyBuilder
Read all 31 reviews

FAQ

Frequently Asked Questions about Bathroom Renovation Golders Green

How much should bathroom renovation in Golders Green cost?

The cost of bathroom renovation in Golders Green is typically £6,000 to £20,000 or more (indicative), and the NW11 survey decides where in that range your job lands. The biggest mover is what the survey finds: a timber floor over the room below decides how the wet area is built. GS Renovation shows any Barnet Council building control fee on its own line, and the written figure follows within days of the visit.

Can you fit a wet room in a small Golders Green bathroom?

Yes. Wet rooms suit the compact bathrooms in NW11 houses and flats because they remove the shower tray and make a small space feel more open. The key is proper tanking, so the whole floor and walls are fully waterproofed, along with correct drainage falls and good ventilation. We handle the waterproofing, the underfloor heating, the tiling and the fit-out so the finished wet room stays dry and reliable.

How long does a Golders Green bathroom refit take from start to finish?

10 to 15 working days once work begins on site. Delays tend to arise earlier: tiles and sanitaryware with long lead times, or the freeholder's consent in a flat. On site the sequence is fixed. Old suite out, first fix pipes and cables, waste falls set, tray or former laid, tanking, tiling, then fittings and the electrician's certificate.

Can a Golders Green loft bathroom drain to the existing soil stack?

It can, if the pipe can fall far enough on the way there. A toilet in the eaves may sit several metres from the stack, and its waste needs a continuous gradient without dropping through a bedroom ceiling. Where that fails, a new branch or stack is run, with a macerator only as a last resort. The loft joists also need checking for the added weight.

Should underfloor heating go under the tiles of my Golders Green bathroom?

It suits a small bathroom well, freeing wall space for a towel rail or storage. On a timber floor an electric mat over insulation board is simplest, laid once the floor is stiffened and before tanking. Its new circuit is notifiable under Part P, so a registered electrician connects and certifies it, with the thermostat probe set in place before tiling.

What protects the flat below a Golders Green bathroom?

Waterproofing and access. Tanking the floor and walls stops water reaching timber and the ceiling underneath, sealed wastes with proper falls prevent slow leaks, and an access panel lets future repairs happen without breaking tiles. Flats make up 56% of Golders Green dwellings, so a failure here usually lands on someone else's ceiling, and the lease normally requires consent to move a bathroom.

Why do old Golders Green bathroom floors need checking before new tiles go down?

Because generations of plumbers may have notched the joists to run pipes, and a notched joist lets the floor flex enough to crack tiles and grout. In a house built before 1919 the bathroom floor has often been cut into more than once. 47% of Golders Green homes date from before 1919. When the boards come up, deep notches are repaired or the joists strengthened, and the floor is stiffened with a suitable board before any tanking or tiling starts.

Can we add a second bathroom to our Golders Green conversion flat?

Possibly, if the waste can reach the stack and the lease allows it. 56% of Golders Green homes are flats, and a new WC needs a steady fall to the shared stack, which normally belongs to the freeholder, so a licence to alter is usually required. Placing the room above a neighbour's bedroom may be refused. A macerator is a last resort rather than a plan, since it needs its own electrical supply and servicing, and some leases forbid them.

Does adding en-suites to let rooms in a Hampstead Garden Suburb house need the Trust?

Letting rooms can amount to a change of use, and in the Suburb that needs the approval of the Hampstead Garden Suburb Trust as well as Barnet Council. The en-suites are building work, but the use behind them is the planning question. Settle the use with both bodies before fitting out several bathrooms, since the answer may change how many rooms are worth doing.

Ready to Start Your Golders Green Project?

Free, no-obligation quote for bathroom renovation in Golders Green.

We use these details only to respond to your enquiry. See our privacy policy.

Free, no-obligation quote. We reply within 24 hours. Or call 07472 424 226.

Call 07472 424 226Free quote