Office Fit-Out Catford
Office fit-outs for small and medium office suites in Catford, partitions, ceilings, lighting and small power for your office, with the IT and specialist trades coordinated.
- Rated 4.9 from 31 reviews on MyBuilder
- UK guide: £70 to £120 per sq ft
- Free site survey, itemised quote
Office fit-out in Catford is small-scale work, and it is worth being plain about that. Catford is a Major Centre in the Lewisham Local Plan, but it is not one of the London Plan's named office locations. Expect a suite above a shop near Catford Broadway or Catford Bridge station, a professional office, a studio or a community room. We strip out, build partitions, ceilings, lighting, power and tea points, and hand the space back ready for your staff, working to the landlord's consent and Lewisham's building control.
For Catford, the construction part of an office fit-out is published at £70 to £120 per sq ft as a UK guide, and an all-in London office fit-out at £148 to £359 per sq ft (Oktra and Cushman and Wakefield, 2026). GS Renovation Ltd, a building contractor based in Potters Bar, does the work in Catford: we build the office partitions, ceilings, lighting and finishes as one contract and coordinate the IT supplier and specialist trades around them.
Price guide
| Work | Indicative range |
|---|---|
| Office fit-out, construction only | £70 to £120 per sq ft |
| London office fit-out, all-in | £148 to £359 per sq ft |
| Metal stud partition, boarded both sides | £55 to £65 per m² |
| Suspended ceiling, grid and tile | £22 to £35 per m² |
| Dilapidations at lease end | £15 to £20 per sq ft |
Indicative ranges from published cost guides (Cushman and Wakefield, Oktra and Checkatrade, 2026), not a quotation. Most are UK-wide figures and London work usually costs more; a row marked London is a London figure. Prices checked September 2026.
Quick estimate from UK guide figures
Guide range: choose above

The office space that actually exists in Catford
Expect upper floors and small suites in Catford rather than office blocks. The London Plan names Croydon town centre as the strategic outer London office location, and Catford's role in the Lewisham Local Plan is a Major Centre and Regeneration Node, where offices sit alongside shops, services and homes. A Catford job might be a first floor above a shop turned into a practice office, a small agency studio or a room let to a charity.
That scale shapes the job. Access is often through a side door and a narrow stair, so partitions and ceiling tiles come in by hand. The building may have flats on the floor above, which brings fire separation and noise into the design. Power and data are usually older than the tenant needs, and the landlord's electrical supply may limit what can be added. We survey the suite before pricing, so those limits are in the quote rather than found later.
Cat A, Cat B and the landlord's licence in Catford
Before a Catford office is priced, agree who pays for which level of finish. Cat A is the landlord's base: open floor, ceilings, lighting, heating, WCs and power to the perimeter. Cat B is the tenant's layout on top of it: meeting rooms, glazed screens, tea point, furniture power and data routes. In a small suite above a shop the line is often blurred, so we split the quote into landlord and tenant items to match the heads of terms.
The lease usually requires a licence for alterations before partitions, ceilings or services change, and the landlord's surveyor may want drawings and a method statement. The lease also sets what has to be reinstated at the end, so partitions and cabling are best designed to come out cleanly. When a lease ends, we can price dilapidations work to the schedule the landlord serves, stripping back to the state the lease describes.
Building control and escape routes in a Catford office
An office fit-out in Catford is building work where it changes escape, structure, drainage or services, and Lewisham's own building control inspectors check that it complies with the regulations on fire safety, energy conservation and access. For a first floor suite the key issue is Part B: the route down the stair must stay protected, and new rooms must not make anyone pass through a risk area to get out. Part M covers access and Part L the new lighting and controls.
A new WC, staff shower or tea point on an upper floor needs a waste run with a fall to the stack, so we trace that route before the layout is fixed. We sequence the job so fire stopping, door frames and service penetrations stay visible until inspected. As a commercial client you carry duties under the Construction (Design and Management) Regulations, such as allowing enough time and sharing what you know about the building.
Catford's office stock and the Class MA Article 4 Direction
The Class MA Article 4 Direction matters to a Catford office tenant as context about the stock, not as part of the fit-out. Class MA otherwise lets a Class E building, offices included, change to housing through prior approval. Lewisham set 01 November 2025 as the date for its direction removing that right to come into force, covering Major Centres, District Centres, Local Centres, Strategic Industrial Locations and Mixed-Use Employment Locations. An office floor inside the Catford Major Centre would then need planning permission to become housing.
For a landlord in Catford that points towards reletting an empty office floor rather than quietly converting it, and a refit can help it let. We price a landlord's Cat A refresh, with new lighting, decoration and a tidy WC, separately from a tenant's Cat B layout, so the two can be compared. A planning agent can confirm whether a building at the edge of the centre falls inside the direction's boundary.
- Tea points and kitchenettes on the existing risers
- LED office lighting with presence and daylight controls
- Glazed screens and glass-fronted meeting rooms
VOA Council Tax stock of properties, March 2025, for Catford East & Mountsfield Park and Catford Bridge. Counts rounded by the VOA.
Why Choose GS Renovation in Catford
An office fit-out is judged by the Monday your staff move in. We fix the scope and long lead items first, then run strip out, partitions, ceilings, electrics by a registered electrician, plumbing, flooring and decoration as one sequence with our own trades, coordinating with your IT supplier for data. You get a written quotation after a survey of the suite, a scope that separates landlord and tenant items, a written programme and one named point of contact.
- Clean, tidy and reliable tradespeople
- Full plans building control coordinated for the new office layout from the outset
- Fire alarm, emergency lighting and air conditioning specialists on one programme
Reviewed jobs near Catford
1 MyBuilder review from Crofton Park, with each customer's own job title:
- Replace small section of wooden worktop, sink, tap and gas hob, Crofton Park, 17 Apr 2024 (5 out of 5)
Read all 31 on our reviews page.
George was brilliant. Lovely bloke, very reasonably priced and a perfectionist to boot. He completed our small kitchen renovation with care and great…
Giorgio is an excellent and intelligent workman, and with very reasonable prices! He installed a kitchen extractor fan in a complicated situation…
Saaid is the best craftsman I have worked with. He knows what he is doing from the very beginning. He has a great knowledge of construction…
FAQ
Frequently Asked Questions about Office Fit-Out Catford
What should a business budget for an office fit-out in Catford?
Treat the UK guide of £70 to £120 per square foot for the construction work (Oktra, 2026) as a floor; London all-in figures run £148 to £359 per square foot (Cushman and Wakefield, 2026). Add the landlord's fees for the licence for alterations, any dilapidations at lease end, and your IT and furniture, which sit outside the building work. A Catford quote follows a survey of the space.
Do you fit out small offices above shops in Catford?
Yes. Catford is a Major Centre where offices sit above and beside shops, and we fit out upper floor suites, studios and small professional offices, which need the same care over fire separation and escape as larger offices. Access for materials is often through the shop or a side door, so we agree delivery times and routes with you and the tenant below.
What is the difference between Cat A and Cat B in a Catford office?
Cat A is the landlord's shell finish: ceilings, lighting, heating, WCs and floor boxes or perimeter power, ready for any tenant. Cat B is the tenant's own fit-out on top: partitions, meeting rooms, tea point, furniture power and branding inside. In a small Catford suite the lease heads of terms decide which items fall on which side, so read them before comparing quotes.
Does a Catford office fit-out need building control?
Where the work is building work, yes: new partitions that change escape routes, new WCs, drainage, structure and the lighting controls Part L covers. Lewisham's building control inspectors check fire safety, energy conservation and access, or a registered building control approver can be used. A registered electrician certifies the wiring. We book the inspections into the programme.
Can an office fit-out in Catford run at night or at weekends?
Quiet work can, with the landlord's agreement; noisy work generally cannot. Lewisham restricts construction noise to 8am to 6pm on weekdays and 8am to 1pm on Saturdays, with no work on Sundays or bank holidays. In an occupied building we phase the job, doing drilling and cutting in the day behind screens and leaving decoration or cabling tidy ups for quieter times.
Can a Catford office building be turned into flats without planning permission?
Not inside the centre once Lewisham's direction applies. Lewisham set 01 November 2025 as the date its Article 4 Direction removing the Class MA right comes into force in its Major Centres and other named locations. A change to housing there needs a planning application made by the owner or their agent, which is a separate project from an office fit-out.
How long does Lewisham take to approve plans for a Catford office fit-out?
Up to five weeks. On a full plans application Lewisham sends its decision within five weeks, unless you have given a three week extension. A building notice cannot be used for a building covered by the Fire Safety Order, which includes offices, so notifiable fit-out work goes through full plans or a registered building control approver. Your designer submits, and we start once the route is settled.
Who deals with data cabling in a Catford office fit-out?
Your IT supplier specifies and usually terminates the network, and we coordinate the containment. We install the trunking, floor boxes, ceiling routes and power to the positions on the layout, so the cabling installer can pull and test on a day that suits both teams. Agreeing desk positions early in a Catford suite avoids chasing new routes after decoration.
Can you carry out dilapidations work when a Catford office lease ends?
Yes. When a lease ends, the landlord usually serves a schedule of dilapidations listing what must be repaired or reinstated. We price the work to that schedule, remove partitions and cabling, make good ceilings and floors and redecorate, so the space goes back in the condition the lease describes. Agree the scope with the landlord's surveyor before we start.
Every Service, One Team
More GS Renovation Services in Catford
One team for every GS Renovation service in Catford:
Same Service, Nearby Areas
Office Fit-Out Near Catford
We carry out office fit-out across Catford and the surrounding areas. Explore a nearby location:
Ready to Start Your Catford Project?
Free, no-obligation quote for office fit-out in Catford.