Flat Refurbishment Holland Park
Flat refurbishments in Holland Park, your flat renewed within the lease, the licence and the rules of the block.
- Rated 4.9 from 31 reviews on MyBuilder
- UK guide: £33,000 to £48,000
- Free site survey, itemised quote
Flats make up 81% of homes in Holland Park, so flat refurbishment is where most homes here fall. Some are floors of divided period villas, some are in post-war blocks, and a few are recent: 28% of homes were built after 1945 and 4% in 2000 or later. Whatever the building, the work happens inside a structure shared with neighbours, so the lease, the managing agent, the block's rules and the flat below shape the job as much as the flat itself.
For Holland Park, published UK averages put a full flat refurbishment at £33,000 to £48,000 and a basic one, with budget kitchen and bathroom fittings, at £15,000 to £18,000, and London flats usually cost more (Checkatrade and MyJobQuote, 2026). GS Renovation Ltd, a building contractor based in Potters Bar, does the work in Holland Park: we refurbish the flat within the terms of your lease and licence to alter, protect the common parts throughout, and a registered electrician certifies the new consumer unit and circuits.
Price guide
| Work | Indicative range |
|---|---|
| Flat, full refurbishment | £33,000 to £48,000 |
| Flat, basic refurbishment | £15,000 to £18,000 |
| Full rewire, one-bed flat | from £3,900 |
| Consumer unit replacement | £350 to £750 |
| Sound insulation under a new floor | £45 to £160 per square metre |
Indicative ranges from published cost guides (Checkatrade and MyJobQuote, 2026), not a quotation. Most are UK-wide figures and London work usually costs more; a row marked London is a London figure. Prices checked September 2026.
Quick estimate from UK guide figures
Guide range: choose above

The lease and licence to alter come before the tools
A Holland Park flat is usually held on a lease, and the lease decides what you may change. Leases commonly need the freeholder's or managing agent's written licence to alter before walls, floors, bathrooms or the kitchen move. Managing agents in Holland Park handle these applications often and tend to ask for the same things: drawings, a method statement, a programme, contractor details and how the common parts will be protected.
We supply the method statement, programme and contractor details for that pack, and the drawings come from you or your designer. The agent may also set conditions of its own, such as a surveyor's inspection, an acoustic specification for new floors, or fixed start and finish dates. Read the lease for a clause on hard floors, because some forbid them outright and others require a tested acoustic layer. Only once the licence is signed do we order finishes for a Holland Park flat.
Housing in Holland Park
For Holland Park the Council Tax list gives about 4,280 homes; by type 81% flats and 19% houses, by age 28% post-war, 4% interwar and 67% older than 1919.
Divided villas and post-war Holland Park blocks
The kind of building changes the job. A flat on one floor of a Holland Park villa has high ceilings, lath and plaster, an old shared stair and services that may run through the flat below. A flat in a post-war block has concrete floors, shared risers and a lift, and the building's own rules on when the lift may carry materials. Holland Park's housing is largely substantial period villas around garden squares, so a floor of a divided house is a likely starting point.
Inside a divided villa, the kitchen and bathroom are the rooms with most risk, because a leak lands in someone else's ceiling. We test the old waste runs, fit new isolation valves and leak-proof the wet areas before tiling. In a block, the flat entrance door and the fire compartment walls belong to the freeholder or responsible person, so any work touching them goes through the managing agent first. A rewire and new consumer unit inside the flat are certified by a registered electrician.
Quiet hours, lifts and van bays for a Holland Park flat
Noise is the first thing neighbours in a shared Holland Park building complain about. Where the Royal Borough's Final Draft Code of Construction Practice applies, noisy works audible at the site boundary are allowed from 8am to 6pm, Monday to Friday, with none at weekends or on public holidays. A block's own rules can be tighter, and where they are, we work to the tighter hours. Drilling, chasing and floor lifting are grouped so the quieter days are predictable for the residents.
Logistics come next. Common parts and lifts are protected with boarding and corner guards before anything is carried, and waste leaves in bags rather than stacking on the landing. The council suspends parking bays for building or maintenance works where tradespeople use vans, not cars, so deliveries are timed to a suspended bay outside the building. On a larger site with an agreed Construction Traffic Management Plan, only the suspensions agreed in that plan are issued.
Letting a Holland Park flat after refurbishment
For a landlord, the gap between tenancies in a Holland Park flat is the time to deal with the energy rating. The council states it is unlawful to rent out a domestic property with an EPC rating of F or G without a valid exemption. GOV.UK says that since 1 April 2020 landlords can no longer let or continue to let properties covered by the MEES Regulations below E without a valid exemption. Insulation, heating controls and window upgrades are the usual levers.
Licensing can apply too. In Kensington and Chelsea every privately rented property occupied by three or more people living as two or more households who share facilities must be licensed. Even with five or more sharers, a purpose-built flat in a block of more than two self-contained flats is licensed under the Additional scheme. The landlord or their agent applies. We refurbish to the licence conditions and hand over the electrician's and gas engineer's certificates.
- EPC improvements to meet the minimum standard for let flats
- Condensation control with extract fans and trickle vents
- Common parts protection: floor sheeting, corner guards and lift lining
VOA Council Tax stock of properties, March 2025, for Holland Park. Counts rounded by the VOA.
Why Holland Park Homeowners Choose GS Renovation
You get a builder used to working inside shared buildings, where the neighbours matter as much as the finish. We give the managing agent what it needs for a licence to alter, protect the common parts, keep to the block's hours, and plan deliveries around suspended bays. Kitchens and bathrooms are built with leaks to the flat below in mind, and the electrical and gas trades that certify their own work are coordinated inside our programme, so you deal with one contact.
- Kitchens and bathrooms renewed within the existing footprint and drainage
- Free follow-up visit after completion if anything needs attention
- Void periods between tenancies planned to a fixed handover date
George always kept to commitments and arrived on time. He offered helpful suggestions during his initial visit and promptly provided a reasonably…
We loved working with George and Ibrahim and would highly recommend them. They have done splendid job on our new kitchen refurb which including new…
It's the second time I have hired George and he has been absolutely professional and the work he did resembles perfectly what I had in mind. Being an…
FAQ
Frequently Asked Questions about Flat Refurbishment Holland Park
How much does a flat refurbishment cost in Holland Park?
Published UK averages put a full flat refurbishment at £33,000 to £48,000 and a basic one at £15,000 to £18,000 (Checkatrade and MyJobQuote, 2026), and London flats usually cost more. In a Holland Park block the building adds its own lines: protecting the common parts, carrying materials up, working in the managing agent's hours and meeting the lease's floor rules. The quote after the survey itemises each one.
Does refurbishing a Holland Park flat need the freeholder's permission?
Usually yes. Leases commonly require a licence to alter before walls, floors, bathrooms or kitchens change, and the managing agent will want drawings, a method statement and a programme. Check the lease for hard floor clauses too. Planning permission is a separate question that arises mainly for external changes.
What hours can noisy work run in a Holland Park block of flats?
From 8am to 6pm, Monday to Friday, where the Royal Borough's Final Draft Code of Construction Practice applies, with no noisy works at weekends or on public holidays. Many blocks set tighter hours in their own rules, and we follow whichever limit is stricter for your building.
Can a Holland Park flat with an EPC rating of F be let?
Not without a valid exemption. The council states it is unlawful to rent out a domestic property rated F or G without one, and GOV.UK says private landlords may not let on new tenancies at F or G since 1 April 2018. A refurbishment between tenancies is the practical time to lift the rating.
Does a Holland Park flat let to sharers need a licence?
Yes, if three or more people living as two or more households share facilities. Kensington and Chelsea requires every such privately rented property to be licensed, and where five or more share a purpose-built flat in a larger block, it comes under the Additional scheme rather than the Mandatory one. The landlord applies, and we build to the conditions.
Can timber or stone floors go into a Holland Park flat?
Often, if the lease allows them and the build-up includes an acoustic layer. Hard floors carry impact noise to the flat below far more than carpet, so many leases require a tested resilient layer or forbid hard floors altogether. We price the acoustic build-up with the floor and check the lease clause before ordering.
Who deals with the flat entrance door in a block?
Usually the freeholder or the building's responsible person, because the entrance door forms part of the fire compartment between the flat and the common parts. If your refurbishment touches the door, the frame or the compartment walls, raise it with the managing agent first and replace like for like only with their agreement.
How are materials carried up without damaging the common parts?
By protecting the route first. Stair treads, walls, lift cars and entrance doors are covered before any delivery, loads are booked into quiet times, and waste leaves the building in sealed bags each day. The protection is photographed at the start and end, so the managing agent can see the common parts were returned as found.
What happens if a new bathroom leaks into the flat below?
The aim is to stop it before it happens. We fit isolation valves, test new waste and supply runs under pressure, and seal the wet area before tiling. Old waste pipes shared with the building are inspected where they are reachable. If a leak does appear later, the valves and test records make the source quicker to trace.
Every Service, One Team
More GS Renovation Services in Holland Park
One team for every GS Renovation service in Holland Park:
Same Service, Nearby Areas
Flat Refurbishment Near Holland Park
We carry out flat refurbishment across Holland Park and the surrounding areas. Explore a nearby location:
Ready to Start Your Holland Park Project?
Free, no-obligation quote for flat refurbishment in Holland Park.