Flat Refurbishment Bexley

Flat refurbishments in Bexley, your flat renewed within the lease, the licence and the rules of the block.

Flat refurbishment in Bexley is work inside a building you share with neighbours. The VOA figures show 27% of homes in the borough are flats, and each one comes with a lease, a freeholder or managing agent, and rules about hours, floors and common parts. We renew the kitchen, bathroom, wiring, heating and finishes inside the flat, and plan the deliveries, noise and waste around the people above, below and beside you. For a landlord, the scope is set around the EPC and any licence conditions.

For Bexley, published UK averages put a full flat refurbishment at £33,000 to £48,000 and a basic one, with budget kitchen and bathroom fittings, at £15,000 to £18,000, and London flats usually cost more (Checkatrade and MyJobQuote, 2026). GS Renovation Ltd, a building contractor based in Potters Bar, does the work in Bexley: we refurbish the flat within the terms of your lease and licence to alter, protect the common parts throughout, and a registered electrician certifies the new consumer unit and circuits.

Price guide

WorkIndicative range
Flat, full refurbishment£33,000 to £48,000
Flat, basic refurbishment£15,000 to £18,000
Full rewire, one-bed flatfrom £3,900
Consumer unit replacement£350 to £750
Sound insulation under a new floor£45 to £160 per square metre

Indicative ranges from published cost guides (Checkatrade and MyJobQuote, 2026), not a quotation. Most are UK-wide figures and London work usually costs more; a row marked London is a London figure. Prices checked September 2026.

Quick estimate from UK guide figures

Guide range: choose above

A bathroom refitted by GS Renovation with large marble-effect porcelain tiles, a wall-hung WC, a white vanity unit and a bath with a glass screen
The bathroom renewed within its existing footprint, with the pan hung on a concealed frame and the tiling carried floor to ceiling.

What the lease and managing agent control in a Bexley flat

In Bexley 27% of homes are flats, whether in purpose-built blocks, newer developments or houses that were split up in the past. Almost every one sits under a lease, and its alteration covenant may ban some changes outright, allow them with consent, or permit non-structural work freely. Before any drawing is made, read what the lease says about alterations. A new kitchen layout, a moved bathroom, hard flooring or a rewire usually needs the freeholder's written licence to alter, and the managing agent may ask for drawings, a method statement and the contractor's details before issuing it. Build that approval time into the start date, because nothing should be stripped before the licence is signed.

The block's own rules then shape the programme. A managing agent may set quieter working hours than Bexley's standard construction hours, reserve the lift for residents at busy times and require the stairs and hallways to be protected with boards and runners from the entrance to your door. In a newer building the agent may also control fob access and the fire alarm, which has to be isolated or covered while dust is being made. We agree those points in writing at the start, so the neighbours know what to expect and the agent has one contact on site.

Housing in Bexley

Count the homes in Bexley and you get about 101,760: 48% built since 1945, 41% between the wars and 11% before 1919, with flats at 27% and houses at 73%.

Getting materials in and waste out of a Bexley block

Logistics decide the pace of a flat job more than the building work does. Plasterboard, tiles, a kitchen and a bath all have to come up the stairs or in the lift, and the old ones have to go down again, without marking the common parts. On an upper floor flat with no lift we plan smaller, more frequent deliveries and carry waste down in bags rather than stacking it on the landing. A van or a skip outside the block in Bexley needs somewhere legal to stand, which can mean a suspended parking bay.

Bexley charges for suspending a parking bay by the day or by the week, so a short, planned window for the strip out and the large deliveries costs less than holding a bay for the whole job. A skip on the road needs its own permit, covering one skip for up to 14 days, and some blocks will not allow one outside at all. In that case we use wait-and-load bag collections, which leave nothing on the road overnight and suit the tighter frontage of a block. The managing agent should know the date of each collection in advance.

Floors, sound and fire safety inside a Bexley block

Hard floors carry sound to the flat below far more than carpet does. Where you swap carpet for timber, laminate or tiles in a Bexley flat, the lease may require an acoustic underlay or a floating floor that cuts impact noise, and the agent may ask to see the specification before granting the licence. The build-up raises the floor level a little, so door linings and thresholds are adjusted to suit. A leak through that floor is the other risk to the neighbours, so we pressure test the new plumbing before any finishes go down.

Fire safety in a block is shared. The flat entrance door, and the walls and floors that separate your flat from the rest of the building, are generally matters for the freeholder or the responsible person. Do not change the front door, cut new holes through separating walls or open up the ceiling without their agreement. Inside the flat we fit smoke and heat alarms to suit the layout and fire-stop around every new service penetration. In a higher-risk building the Building Safety Regulator is the building control body for notifiable work, although work done under a competent person scheme, such as a rewire, does not need its approval.

Letting a refurbished Bexley flat: EPC, MEES and licensing

A buy-to-let flat between tenancies has an energy floor to clear. Since 1 April 2020 landlords can no longer let, or continue to let, a property covered by the MEES Regulations with an EPC rating below E unless a valid exemption applies, and local authorities enforce that with a fine per property. In a flat the levers are the heating, the controls, the hot water, the windows and the lighting, since the roof and external walls usually belong to the freeholder. Your energy assessor tells you which measures move the rating most, and we price the Bexley scope around that list.

Licensing adds its own conditions in one part of the borough. Bexley's selective licensing scheme covers Belvedere Ward and runs from 13 January 2025 to 12 January 2030, so a privately rented flat there needs a licence, and the licence carries property conditions the refurbishment should meet. Outside that ward, Bexley says a privately rented home that is not a licensable HMO does not need one. The landlord applies for the licence, and we build to the standards it sets, such as working alarms, safe electrics and sound fixtures.

  • Buy-to-let refurbishments between tenancies, with the EICR and gas safety record arranged with the certifying engineers
  • Full and basic flat refurbishments within the existing layout
  • Hard floors, carpet and vinyl laid over a level, sound base
Service areaBexley · DA6, DA5, DA7, DA8, DA14, DA15, DA16, DA17, DA18, DA1 and SE2
Local authorityBexley Council
Part ofSouth East London (Outer London)
Typical homes1930s semis and post-war suburban family homes
Housing stock11% built before 1919, 41% interwar, 48% post-war; 27% flats, 27% terraced, 40% semi-detached or detached, 6% bungalows
Also covered nearbyGreenwich and Bromley

VOA Council Tax stock of properties, March 2025, for all 28 statistical areas in Bexley. Counts rounded by the VOA.

The GS Renovation Difference in Bexley

A flat job succeeds on the relationships around it as much as on the work itself. We deal with the managing agent from the first visit, supply the method statement and programme the licence to alter asks for, and keep the common parts protected and clean. Inside the flat we sequence the strip out, first fix, plaster and second fix so the kitchen and bathroom are out of use for as short a time as possible. A registered electrician certifies the wiring, and you get one contact and a written quote after a site visit.

  • Founder with 30+ years of hands-on experience
  • Deliveries timed around the lift, the stairs and the parking rules of the block
  • Noisy days agreed with the managing agent and flagged to neighbours in advance
30+ YearsFounder's experience
Fully Insured5 year guarantee
4.9 / 531 MyBuilder reviews
Building ControlCompliant
Free QuotesNo obligation
Reviews

Rated 4.9 / 5 by our clients

★★★★★ 4.9 average from 31 verified reviews on MyBuilder

★★★★★
George always kept to commitments and arrived on time. He offered helpful suggestions during his initial visit and promptly provided a reasonably…
scomtottIslington, London · via MyBuilder
★★★★★
We loved working with George and Ibrahim and would highly recommend them. They have done splendid job on our new kitchen refurb which including new…
kath833Wood Green, London · via MyBuilder
★★★★★
Giorgio is an excellent and intelligent workman, and with very reasonable prices! He installed a kitchen extractor fan in a complicated situation…
Adil KhanWoolwich, London · via MyBuilder
Read all 31 reviews

FAQ

Frequently Asked Questions about Flat Refurbishment Bexley

What should I budget to refurbish a flat in Bexley?

Use the UK range of £33,000 to £48,000 for a full refurbishment (Checkatrade and MyJobQuote, 2026) as a floor, and add for London prices and for what the block requires. The licence to alter is between you and your freeholder, so any fee they charge sits outside the building quote. The Bexley survey fixes the scope, and each trade is priced as its own line.

Does refurbishing a Bexley flat need the freeholder's permission?

Usually, for anything beyond decoration. In Bexley 27% of homes are flats, and each lease sets out what needs the freeholder's licence to alter, typically new flooring, a moved kitchen or bathroom, a rewire and any change to walls. Read the alterations clause first, then send the agent drawings and a method statement so the licence is signed before the start date.

What working hours apply inside a block of flats in Bexley?

Two sets of hours can apply. Bexley's normal construction hours are 8am to 6pm on weekdays and 8am to 1pm on Saturday, with no work on Sundays or bank holidays. The lease or the managing agent may set a tighter window inside the block, and the tighter rule is the one to follow. We plan the noisy stages to fit inside both.

Does a rented flat in Belvedere, Bexley need a licence?

Yes, if it is privately rented and inside Belvedere Ward. Bexley's selective licensing scheme covers that ward from 13 January 2025 to 12 January 2030. The landlord applies, and the licence sets conditions on the property, so it pays to refurbish to those conditions before the inspection rather than after it.

What EPC rating must a let flat in Bexley reach?

At least E, unless a valid exemption applies. Since 1 April 2018 a private landlord may not grant a new tenancy on a property rated F or G, and since 1 April 2020 the rule covers continuing lets too. A refurbishment between tenancies is the least disruptive time to fit efficient heating, controls and lighting that lift the rating.

Can the bathroom move to another room in a Bexley flat?

Sometimes, if the lease allows it and the waste can reach the soil stack at a workable fall. Most leases need the freeholder's licence to alter for a moved bathroom, and many managing agents object to a bathroom placed over a neighbour's bedroom. New drainage is building regulations work, and Bexley building control must be notified at least 48 hours before work starts on site. We check the stack position and the floor void before you commit to the layout.

Can a new hard floor go down without upsetting the flat below?

Yes, with the right build-up. An acoustic underlay or a floating floor cuts the impact noise that timber and tiles carry, and the lease may name a standard it must meet. We check the lease wording, show the agent the specification before work starts, and adjust door linings and thresholds for the extra height of the new floor.

Who is responsible for the front door of a flat in a block?

Generally the freeholder or the responsible person for the building, not the leaseholder alone, because the entrance door is part of the fire separation between the flat and the common parts. Check the lease and ask the managing agent before changing it. Inside the flat, new alarms and fire-stopping around new services are part of our scope.

What happens if a leak from the works reaches the flat below?

Prevention comes first. We isolate and cap supplies during the strip out, pressure test new pipework before floors and boxing close it in, and fit proper isolation valves to appliances. If water does escape, the supply is shut off, the neighbour and the managing agent are told straight away, and the damage is recorded for the building's insurers.

Same Service, Nearby Areas

Flat Refurbishment Near Bexley

We carry out flat refurbishment across Bexley and the surrounding areas. Explore a nearby location:

Ready to Start Your Bexley Project?

Free, no-obligation quote for flat refurbishment in Bexley.

We use these details only to respond to your enquiry. See our privacy policy.

Free, no-obligation quote. We reply within 24 hours. Or call 07472 424 226.

Call 07472 424 226Free quote