Chimney Breast Removal Clerkenwell

Chimney breast removal with steel beam support in Clerkenwell, the beam sized by the engineer we appoint and the work signed off by building control.

Clerkenwell's converted workshops throw up stacks in odd places, some serving old industrial flues rather than fireplaces. Before we quote, we open up and check what the breast is actually carrying. If it comes out, the load above goes onto a beam designed by the structural engineer we appoint, with building control involved from the start.

In Clerkenwell, removing a breast on one floor typically costs £2,200 to £3,250 on a steel beam, and £3,000 to £5,000 across two floors (indicative London ranges, MyBuilder and Checkatrade, 2026). GS Renovation Ltd, a building contractor based in Potters Bar, does the work in Clerkenwell.

Price guide

WorkIndicative London range
One floor, steel beam (the usual route)£2,200 to £3,250
One floor, gallows brackets where the engineer and building control accept them£1,500 to £2,500
Two floors£3,000 to £5,000

Indicative London ranges (MyBuilder and Checkatrade, 2026), not a quotation. Prices checked September 2026. Full breakdown: Chimney Breast Removal Guide.

How the job runs

  1. Free site survey at your Clerkenwell address: which floors the breast runs through, a shared stack, any live flue.
  2. The engineer we appoint designs the support, and the work is registered with Islington Council building control or an approved inspector. On a shared wall you serve the party wall notice as building owner; we supply the drawings.
  3. The floor above is propped and the breast comes down in courses from the top; what remains sits on the support the engineer specified.
  4. Building control inspects the support before it is covered. We make good, and the completion certificate follows.
A red oxide steel beam installed by GS Renovation with the surrounding structure still propped
The beam in and carrying, with props left standing until the bearings have gone off.

Removing a chimney breast in Clerkenwell

Not every Clerkenwell flat has a chimney breast; the newer purpose-built apartments never did. But the converted Victorian workshops and warehouse buildings often retain original breasts and flues from their industrial days. Because the breast helps carry the brickwork above it, we begin every removal with a structural engineer confirming exactly what load the masonry is supporting before anything is taken down.

On lower floors we support the retained stack above on a steel beam bearing onto padstones, the usual route since LABC withdrew its standard gallows detail in 2024, or on gallows brackets only where the engineer and building control accept them. Where a stack runs the full height of the building, it is often cleaner to remove the whole thing and make the roof good. A retained stack is never left hanging unsupported, whatever the floor level.

Housing in Clerkenwell

Take the 7,790 or so homes the valuation list gives Clerkenwell: 96% flats, 4% houses, 26% from before 1919, 6% interwar and 65% post-war. Most homes here are flats, and post-war blocks in Clerkenwell rarely have breasts, so one in a flat is checked by the engineer first.

Chimney breasts in listed Clerkenwell buildings need a second consent

Chimney breasts in Clerkenwell are found in the older buildings, and 26% of homes here were built before 1919. Some of those buildings are listed. Islington Council states that the borough currently has around 4,500 listed buildings, and in a listed building, listed building consent is needed for internal work as well as external. A breast inside a flat is therefore not exempt because it cannot be seen from the street. That consent sits alongside building regulations approval and the freeholder's licence; it does not replace either of them, and none of the three can be skipped.

The check is made before anything is drawn. We look the building up on the list, and if it is listed the removal is designed with that consent in mind, which can mean keeping the breast and reworking the room around it. A locally listed building is different. Islington Council says it is not necessary to apply for Listed Building Consent for works to a locally listed building, though the usual planning controls apply. Removing a breast inside one is then a building control matter, with support for the masonry left above designed by the structural engineer we appoint.

Freeholder consent and party walls in EC1

In a leasehold Clerkenwell flat, removing a chimney breast needs the freeholder's licence to alter and the managing agent's sign-off, since it touches structure the building owner is responsible for. We prepare the engineer's support drawing for that consent and work to any building-management conditions, including protecting common parts and meeting sound-insulation standards between flats.

Where the stack sits within a wall shared with the adjoining flat or building, removal is notifiable under the Party Wall Act and you serve notice on that neighbour first as building owner, using the drawings we supply. The structural support is controlled under the Building Regulations, so Islington Council's building control signs it off. We also cap any redundant flue with ventilation to prevent damp, then replaster so the room is left clean.

Working inside a managed EC1 block

In a managed building the constraints are as much administrative as structural. Most blocks around Exmouth Market and Clerkenwell Green set working hours, want notice to the managing agent before a contractor starts, and ask for proof of public liability insurance and a method statement. Some restrict use of the lift for materials or require it to be protected, which changes how a tonne of brick rubble leaves the building.

We plan that route before the first day. Rubble goes out in bags carried down rather than dropped through a stairwell, communal carpet and lift interiors are protected, and the common parts are cleaned at the end of each day rather than the end of the job. Neighbours in a block live close to the work, so we tell them what is happening and which days are the noisy ones. Getting this right is usually what makes a freeholder comfortable.

  • Support for the breasts in the flats above, to the engineer's design
  • Flue capping with ventilation to keep the stack dry
  • Loft inspection of the retained stack before work starts
Service areaClerkenwell · EC1
Local authorityIslington Council
Part ofNorth London (Inner London)
Typical homesPost-war council blocks and new apartments among loft-style warehouse conversions
Housing stock26% built before 1919, 6% interwar, 65% post-war; 96% flats, 4% terraced, 0% semi-detached or detached
Also covered nearbyAngel, Old Street, Hoxton, Shoreditch and Bloomsbury

VOA Council Tax stock of properties, March 2025, for Clerkenwell. Counts rounded by the VOA.

The GS Renovation Difference in Clerkenwell

Clerkenwell homeowners choose GS Renovation because we treat chimney breast removal as the structural job it is. You get an engineer-designed support, normally a steel beam, with gallows brackets only where the engineer and building control accept them, the freeholder's licence and building control all handled, tidy working in an occupied EC1 flat, and a certified result backed by our founder's 30+ years on the tools.

30+ YearsFounder's experience
Fully Insured5 year guarantee
4.9 / 531 MyBuilder reviews
Building ControlCompliant
Free QuotesNo obligation
Reviews

Rated 4.9 / 5 by our clients

★★★★★ 4.9 average from 31 verified reviews on MyBuilder

★★★★★
We loved working with George and Ibrahim and would highly recommend them. They have done splendid job on our new kitchen refurb which including new…
kath833Wood Green, London · via MyBuilder
★★★★★
George always kept to commitments and arrived on time. He offered helpful suggestions during his initial visit and promptly provided a reasonably…
scomtottIslington, London · via MyBuilder
★★★★★
Saaid is the best craftsman I have worked with. He knows what he is doing from the very beginning. He has a great knowledge of construction…
volkan50816Stoke Newington, London · via MyBuilder
Read all 31 reviews

FAQ

Frequently Asked Questions about Chimney Breast Removal Clerkenwell

Is the price of chimney breast removal higher in Clerkenwell than elsewhere in North London?

Location is not a line on a chimney breast removal quotation in Clerkenwell; two North London homes of the same age get similar figures within £2,200 to £3,250 for one floor on a beam (indicative). What separates them is condition and access at the EC1 address, and the approvals route, since the work needs Islington Council building control approval of the steel carrying the retained stack. There is no travel surcharge within Islington.

Can a chimney breast be removed in a Clerkenwell warehouse conversion?

Sometimes, but the brick pier in front of you may be original mill structure. EC1 conversions were built as workshops and warehouses, so what reads as a domestic breast is often a load-bearing pier carrying beams for the floors above. The freeholder's consent, an engineer's inspection and Islington Council building control all come into it. We open a small area first to establish what it is before anyone commits to a design.

Can a chimney breast be removed if another Clerkenwell flat sits above mine?

Only with the masonry above properly carried. The engineer sizes a steel beam beneath the retained breast, or specifies gallows brackets where building control accepts them for that wall. Because the upper breast sits in someone else's flat, the freeholder's written consent is needed first, and the neighbour above will want to know how their floor is protected during the work.

Is a disused industrial flue in a Clerkenwell building dealt with differently?

The principles hold, the scale changes. Old workshop flues can be wider than domestic ones and may serve several floors, so the engineer confirms what the surrounding brickwork carries before any cutting. A redundant shaft gets a vented cowl up top and an air grille lower down, because a sealed flue sweats. Where it runs through other units, those owners and the freeholder are involved from the outset.

Does taking out my Clerkenwell chimney breast affect the neighbour through the wall?

If the breast is bonded into the wall you share, yes. That makes it party wall work, and they must receive a party structure notice two clear months ahead. They may consent or dissent, and dissent brings surveyors and an award. Their own breast, often back to back with yours, stays in place, and their flue must remain open and working after yours is sealed.

Can I just reduce the depth of a Clerkenwell chimney breast instead of removing it?

Cutting a breast back still removes masonry that may be carrying load, so it is treated as structural work rather than a trim. The engineer checks how much can go without undermining the brickwork above, and building control approval applies as it would for a full removal. In practice, partial cut-backs often end up supported on the same steel a complete removal would need.

Why does a Clerkenwell buyer's solicitor ask about a removed chimney breast?

Because a removal with no completion certificate leaves open whether the masonry above is properly carried. Islington Council issues completion certificates after satisfactory completion of works in accordance with the building regulations and full payment of fees. We keep the engineer's support design, the inspection dates and the certificate together and hand them over at the end, so a later sale of the Clerkenwell flat is not held up by a missing record.

Is listed building pre-application advice worth having for a Clerkenwell chimney breast?

It is where the building is listed and the breast is original. Islington runs a householder listed building pre-application service, with written advice following a site visit. An officer who sees the room, the fireplace and the breast in place can say whether removal is likely to be acceptable before drawings and a full consent application are prepared. We give the officer the engineer's outline of how the masonry above would be carried.

Does Islington deal with the neighbour when a Clerkenwell breast sits on a party wall?

No. Islington Council says it has no part in preparing, reviewing or monitoring a Party Wall Agreement. Where the breast is built into a wall shared with the next flat or building, you serve notice on that owner as building owner, and a disagreement goes to surveyors rather than the council. Building control looks only at whether the support meets the regulations. We plan the removal date around the party wall process.

Same Service, Nearby Areas

Chimney Breast Removal Near Clerkenwell

We carry out chimney breast removal across Clerkenwell and the surrounding areas. Explore a nearby location:

Ready to Start Your Clerkenwell Project?

Free, no-obligation quote for chimney breast removal in Clerkenwell.

We use these details only to respond to your enquiry. See our privacy policy.

Free, no-obligation quote. We reply within 24 hours. Or call 07472 424 226.

Call 07472 424 226Free quote