Open-Plan Conversions Clerkenwell

Open-plan kitchen, diner and living conversions in Clerkenwell, steel, floors, heating and finishes as one job.

GS Renovation creates open-plan spaces across Clerkenwell, working in its post-war and new-build apartments and its loft-style warehouse conversions. We handle knock-throughs, kitchen-diners, broken-plan layouts and Crittall-style dividers, opening these homes up without compromising the structure that holds them together.

In Clerkenwell, a knock-through finished as one room typically costs £3,000 to £8,000 or more, including the steel beam (indicative London ranges, MyBuilder and Checkatrade, 2026). GS Renovation Ltd, a building contractor based in Potters Bar, does the work in Clerkenwell: the structural engineer we appoint designs the steel, we install it, and building control signs it off.

Price guide

WorkIndicative London range
Open-plan conversion, steel beam and finishing£3,000 to £8,000+

Indicative London ranges (MyBuilder and Checkatrade, 2026), not a quotation. Prices checked September 2026. Full breakdown: Open-Plan Kitchen-Diner Ideas.

How the job runs

  1. Free site survey at your Clerkenwell address, covering the walls, services and floor levels, and an itemised quote.
  2. The engineer we appoint sizes the beam, and the work is registered with Islington Council building control or an approved inspector. On a shared wall you serve the party wall notice as building owner; we supply the drawings.
  3. Props in, opening cut, beam on padstones; then floors, heating and electrics are joined up.
  4. Building control inspects the steel before it is covered. We finish the room, and the completion certificate follows.
A steel beam spanning a stripped-out ground floor on a GS Renovation structural alteration
The beam threaded under the existing joists and packed, with the original floor structure left visible.

Open-plan living in Clerkenwell conversions

Clerkenwell's warehouse conversions already lean towards open volumes, so the work there is often about removing one remaining wall to link a kitchen and living area. In the post-war blocks and new-build flats that make up most of EC1, it is more often about reordering a compact layout around a fixed structure. Many of these dividers are non-structural partitions that come out easily; others are load-bearing and need a steel beam sized by an engineer, on padstones, with propping during a staged demolition.

Broken-plan is popular here because it keeps the loft feel while defining zones: a Crittall-style glazed screen between kitchen and lounge, or a half-height divider that preserves light across the whole floor. We design the layout around whatever is structural, so you get the open sightlines the space wants without hiding a beam where it looks awkward or losing the character of the conversion.

Housing in Clerkenwell

About 7,790 homes are listed for Clerkenwell, and the mix is 4% houses to 96% flats, with 65% built after 1945, 6% in 1919 to 1939 and 26% earlier. Since most homes here are flats, opening up a flat in Clerkenwell changes its fire escape route, which building control checks.

When a Clerkenwell open-plan scheme reaches the windows

Removing walls inside a Clerkenwell flat is a building control and lease matter, not a planning one. The planning question arrives when the new layout wants the outside to change as well, such as a window turned into a door onto a terrace or a new opening in the rear wall. Islington Council states that there are currently 42 conservation areas in the borough, among them the Clerkenwell Green conservation area (CA1), and it has removed permitted development rights in 40 of them with an article 4 direction to prevent some minor alterations.

In those areas you may need planning permission for changing external doors and windows. For a flat the position is firmer still, because flats have no householder permitted development rights, so a new or altered external opening in a Clerkenwell flat that changes its appearance is a planning matter wherever the building sits. We draw the internal and external work as one scheme but apply for them separately, so the knock-through can go ahead under building control while the change to the elevation is decided.

Consents for open-plan work in EC1

Since Clerkenwell flats are leasehold, an open-plan conversion that removes a structural wall needs the freeholder's licence to alter and the managing agent's approval of the engineer's scheme. Building-management rules on working hours, protection of shared parts and sound insulation between flats all shape how a knock-through is sequenced, and we settle those before starting so the job runs without hold-ups.

Any structural element, the beam and its bearings, is controlled under the Building Regulations and inspected by Islington Council's building control, not the planning department. Non-structural partitions and Crittall dividers carry no structural risk but still need doing neatly. Where the new beam bears into a wall shared with a neighbouring flat, the Party Wall Act applies and you serve the notice as building owner, using the drawings we supply.

  • Rooflights and glazed roofs to bring light deep into the plan
  • Flush beam detailing where a downstand would look wrong
  • Making good, plastering and decorating the finished space
Service areaClerkenwell · EC1
Local authorityIslington Council
Part ofNorth London (Inner London)
Typical homesPost-war council blocks and new apartments among loft-style warehouse conversions
Housing stock26% built before 1919, 6% interwar, 65% post-war; 96% flats, 4% terraced, 0% semi-detached or detached
Also covered nearbyAngel, Old Street, Hoxton, Shoreditch and Bloomsbury

VOA Council Tax stock of properties, March 2025, for Clerkenwell. Counts rounded by the VOA.

Why Clerkenwell Homeowners Choose GS Renovation

Clerkenwell clients choose GS Renovation because we design the open-plan layout around the structure, not against it. One team handles the engineer's beam, freeholder licence and building control sign-off, working tidily in an occupied EC1 flat. Our founder's 30+ years on the tools means the result is open, characterful and fully certified.

30+ YearsFounder's experience
Fully Insured5 year guarantee
4.9 / 531 MyBuilder reviews
Building ControlCompliant
Free QuotesNo obligation
Reviews

Rated 4.9 / 5 by our clients

★★★★★ 4.9 average from 31 verified reviews on MyBuilder

★★★★★
George always kept to commitments and arrived on time. He offered helpful suggestions during his initial visit and promptly provided a reasonably…
scomtottIslington, London · via MyBuilder
★★★★★
Saaid is the best craftsman I have worked with. He knows what he is doing from the very beginning. He has a great knowledge of construction…
volkan50816Stoke Newington, London · via MyBuilder
★★★★★
It's the second time I have hired George and he has been absolutely professional and the work he did resembles perfectly what I had in mind. Being an…
ariabuffadesignerHornsey, London · via MyBuilder
Read all 31 reviews

FAQ

Frequently Asked Questions about Open-Plan Conversions Clerkenwell

Which parts of an open-plan conversion project in Clerkenwell cost the most?

Labour and the making good usually cost the most on an open-plan conversion project in Clerkenwell, within £3,000 to £8,000 or more (indicative). The days on site at EC1 depend on access, condition and how many trades must follow each other: the heating is resized before the space is decorated. GS Renovation sequences them to avoid idle time, which is the practical way to control cost.

Can I go open-plan in my Clerkenwell warehouse flat without losing its character?

Usually yes. Many walls in these conversions are non-structural partitions that remove easily, and where one is load-bearing we insert a sized steel beam. Broken-plan touches such as a Crittall glazed screen keep the loft feel while zoning the space. We handle the freeholder's licence and Islington building control sign-off throughout.

Does going open-plan in a Clerkenwell flat change the fire escape arrangements?

It usually does, and building control has to agree the answer. Removing the walls around a flat's hall can put the kitchen between the bedrooms and the front door, and Part B treats that as a change to the escape route needing a fire strategy. Options range from keeping a protected lobby to rearranging the layout, so the strategy is fixed before joinery or steel is ordered.

Will the floors match once a wall comes out in my Clerkenwell conversion?

Rarely without work. Where the wall stood there is a strip with no floor finish, and rooms on each side may have been laid at different heights or in different materials during the original conversion. Old workshop boards may be irreplaceable, so salvaged timber is sourced or a threshold detail accepted. Settle the answer before plasterers arrive, as screeds and levels come first.

In what order does the steel go in during a Clerkenwell open-plan job?

Freeholder's licence and building control approval first, then props go up and the wall is taken down in sections. The beam is lifted, packed onto padstones and inspected before it is fire protected or boxed. Only after that do services get rerouted and plastering begin. Lift bookings and common-parts protection run alongside each step.

What happens to the sockets and pipes inside a Clerkenwell wall being removed?

They move before the wall does. Cables and pipes are isolated, traced and rerouted through the ceiling or floor, which is why the electrician and plumber visit early. Radiators on that wall need new positions, and any new circuit is notifiable under Part P. First fix of the new routes happens after steel and before plaster, so nothing finished is cut open.

Is Islington's written pre-application advice useful before opening up a Clerkenwell flat?

Only where the scheme changes the outside. Islington offers householder pre-application written advice for a single house or flat, and it is a way to test a new terrace door or a widened window before a full application is drawn. The internal walls do not need it, since removing them is not a planning matter unless the building is listed. We prepare the elevation drawings the officer needs to give a view.

Does a knock-through in a Clerkenwell block built after 2000 still need building control?

Yes. 33% of Clerkenwell homes were built in 2000 or later, and a recent block is covered by the same regulations as an old one. Removing a structural wall needs the beam approved. Removing the walls around an entrance hall also changes how the flat is escaped from in a fire, and that is assessed in the same application. We raise the escape route with the structural engineer we appoint at the start, so the layout is not redrawn later.

How long does Islington take to check plans for an open-plan Clerkenwell flat?

Up to five weeks, or two months if agreed. Islington Council has a statutory obligation to process full plans applications within that period. The engineer's calculations and drawings go in complete, because a query from the plan checker costs time. We use the period to secure the freeholder's consent and to book the steel delivery for the week after approval, so the site is not left waiting once the decision arrives.

Ready to Start Your Clerkenwell Project?

Free, no-obligation quote for open-plan conversion in Clerkenwell.

We use these details only to respond to your enquiry. See our privacy policy.

Free, no-obligation quote. We reply within 24 hours. Or call 07472 424 226.

Call 07472 424 226Free quote