Open-Plan Conversions Hammersmith and Fulham
Open-plan kitchen, diner and living conversions in Hammersmith and Fulham, steel, floors, heating and finishes as one job.
- Rated 4.9 from 31 reviews on MyBuilder
- London guide: £3,000 to £8,000+
- Free site survey, itemised quote
GS Renovation creates open-plan spaces throughout Hammersmith and Fulham, turning the compartmented rooms of bay-fronted terraces into flowing kitchen-diners and knock-throughs. We open up period homes near Bishops Park and Westfield London with engineer-sized steel, keeping every opening properly supported.
In Hammersmith and Fulham, a knock-through finished as one room typically costs £3,000 to £8,000 or more, including the steel beam (indicative London ranges, MyBuilder and Checkatrade, 2026). GS Renovation Ltd, a building contractor based in Potters Bar, does the work in Hammersmith and Fulham: the structural engineer we appoint designs the steel, we install it, and building control signs it off.
Price guide
| Work | Indicative London range |
|---|---|
| Open-plan conversion, steel beam and finishing | £3,000 to £8,000+ |
Indicative London ranges (MyBuilder and Checkatrade, 2026), not a quotation. Prices checked September 2026. Full breakdown: Open-Plan Kitchen-Diner Ideas.
How the job runs
- Free site survey at your Hammersmith and Fulham address, covering the walls, services and floor levels, and an itemised quote.
- The engineer we appoint sizes the beam, and the work is registered with Hammersmith and Fulham Council building control or an approved inspector. On a shared wall you serve the party wall notice as building owner; we supply the drawings.
- Props in, opening cut, beam on padstones; then floors, heating and electrics are joined up.
- Building control inspects the steel before it is covered. We finish the room, and the completion certificate follows.

Open-plan living in Hammersmith and Fulham terraces
The borough's Victorian and Edwardian terraces were designed as separate front and rear reception rooms, with a closet wing and side return behind, so opening them up means removing structure rather than a stud partition. A double-reception knock-through, or joining the kitchen to the rear room across a side-return infill, both rely on the same principle: a steel beam picks up the load before the wall comes down.
The engineer we appoint sizes the beam for the span, and we set it on padstones at each end. For a broken-plan feel, popular in these Fulham and Parsons Green homes, we can retain a section of wall or introduce a Crittall-style glazed divider that keeps light flowing while giving cooking and living areas some separation. Every option is designed around what the house can carry.
Housing in Hammersmith and Fulham
Hammersmith and Fulham counts roughly 95,080 homes for Council Tax; 56% are older than 1919, 9% interwar and 34% post-war, with 77% flats and 23% houses. Since most homes here are flats, opening up a flat in Hammersmith and Fulham changes its fire escape route, which building control checks.
Open-plan flats in Hammersmith and Fulham and the escape route
77% of homes in Hammersmith and Fulham are flats, so an open-plan scheme here is more often a flat than a house, and in a flat the kitchen is the likeliest place for a fire to start. Take out the wall between the kitchen and the entrance hall, and the route from the bedrooms to the front door can end up running past the hob. The answer might be a protected hall kept as a lobby, a sprinkler or mist system designed to the relevant standard, or a second way out. Whichever it is, it has to be settled before the wall goes, because it moves the steel and the new partitions.
Full Plans is the route that settles it on paper. Hammersmith and Fulham Council aims to give a decision within 5 weeks, though it may take longer, and the approved drawings record the fire strategy next to the beam design. That record matters later. Detector positions, fire doors and any sprinkler heads are part of what was approved, so a buyer's surveyor can check the built flat against the agreed layout. It also means the wall does not come down until the escape question has an answer, which is the order the job needs.
Party wall and building control in SW6
Because a knock-through beam usually bears into the party wall shared with next door, the work is notifiable under the Party Wall Act, and you serve notice on the neighbour before starting. This is standard on the terraced streets around Fulham Broadway and Shepherd's Bush, where each house adjoins its neighbours and the load must land on a shared wall.
An open-plan conversion is governed by the Building Regulations, so Hammersmith and Fulham Council's building control signs off the beam, its bearings and the ventilation and fire requirements of the new layout, not the planning department. Planning is a question only for external changes, which a conservation area controls more tightly; a listed home needs listed building consent for internal work too. We coordinate the engineer, the steel and the sign-off from start to finish.
Fire and escape in an open-plan layout
Opening a W6 terrace into one space affects more than the structure. The building regulations expect a protected route out of the house, and in a traditional terrace that route is the hall and stair with doors closing onto it. Take the wall between the hall and the reception away, or open the kitchen into the stairwell, and that protection is gone, which building control will pick up at plan stage rather than at completion.
There are workable answers and we agree them with the inspector early. Interlinked mains-powered smoke and heat detection through the house is the usual starting point, sometimes with a fire door at a different position, an escape window to a habitable room, or in larger properties a sprinkler system. The right combination depends on the number of storeys. It costs far less to design in at the start than to retrofit after the plaster is on.
- Level flooring and threshold removal across the whole space
- Making good, plastering and decorating the finished space
- Rooflights and glazed roofs to bring light deep into the plan
VOA Council Tax stock of properties, March 2025, for all 25 statistical areas in Hammersmith and Fulham. Counts rounded by the VOA.
Why Hammersmith and Fulham Homeowners Choose GS Renovation
For open-plan conversions in Hammersmith and Fulham, GS Renovation gives you one accountable team from first drawing to final certificate. We coordinate the structural engineer, install the steel to their design and see building control through to sign-off, and we keep your occupied W6 or SW6 home clean and protected throughout, all backed by our founder's 30+ years of structural experience.
George always kept to commitments and arrived on time. He offered helpful suggestions during his initial visit and promptly provided a reasonably…
It's the second time I have hired George and he has been absolutely professional and the work he did resembles perfectly what I had in mind. Being an…
Saaid is the best craftsman I have worked with. He knows what he is doing from the very beginning. He has a great knowledge of construction…
FAQ
Frequently Asked Questions about Open-Plan Conversions Hammersmith and Fulham
Does the cost of open-plan conversion rise in a late Victorian or Edwardian Hammersmith and Fulham property?
Age affects the cost of open-plan conversion in Hammersmith and Fulham less than people fear; the structural part is broadly similar, within £3,000 to £8,000 or more (indicative). What differs in late Victorian or Edwardian housing is making good cornice, floors and plaster around the W6 works, priced as separate lines. The sequence also holds: the heating is resized before the space is decorated.
Can I knock my two reception rooms into one in a Fulham terrace?
Yes, and it is one of our most common jobs here. The dividing wall is usually load-bearing, so a structural engineer sizes a steel beam to replace it, seated on padstones. Because the beam bears into the shared party wall, you serve Party Wall Act notice on your neighbour, and Hammersmith and Fulham building control signs off the finished opening.
Should a Fulham terrace open up the kitchen or the two reception rooms?
It depends on how you live. Joining the kitchen to the back reception makes a kitchen-diner, where cooking and eating share one room with extraction and heating to match. Joining the front and back receptions makes a through-lounge, which is quieter and keeps the kitchen separate. Both need steel sized by the engineer; the kitchen route often also involves the drainage.
Can the beam line up with the original cornice in a Hammersmith knock-through?
Sometimes, if it is set as a downstand at cornice level. Period rooms often have cornice where wall meets ceiling, and a beam cuts across it. A downstand can be boxed and finished with matching cornice so it looks deliberate. A flush beam keeps the ceiling flat but means cutting joists and breaking the plaster, so this is decided early.
Does opening up a Hammersmith and Fulham flat need the freeholder's approval?
Yes, under most leases, before structural work starts. Building control also needs a fire strategy, because opening the hallway into the living area changes the escape route. With flats making up 77% of borough dwellings (VOA), this is the usual route. Get the lease consent first, then the fire strategy and the steel design together.
How is heating adjusted for a new open-plan room in Fulham?
Radiators are resized for the combined volume, since two small rooms joined make one large one that loses heat differently. A kitchen-diner also needs extraction ducted outside under Part F. Underfloor heating is an option if floors are being relaid, but the build-up must suit whether the floor is timber or solid.
Does an interwar flat in Hammersmith and Fulham open up differently from a Victorian one?
Often it does. 9% of the borough's homes were built between 1919 and 1939, and flats of that era can have concrete floors or steel filler joists where a Victorian conversion has timber. A concrete floor spreads load differently, so the wall under it may be carrying less than it appears, or more. The structural engineer we appoint asks for any original drawings the freeholder holds, and a small opening confirms the floor before any steel is designed.
What can happen while a Hammersmith and Fulham Full Plans application is being decided?
The preparation that does not touch structure. The council aims for a decision within 5 weeks, though it may take longer. That period suits investigation holes to confirm joist direction, stripping out old kitchen units, and ordering items with long lead times once the drawings are settled. Taking the wall out before the decision risks building to a design that building control then asks to change, which is the costliest way to find out.
Why does the completion certificate matter for an open-plan Hammersmith and Fulham flat?
Because the council says you will need it when you come to sell your property. Once plastered, a removed wall and a new fire strategy are invisible, and the certificate is the proof they were inspected. The completion inspection needs 5 days' notice rather than the usual one day, so we book it before the decorators finish rather than after. Keep the certificate with the approved drawings and the freeholder's licence.
Every Service, One Team
More GS Renovation Services in Hammersmith and Fulham
One team for every GS Renovation service in Hammersmith and Fulham:
Same Service, Nearby Areas
Open-Plan Conversions Near Hammersmith and Fulham
We carry out open-plan conversion across Hammersmith and Fulham and the surrounding areas. Explore a nearby location:
Ready to Start Your Hammersmith and Fulham Project?
Free, no-obligation quote for open-plan conversion in Hammersmith and Fulham.