Flat Refurbishment Balham
Flat refurbishments in Balham, your flat renewed within the lease, the licence and the rules of the block.
- Rated 4.9 from 31 reviews on MyBuilder
- UK guide: £33,000 to £48,000
- Free site survey, itemised quote
Flat refurbishment in Balham means renewing a home inside a building you share. The VOA count for Balham and Nightingale Lane, a slightly wider area, puts 55% of homes there as flats, many of them in Victorian terraces and period conversions. The job may be a floor of a converted terrace or a flat in a newer purpose-built block; 9% of homes in that area were built in 2000 or later. The lease, the managing agent and the neighbours below set the rules before any wiring, kitchen or floor is renewed.
For Balham, published UK averages put a full flat refurbishment at £33,000 to £48,000 and a basic one, with budget kitchen and bathroom fittings, at £15,000 to £18,000, and London flats usually cost more (Checkatrade and MyJobQuote, 2026). GS Renovation Ltd, a building contractor based in Potters Bar, does the work in Balham: we refurbish the flat within the terms of your lease and licence to alter, protect the common parts throughout, and a registered electrician certifies the new consumer unit and circuits.
Price guide
| Work | Indicative range |
|---|---|
| Flat, full refurbishment | £33,000 to £48,000 |
| Flat, basic refurbishment | £15,000 to £18,000 |
| Full rewire, one-bed flat | from £3,900 |
| Consumer unit replacement | £350 to £750 |
| Sound insulation under a new floor | £45 to £160 per square metre |
Indicative ranges from published cost guides (Checkatrade and MyJobQuote, 2026), not a quotation. Most are UK-wide figures and London work usually costs more; a row marked London is a London figure. Prices checked September 2026.
Quick estimate from UK guide figures
Guide range: choose above

Refurbishing a Balham flat inside a lease
Refurbishing a flat in Balham starts with the lease, not the tools. A lease will often ask for the freeholder's or managing agent's licence to alter before rewiring, moving a kitchen or changing a floor finish, and many set working hours and rules for using the common parts. Leases differ, from outright bans on some alterations to consent that cannot be unreasonably withheld, and the licence can add weeks before a start date if it is left until the last moment.
Floors are the usual sticking point. A lease often requires carpet or an acoustic underlay over timber boards, because hard floors carry footfall into the flat below. We fit the build up the licence specifies, protect the common stairs and hallway, and keep noisy work to the agreed hours. Send us the licence conditions early and we write them into the programme, which keeps the neighbours and the managing agent on side.
Housing in Balham
Balham has about 7,240 homes on the Council Tax list: 68% pre-1919, 8% interwar and 24% post-war, with flats making up 55% and houses 45%.
Converted Balham terraces versus purpose-built blocks
A flat in a converted Balham terrace and a flat in a newer block are refurbished differently. In a period conversion the floor between you and the flat below is usually old joists and a lath and plaster ceiling, the pipes may run through the neighbour's space, and the stair is shared and narrow. Materials go up by hand, so kitchen units and boards are ordered in sizes that turn the landing. Leaks are the risk to plan for, so wet work is tested before floors close.
In a newer purpose-built block, concrete floors carry less footfall noise to the flat below, but the fire strategy matters more. The flat entrance door and compartment walls belong to the block's fire strategy, which the freeholder or responsible person controls. Do not change the door or cut through a compartment wall without their consent. We book the lift, protect it, and keep to the managing agent's delivery windows, so the other residents know when the lift is out of use.
Letting a Balham flat under the energy rating rules
A landlord refurbishing a Balham flat has to leave it lettable under the energy rules. GOV.UK says that since 1 April 2018 private landlords may not let domestic properties on new tenancies if the EPC rating is F or G. Since 1 April 2020 the bar below E has applied to continuing lets too, unless a valid exemption applies. Local authorities enforce the regulations, so a failed rating is a live risk rather than a paperwork point.
In a flat the options are narrower than in a house, since the roof and outside walls usually belong to the freeholder. The measures inside the flat are heating controls, an efficient boiler or electric heating, low energy lighting, and secondary glazing where the lease allows. Ask the assessor before the work is specified which measures count most, then we programme those first and you have the new EPC assessed once we finish.
Selective licensing for rented flats in South Balham
A rented flat in South Balham needs a property licence as well as a decent rating. Wandsworth's licensing scheme covers all privately rented properties in South Balham, Furzedown, Tooting Bec and Tooting Broadway, as well as every HMO across the borough. Check Wandsworth's licence map for the exact boundary, because a flat a street away may fall outside it. The landlord or their agent applies; the licence conditions then set standards for the flat's condition and safety.
Where a Balham house was converted into flats, the licence is per flat. Wandsworth says a converted block inside a selective licensing designation needs a selective licence for each individual flat, unless otherwise exempt. So a landlord refurbishing between tenancies should read the conditions before the scope is fixed. We carry out the refurbishment so the flat meets them, and hand over the electrical and gas certificates the agent will need.
- Managing agent liaison on working hours, access and the common parts
- Flat entrance door replaced as a certified fire door set, with the freeholder's written agreement
- Leak repairs, and making good after water has reached the flat below
VOA Council Tax stock of properties, March 2025, for Balham and Nightingale Lane. Counts rounded by the VOA.
The GS Renovation Difference in Balham
You get a builder used to working inside shared buildings: we send the managing agent our programme and contact details before we arrive, protect the common parts, and keep noisy work to the permitted hours. Inside the flat we run strip out, services, kitchen and bathroom and decoration as one sequence, test the plumbing before floors close so nothing reaches the flat below, and hand over the certificates and a tidy stair.
- The lease and licence to alter read before a flat is quoted
- Common parts protected, photographed and handed back as we found them
- Rated 4.9 from 31 reviews on MyBuilder
George always kept to commitments and arrived on time. He offered helpful suggestions during his initial visit and promptly provided a reasonably…
We loved working with George and Ibrahim and would highly recommend them. They have done splendid job on our new kitchen refurb which including new…
George was brilliant. Lovely bloke, very reasonably priced and a perfectionist to boot. He completed our small kitchen renovation with care and great…
FAQ
Frequently Asked Questions about Flat Refurbishment Balham
What should I budget to refurbish a flat in Balham?
Use the UK range of £33,000 to £48,000 for a full refurbishment (Checkatrade and MyJobQuote, 2026) as a floor, and add for London prices and for what the block requires. The licence to alter is between you and your freeholder, so any fee they charge sits outside the building quote. The Balham survey fixes the scope, and each trade is priced as its own line.
Do you need the freeholder's permission to refurbish a Balham flat?
Usually, for anything beyond decoration. Many leases require a licence to alter before rewiring, moving a kitchen or bathroom, or changing floor finishes. Ask your managing agent for the lease clauses and the block rules at the start, and we build their conditions, hours and floor specification into the programme.
Can a landlord in Balham let a flat with an F rated EPC?
No, unless an exemption applies. GOV.UK says private landlords may not let domestic properties on new tenancies with an EPC rating of F or G since 1 April 2018, and since 1 April 2020 cannot continue to let below E either. A refurbishment is a good moment to lift the rating before re-letting.
Does a rented flat in South Balham need a licence?
Yes, unless it is exempt. Wandsworth's licensing scheme covers all privately rented properties in South Balham, Furzedown, Tooting Bec and Tooting Broadway, as well as all HMOs across the borough. The landlord or their agent applies. We carry out the refurbishment works so the flat meets the conditions set out in the licence.
What happens if a Balham landlord ignores the energy rating rules?
Local authorities enforce the MEES Regulations and can fine a landlord, with a cap per property set in the GOV.UK guidance. Letting below the required rating without a valid exemption is the breach. Lifting the rating during a refurbishment, while floors and walls are open, is simpler than returning to an occupied flat later.
Can you change the windows of a Balham flat?
Only with planning permission if the change alters how the building looks. Wandsworth's conservation area FAQ says permitted development rights do not apply to flats or houses converted to flats, so any external change to them needs planning permission. Flats have no householder permitted development rights anywhere, so your designer checks the proposal first. Repairing the existing windows avoids the question, and secondary glazing inside the flat is the usual alternative.
How do you handle a flat refurbishment in a shared building?
By working to the freeholder's licence to alter and the house rules from the start. We protect the common parts, keep noisy work to the permitted hours and fit the floor build up the lease asks for. The managing agent gets our programme and contact details before we arrive, so neighbours know what to expect.
How do you stop leaks into the flat below during the work?
By isolating the water before strip out, pressure testing the new pipework before the floor goes back, and tanking the shower area before tiling. Waste pipes are checked for fall and joints before boxing in. If the flat below has a history of leaks, we look at the ceiling with the neighbour first.
When can building work start on a Balham flat under a building notice?
Wandsworth says you can start on site 48 hours after a building notice is submitted, provided the correct fee has been paid. Work inside a flat that needs building control, such as new drainage for a moved bathroom, can often be notified this way. In a higher-risk building under the Building Safety Act, the Building Safety Regulator is building control and a building notice cannot be used, although work under a competent person scheme needs no Regulator approval. Otherwise Wandsworth issues a completion certificate after a satisfactory final inspection.
Every Service, One Team
More GS Renovation Services in Balham
One team for every GS Renovation service in Balham:
Same Service, Nearby Areas
Flat Refurbishment Near Balham
We carry out flat refurbishment across Balham and the surrounding areas. Explore a nearby location:
Ready to Start Your Balham Project?
Free, no-obligation quote for flat refurbishment in Balham.