Commercial Fit-Out New Malden

Shop, cafe, restaurant, salon and clinic fit-outs in New Malden, shopfront to counter under one contract, built around your opening date.

Commercial fit-out in New Malden means the shops, cafes, restaurants, salons and clinics along the High Street and the parades near the station. Kingston's Core Strategy names New Malden, Surbiton and Tolworth as the borough's three District Centres, so the High Street is where the council plans for trading uses to stay. We fit out customer-facing units at that scale: strip-out, shopfront, counters, floors, lighting, toilets and services, built to the use the unit is allowed and finished ready to open.

For New Malden, published UK guides put refurbishing a retail space at £1,500 to £3,000 per m² and a restaurant or cafe at £2,000 to £4,500 per m², and London units usually cost more (MyBuilder, 2026). GS Renovation Ltd, a building contractor based in Potters Bar, does the work in New Malden: our own trades do the strip-out, back of house, counter fitting and finishes, and we coordinate the shopfront, extraction, electrical and fire specialists the unit needs.

Price guide

WorkIndicative range
Retail space refurbishment£1,500 to £3,000 per m²
Restaurant or cafe refurbishment£2,000 to £4,500 per m²
Shop fitting only: counters, display and fixtures, 2024 guide£60 to £140 per sq ft
Aluminium shopfront, single bay up to about 4m wide£2,000 to £5,000
Cafe kitchen extraction with basic odour control£5,000 to £12,000

Indicative ranges from published cost guides (MyBuilder, Checkatrade, Urban Shopfronts and Fan Rescue, 2026), not a quotation. Most are UK-wide figures and London work usually costs more; a row marked London is a London figure. Prices checked September 2026.

Quick estimate from UK guide figures

Guide range: choose above

Pendants hung low over a counter mark it out from the rest of the room, illustrating commercial fit-out in New Malden.
Pendants hung low over a counter mark it out from the rest of the room.

What a District Centre means for a New Malden shop unit

New Malden is one of Kingston's three District Centres, supported by 25 Local Centres across the borough. The London Plan places District centres in its town centre network, below the Major and Metropolitan centres. For a fit-out the role matters when planning is involved. Moving between uses inside Class E, such as shop to cafe, clinic or gym studio, needs no planning permission for the use unless a condition restricts it. A hot-food takeaway, pub or bar is sui generis and needs planning permission.

Units on the High Street and near New Malden station vary in size and age, and the fit-out has to work inside what the building gives you. Ceiling heights, the rear yard for bins and plant, and whether the flat above shares a staircase all shape the plan. If you lease the unit, the landlord's licence for alterations comes before the strip-out. We survey those constraints first, so the layout your designer draws is one that can be built and serviced in the space.

Shopfronts and signs on a New Malden parade

A new shopfront in New Malden is an external alteration, and a material change to it needs planning permission; illuminated or projecting signs usually need advertisement consent as well. Where the unit sits in a conservation area, Kingston says an external alteration needs the council's approval, so the design of the frontage, fascia and stall riser is settled before joinery is ordered. If the building is listed, listed building consent covers works inside as well as out. The owner or their designer makes those applications, and we build to the approved drawings.

On a New Malden parade the shopfront often sits right on the pavement edge, and in Kingston a licence is needed to put up a hoarding or protective fence even on private property next to the highway. A hoarding for a shopfront replacement or a new fascia therefore needs that licence before it goes up. We allow for it in the programme so the old front does not come out before the hoarding is legally in place, and the unit stays secure overnight.

Kitchens, extraction and toilets in a New Malden cafe or restaurant

Food units in New Malden bring the heaviest services work of any fit-out. A commercial kitchen needs extraction and odour control that the planning consent may control, often with a duct taken up the rear wall past the flats above. Drainage from sinks and dishwashers needs a grease trap or separator where food is prepared. We fix the route of the extract duct and the drainage runs on survey, because they decide where the kitchen can go inside the unit.

Part M applies to the parts you alter and must not leave access worse than before. Where new customer toilets are provided or the entrance is reworked, they are built to Approved Document M, designed in from the start rather than squeezed in at the end. Fire detection, emergency lighting and escape routes follow Part B, and the unit's full plans application sets them out for Kingston's building control team. Counters, display and service areas, floors that stand up to trading and cleaning, and lighting for the counter and the window then complete the New Malden unit.

Fitting out a New Malden unit around trading neighbours

Deliveries on a busy New Malden High Street need planning. Kingston charges parking suspensions by the day for each five-metre space, so we book bays for the days when counters, shopfitting joinery or kitchen equipment arrive and keep other deliveries to small vans. Noisy strip-out is best done early in the programme, and we agree the hours with the landlord and neighbouring traders so their business carries on while yours is built.

Flats above a parade normally stay lived in while the shop below is fitted out. Residents need a clear, safe route out at all times, and the fire separation between the shop and the homes above must stay in place, or be temporarily protected, whenever the ceiling is opened. As a commercial client you have duties under the CDM Regulations too, and we explain them at the start. The landlord's consent, the planning use and the programme are settled before the first day on site in New Malden.

  • Clinic and treatment room fit-outs with basins in each room
  • Service counters, display walls and shelving
  • Grease traps and kitchen drainage where food is served
Service areaNew Malden · KT3
Local authorityKingston Council
Part ofSouth West London (Outer London)
Typical homes1930s semis and Victorian houses near the station
Housing stock33% built before 1919, 33% interwar, 34% post-war; 31% flats, 27% terraced, 40% semi-detached or detached
Also covered nearbySurbiton, Wimbledon, Morden and Kingston upon Thames

VOA Council Tax stock of properties, March 2025, for New Malden East and New Malden West. Counts rounded by the VOA.

Why Choose GS Renovation in New Malden

A shop or cafe only earns once it opens, so the fit-out has to hold a date. We survey the unit, give a written quotation and a written programme that shows when each trade and inspection falls, and keep one site manager as the contact for the landlord's surveyor, neighbouring traders and the building control officer. Extraction, electrics and gas work are carried out and certified by registered trades within the programme, and you get every certificate at handover.

  • Kitchen extraction and grease trap coordinated with their specialists
  • Building control applications and inspections coordinated for you
  • Step-free entrance and accessible WC planned from the first drawing
30+ YearsFounder's experience
Fully Insured5 year guarantee
4.9 / 531 MyBuilder reviews
Building ControlCompliant
Free QuotesNo obligation
Reviews

Rated 4.9 / 5 by our clients

★★★★★ 4.9 average from 31 verified reviews on MyBuilder

★★★★★
George was brilliant. Lovely bloke, very reasonably priced and a perfectionist to boot. He completed our small kitchen renovation with care and great…
OscarCrofton Park, London · via MyBuilder
★★★★★
George always kept to commitments and arrived on time. He offered helpful suggestions during his initial visit and promptly provided a reasonably…
scomtottIslington, London · via MyBuilder
★★★★★
Saaid is the best craftsman I have worked with. He knows what he is doing from the very beginning. He has a great knowledge of construction…
volkan50816Stoke Newington, London · via MyBuilder
Read all 31 reviews

FAQ

Frequently Asked Questions about Commercial Fit-Out New Malden

How much does a shop or cafe fit-out cost in New Malden?

Published UK guides put refurbishing a retail space at £1,500 to £3,000 per square metre and a restaurant or cafe at £2,000 to £4,500 per square metre (MyBuilder, 2026), and London units usually cost more. For a New Malden unit the biggest variables are the kitchen and extraction, the shopfront, the electrical supply and accessible WC work. The quote after the survey itemises each of them.

Is New Malden High Street a town centre in Kingston's plan?

Yes. Kingston's Core Strategy names New Malden, Surbiton and Tolworth as the borough's three District Centres, supported by 25 Local Centres. That status supports keeping shops and services on the High Street, which is useful context for any change of use connected with a fit-out.

Can a New Malden shop become a cafe without planning permission?

Usually yes, if both uses are in Class E and no planning condition restricts the unit. Shops, cafes, restaurants, clinics and gyms all sit in Class E. A hot-food takeaway, pub or bar is sui generis and needs planning permission. Check the unit's planning history before signing the lease.

Does a hoarding outside a New Malden shop need a licence?

Yes. Kingston says a licence is needed for a hoarding or protective fence even on private property next to the highway. That covers shopfront work on a parade, where the hoarding stands at the back of the pavement while the old front comes out and the new one goes in.

Does a new shopfront in a conservation area need approval in Kingston?

Yes. In Kingston's conservation areas an external alteration needs the council's approval, and a shopfront is an external alteration. The owner or their designer settles the design and the consent, and we order the frontage joinery only once the approved drawings are in hand, so nothing is made twice.

What does a restaurant fit-out in New Malden need for extraction?

A commercial kitchen needs an extract system with odour control, and its duct route and any external flue are often controlled by the planning consent. The route runs past the flats above on a parade, so it is fixed on survey. Grease traps on the drainage are fitted where food is prepared.

Can deliveries park outside a New Malden shop during the fit-out?

Only with a parking suspension where bays are controlled. Kingston charges suspensions by the day for each five-metre space, so we book them for the heavy deliveries such as counters, joinery and kitchen equipment. Smaller deliveries come in vans at quieter times of the trading day.

Does a New Malden shop fit-out need building control approval?

Where it alters escape routes, toilets, drainage or structure, yes. Kingston offers full plans and building notice routes at the same cost, but premises covered by fire safety legislation go through full plans. The fee for non-domestic work is banded by the cost of the works.

Can the flats above a shop stay occupied during a fit-out?

Usually yes, with careful sequencing. The residents need a safe route out at all times, and the fire separation between the unit and the homes above must be kept or temporarily protected whenever it is opened up. We agree loud hours with the landlord and give residents notice of the noisy days.

Same Service, Nearby Areas

Commercial Fit-Out Near New Malden

We carry out commercial fit-out across New Malden and the surrounding areas. Explore a nearby location:

Ready to Start Your New Malden Project?

Free, no-obligation quote for commercial fit-out in New Malden.

We use these details only to respond to your enquiry. See our privacy policy.

Free, no-obligation quote. We reply within 24 hours. Or call 07472 424 226.

Call 07472 424 226Free quote