Renovations in New Malden

Every trade under one contract across New Malden and KT3. Structural work, extensions, kitchens and bathrooms, building control handled for you.

Look along a New Malden street and the rooflines tell you what is available. The 1930s semis spreading out from the High Street and towards Beverley Park were built with cut roofs, purlins carried on struts, and hips that lose a useful amount of volume at the side. Read that structure correctly and a loft becomes a storey rather than a cupboard. GS Renovation carries out those conversions and the rear extensions that usually accompany them across KT3, appointing the structural engineer for the design and taking the building control application through to the completion certificate.

Roof Space In A 1930s Semi

A hipped roof slopes on three sides, which is handsome from the pavement and unhelpful once you are standing inside it, because the usable width is squeezed at the flank. Rebuilding the hip as a gable recovers that width and gives the new floor somewhere sensible to land, and a rear dormer then provides the head height for a stair and a bathroom. A cut roof of this age relies on its purlins and struts for support, and those members frequently pass straight through the space you want, so the sequence of removing them and replacing their function has to be designed before anything is cut.

The new floor spans between loadbearing walls on steels rather than sitting on the existing ceiling joists, which were only ever asked to hold up a ceiling. A structural engineer produces that design and we build to it, propping as they specify. Head height over the new stair is generally what constrains the layout, and a protected escape route with fire doors and interlinked alarms comes with the extra storey under the building regulations. Kingston Council building control inspects the structure and the fire provisions at the defined stages, and we book each visit and meet the inspector rather than leaving that arrangement with you.

Extending Across The Back And What Runs Beneath It

Rear extensions on these houses are more predictable than in older stock. Regular spans, cavity walls and a consistent original plan mean the beam sizes and bearing arrangements tend to come back sensibly from the engineer, and the geometry of the existing rear addition sets most of the design. A new opening in a cavity wall needs the cavity closed and a tray with stop ends above it so water crossing the outer leaf is discharged outwards, and where the extension abuts an original flat roofed addition the junction detailing is what determines whether it stays dry.

Below ground is where the surprises live. The existing drainage run and any inspection chamber in the path of the new foundations have to be located before design, not discovered by an excavator, and building over or near a public sewer brings its own approval process. Surface water from the additional roof area needs somewhere to go, and where the ground allows a soakaway, its position and size are worked out rather than guessed. Building control inspects the open trench before concrete is placed, and we book that visit into the programme so the groundworkers are not left standing about waiting for it.

Every Service, One Team

What We Renovate in New Malden

One accountable team for every trade in New Malden. Choose the work you need:

Nearby

Renovations Near New Malden

FAQ

Renovating in New Malden, common questions

Is my roof suitable for a loft conversion?

Most 1930s New Malden roofs are, and one measurement tells us for certain: the height from the top of the existing ceiling joists to the underside of the ridge. Comfortable height makes a straightforward conversion possible, while marginal height pushes you towards lowering the ceilings below or altering the roof structure, both of which change the scope considerably. A hipped roof also needs a gable conversion before it gives usable width.

Does a hip to gable conversion need planning permission?

Frequently no permission is required, since loft alterations on a house are often covered by permitted development, subject to a cap on the extra roof volume created and to rules about the roof plane facing the highway. That allowance is withdrawn by some local designations, however, and previous owners may already have used part of it up. Kingston Council will confirm both points for your property, and we ask before any designer is engaged.

Where does the waste from a new loft bathroom connect?

Into the existing soil stack, and the route to it is a design question rather than an afterthought. Boxing a new branch down through a bedroom or cupboard is common, and the fall available governs whether gravity drainage works or whether a pumped arrangement is needed. Locating the stack and planning the run at design stage avoids a bathroom position that cannot actually be drained once the floor is in.

Who arranges the building control approval?

We do, as part of the job. We submit the application, register the notifiable work, book each inspection at the defined stage, meet the inspector on site and hand you the completion certificate at the end. On a New Malden loft and extension that typically covers foundations, drainage, structural steel, insulation, fire safety and completion. Keeping those records together matters when the house is sold.

30+ YearsExperience
Fully Insured5 year guarantee
4.9 / 531 MyBuilder reviews
Building ControlCompliant
Free QuotesNo obligation
Reviews

Rated 4.9 / 5 by our clients

★★★★★ 4.9 average from 31 verified reviews on MyBuilder

★★★★★
George was a great find. The job required re-plastering the walls before fitting acrylic panels. He also re-plumbed the shower waste under the solid floor and then re-tiled the bathroom floor. He had to build a timber frame for a new…
andrew_lackEnfield · via MyBuilder
★★★★★
I am very happy to recommend George after he completed the work on my 2 bathrooms. He worked very hard to make sure everything was completed and even came on a Sunday evening to finish the work...which shows how committed he is to…
hit10Enfield · via MyBuilder
★★★★★
My husband and I are extremely pleased with the work. The standard of the work is outstanding and Saiid has a great eye for detail and will not leave a job half-done. He went out of his way to help us select the products that were the best…
jessbeanWoodford Green · via MyBuilder
Read all 31 reviews on MyBuilder

Planning a Renovation in New Malden?

Free, no-obligation quote for any renovation work in New Malden. Rated 4.9 from 31 reviews on MyBuilder, fully insured, and building control handled for you.

Free, no-obligation quote. We reply within 24 hours. Or call 07472 424 226.