Chimney breast removal with steel beam support in Esher, the beam sized by the engineer we appoint and the work signed off by building control.

Taking out a chimney breast removes a load bearing element from the middle of the house, so whatever sits above it has to be supported. That is usually a steel beam on padstones, or gallows brackets only where the engineer and building control accept them, and a structural engineer decides which. We appoint the engineer, build the support, and coordinate the building control inspection in Esher.

For Esher, on London-derived ranges removing a breast on one floor typically costs £2,200 to £3,250 on a steel beam, and £3,000 to £5,000 across two floors; Surrey work generally runs below that. GS Renovation Ltd, a building contractor based in Potters Bar, does the work in Esher.

Price guide

WorkIndicative range
One floor, steel beam (the usual route)£2,200 to £3,250
One floor, gallows brackets where the engineer and building control accept them£1,500 to £2,500
Two floors£3,000 to £5,000

Indicative London ranges (MyBuilder and Checkatrade, 2026), not a quotation. Surrey work generally runs below the London figures; your price follows a site visit. Prices checked September 2026. Full breakdown: Chimney Breast Removal Guide.

How the job runs

  1. Free site survey at your Esher address: which floors the breast runs through, a shared stack, any live flue.
  2. The engineer we appoint designs the support, and the work is registered with Elmbridge Building Control Services or an approved inspector. On a shared wall you serve the party wall notice as building owner; we supply the drawings.
  3. The floor above is propped and the breast comes down in courses from the top; what remains sits on the support the engineer specified.
  4. Building control inspects the support before it is covered. We make good, and the completion certificate follows.
A propped structural opening in a period terrace, carried out by GS Renovation, with the original timber lintel exposed
Acrow props on sole plates carry the floor while the original head is exposed.

Chimney breast removal and planning permission in Esher

Inside the house, chimney breast removal is a building regulations matter rather than a planning one. The Esher Conservation Area Character Appraisal names the removal of redundant chimneystacks as a minor work that does not require planning permission there. Elmbridge's conservation area pages list no Article 4 direction covering Esher, so permitted development rights have not been withdrawn by that route, though you should check the council's current Article 4 list for your address.

The appraisal states that properties in the conservation area which are single family dwellings hold permitted development rights. That matters where the stack above the roof is coming down as well as the breast inside. It does not extend to a listed building, where consent is needed for the internal work too.

Housing in Esher

Esher has around 3,110 homes on the Council Tax list: 60% post-war, 18% interwar and 20% predate 1919, with 26% flats and 74% houses. Detached houses make up 45% of homes here, and a breast in a detached house in Esher needs building control but no party wall notice.

The Esher houses where chimneys are part of the street

Elmbridge records tall chimneys as part of the character of Lower Green Road. Houses fronting that road immediately south of the railway line are described by the council as having a garden suburb quality, with cottage scale, tall chimneys and eaves half-dormers. Wolsey Road is typified by high quality late 19th century two storey dwellings set slightly back from the road on a consistent building line.

Where the stack is part of that view, keeping the stack and removing only the breast below is one option. It is the case that needs support designed and installed, whether a steel beam, or gallows brackets where the engineer and building control accept them. Building control inspects that support before it is plastered over.

Terraces and shared stacks

In a terrace the stack can be shared with the neighbour. Elmbridge records Park Road as closely packed mid to late 19th century houses, with a long terrace of two storey houses on the west side. Where the breast sits on a party wall, the Party Wall etc. Act applies and you serve notice on the neighbour as building owner before work starts, or your surveyor does.

A shared stack also means a neighbour's flue may run through your breast. That is checked at survey, before anything is cut, and the flue is kept serviceable or capped as the engineer and building control require. Nothing is opened up until the answer is known.

Building control for a chimney breast removal

Chimney breast removal is notifiable work and needs a building control application. Building control for Esher is provided by Elmbridge Building Control Services Limited, known as EBCS, and we make the application and arrange the inspections. Gallows brackets are used only where the engineer and the building control surveyor accept the party wall brickwork as sound enough to carry them, and the building control surveyor sees the support before it is covered.

  • Gallows brackets only where the engineer and building control accept them
  • Ventilated caps and airbricks to disused flues
  • Loft inspection of the retained stack before work starts
Service areaEsher · KT10
Local authorityElmbridge Borough Council
Part ofSurrey · about 24 miles from our base
Typical homesPost-war detached houses with substantial Victorian and Edwardian villas
Housing stock20% built before 1919, 18% interwar, 60% post-war; 26% flats, 14% terraced, 57% semi-detached or detached, 3% bungalows
Also covered nearbySurbiton, Weybridge, Teddington, Epsom and New Malden

VOA Council Tax stock of properties, March 2025, for Esher. Counts rounded by the VOA.

The GS Renovation Difference in Esher

Chimney work is as much about what stays as about what goes. We appoint the structural engineer to design the support, a steel beam as the usual route or gallows brackets where building control accepts them, build to that decision, and coordinate the building control inspection of the support before it is hidden. Waste is the other half of the job. A breast over two floors produces a serious volume of brick and soot, so removal, protection of the route out and making good are priced in rather than added later. One point of contact throughout, fully insured, free no obligation quotations.

30+ YearsFounder's experience
Fully Insured5 year guarantee
4.9 / 531 MyBuilder reviews
Building ControlCompliant
Free QuotesNo obligation
Reviews

Rated 4.9 / 5 by our clients

★★★★★ 4.9 average from 31 verified reviews on MyBuilder

★★★★★
We loved working with George and Ibrahim and would highly recommend them. They have done splendid job on our new kitchen refurb which including new…
kath833Wood Green, London · via MyBuilder
★★★★★
George was brilliant. Lovely bloke, very reasonably priced and a perfectionist to boot. He completed our small kitchen renovation with care and great…
OscarCrofton Park, London · via MyBuilder
★★★★★
George always kept to commitments and arrived on time. He offered helpful suggestions during his initial visit and promptly provided a reasonably…
scomtottIslington, London · via MyBuilder
Read all 31 reviews

FAQ

Frequently Asked Questions about Chimney Breast Removal Esher

How do you price chimney breast removal in Esher?

Pricing chimney breast removal for an Esher property starts with a KT10 survey and ends with a written figure inside £2,200 to £3,250 for one floor on a beam (London-derived). The key physical check comes first: what remains of the Esher stack above decides the beam that carries it. The quotation then splits into structure, services and finishes, with Elmbridge Building Control Services approval of the steel carrying the retained stack shown separately.

Once the breast is out, does the flue above still need a vent?

Yes. A capped flue with no airflow collects moisture, and the damp then shows on the brickwork that remains or on the ceiling below. The cap is vented and a vent is left at the bottom of the retained flue so air moves through it. The council's description of the houses fronting Lower Green Road picks out their tall chimneys, so a stack kept for that reason still has to breathe.

How is the roof closed up if the whole stack comes down?

The rafters are trimmed, the opening is framed out, and the covering is made good with matching tiles or slates. Matching is the part to settle early. The Clive Road houses share a palette of brown brick laid in Flemish bond, leaded casement windows and handmade clay roof tiles. The Elmbridge Design Code states that materials and detailing should match the existing building in design, colour and texture. Salvaged tiles are agreed with you first.

There is a gas fire or a boiler flue in the same stack. Does that stop the work?

It changes the sequence rather than stopping the job. Any live appliance and its flue are disconnected and capped by a Gas Safe registered engineer before the breast is touched. Where a boiler flue is lined through the stack, the liner and the appliance are relocated or replaced, and that is designed in before the quotation is fixed. The building control application to EBCS covers the structural support that replaces the breast.

Can the first floor breast come out while the ground floor one stays?

Yes, and it is the simpler version of the job. The section above bears onto the breast that remains, so the load path stops at masonry that is already carrying weight. The engineer still checks that brickwork and what it sits on before designing the support, because a breast built for a fireplace was not built to take a transferred load. EBCS inspects the support before it is plastered over.

The cottage is timber framed. Is chimney breast removal different there?

Yes, because the stack and the timber structure can be tied into one another. Two weatherboarded cottages on Milbourne Lane in Esher date from around 1810, and structure of that age is irregular and undocumented. Everything is opened up and inspected before anything is designed. Gallows brackets are ruled out where the masonry will not take them, and a beam onto new bearings within the existing walls is the alternative the engineer can specify.

Ready to Start Your Esher Project?

Free, no-obligation quote for chimney breast removal in Esher.

We use these details only to respond to your enquiry. See our privacy policy.

Free, no-obligation quote. We reply within 24 hours. Or call 07472 424 226.

Call 07472 424 226Free quote