Bathroom Renovation Welling
Bathroom and wet-room refurbishment in Welling, tanked, plumbed and tiled by one team.
- Rated 4.9 from 31 reviews on MyBuilder
- London guide: £6,000 to £20,000+
- 10 to 15 working days on site
- Free design visit, itemised quote
GS Renovation renovates bathrooms across Welling, working within the 1930s semi-detached and interwar houses of DA16 where the original bathrooms are often small and dated. From full wet rooms to space-saving en-suites, we deliver proper waterproofing and clean finishes. One team handles the plumbing, drainage, tiling and electrics.
In Welling, a full bathroom refit typically costs £6,000 to £20,000 or more (indicative London ranges, MyBuilder and Checkatrade, 2026). GS Renovation Ltd, a building contractor based in Potters Bar, does the work in Welling: we carry the tanking, plumbing and tiling as one contract, with the electrics certified by a registered electrician.
Price guide
| Work | Indicative London range |
|---|---|
| Bathroom renovation, full refit | £6,000 to £20,000+ |
Indicative London ranges (MyBuilder and Checkatrade, 2026), not a quotation. Prices checked September 2026. Full breakdown: Bathroom Renovation Cost.
Quick estimate for Welling
Welling range: choose above
How the job runs
- Free design visit at your Welling home and an itemised quote.
- Strip-out, then first-fix plumbing and electrics.
- Tanking to the wet areas, then tiling.
- Sanitaryware and second fix, with notifiable electrics certified by a registered electrician. Typically 10 to 15 working days on site.

Waterproofing and wet rooms in Welling
A bathroom that lasts starts with what you cannot see. We tank and waterproof the walls and floor properly before any tile goes on, which matters in the interwar Welling houses where suspended timber floors need protecting from moisture. For a walk-in shower or a full wet room we form the falls correctly so water drains where it should, then tile over a sound, sealed substrate rather than trusting the grout alone to keep water out.
Drainage and ventilation are planned alongside the waterproofing. We make sure waste runs fall correctly to the existing soil stack on your DA16 semi, and we fit extraction that clears moisture so the room stays fresh and free of the damp and mould that plague poorly ventilated bathrooms. Underfloor heating is a popular addition, warming the floor and helping the room dry quickly after use through the colder months.
Housing in Welling
About 4,020 homes are listed for the Welling statistical area, and the mix is 78% houses to 21% flats, with 18% built after 1945, 76% in 1919 to 1939 and 5% earlier. Semi-detached houses make up 56% of homes here, and a semi in Welling can vent its bathroom through the flank.
Adding a bathroom to a Welling house with one
78% of Welling homes are houses, and a house built between the wars was designed around one bathroom, often with a separate WC beside it. A second bathroom, or an en-suite, needs a new WC that can drain by gravity to the soil stack. That pipe is large and needs a steady fall, so if the route crosses the joists instead of running between them it cannot be hidden in the floor. Where it cannot, a new stack on a rear or side wall is the next answer.
A new WC connection and a new stack are building control work in a Welling house, not only plumbing. A Bexley building notice suits a simple bathroom addition, but it does not include formal approval of the plans, so the drain runs and the ventilation are judged when the inspector sees them. We leave the new runs open until they have been seen and tested, and the extract fan is ducted to outside so the new room does not add condensation to the loft.
Space-saving layouts in interwar homes
The original bathrooms in Welling's 1930s semis are rarely large, so clever planning earns its keep. We rethink the layout to gain usable space, choosing sanitaryware and a shower enclosure that suit the real dimensions, and using wall-hung units and recessed shelving to keep the floor clear and the room feeling bigger than its footprint. Small changes to where the basin and WC sit often allow a far more comfortable bathroom.
En-suites are a frequent request as families reconfigure the interwar upstairs, often carved from a corner of a main bedroom or a boxroom. We handle the new drainage and the concealed plumbing, with the notifiable electrics certified by a registered electrician, and tile and finish the room to match the standard of the rest of the house. Whether it is the family bathroom or a compact en-suite, we make every centimetre of a DA16 home work.
- Concealed cisterns, frames and wall-hung sanitaryware
- Floor strengthening before large-format tiles or stone
- Bespoke vanity units and storage
VOA Council Tax stock of properties, March 2025, for the Welling statistical area, one of several statistical areas covering DA16. Counts rounded by the VOA.
Trusted Bathroom Renovation in Welling
Welling homeowners choose GS Renovation because we get the hidden work right, the tanking, the drainage falls and the ventilation, before the tiling that everyone sees. We plan clever layouts that suit the compact bathrooms of interwar DA16 semis. With our founder's 30+ years on the tools, one team delivers a watertight, well-finished bathroom with the electrics certified by a registered electrician.
My husband and I are extremely pleased with the work. The standard of the work is outstanding and Saiid has a great eye for detail and will not leave…
Excellent service. George's knowledge and skills are the best in the market. He knows what he is doing, does really high quality work, gives good…
Giorgio is an excellent and intelligent workman, and with very reasonable prices! He installed a kitchen extractor fan in a complicated situation…
FAQ
Frequently Asked Questions about Bathroom Renovation Welling
What happens to the bathroom renovation price if the scope changes in Welling?
The bathroom renovation price in Welling moves visibly when the scope changes, because the quotation is itemised within £6,000 to £20,000 or more (indicative). A change at DA16 is priced against the same lines rather than renegotiated, and any change touching the approvals, such as building regulations compliance for any new drainage, extraction or notifiable electrics, is flagged. GS Renovation issues a written variation and waits for approval.
Can you fit an en-suite in my Welling interwar semi?
Yes, it is a popular project in DA16. We often carve an en-suite from a corner of the main bedroom or a boxroom in these 1930s semis, running new concealed drainage and plumbing back to the soil stack, tanking the wet areas, fitting extraction and having the notifiable electrics certified by a registered electrician. Careful space-saving planning makes even a compact en-suite comfortable and fully waterproof.
How long does a Welling bathroom refit take?
Allow 10 to 15 working days on site. The order is first fix pipework, floor preparation, then tanking left to cure before tiles, then sanitaryware and second fix. Where a Welling house has a separate WC or a downstairs cloakroom that can stay in use, the disruption is far easier to live with, so we check it works before starting.
Can I merge the bathroom and separate toilet in my Welling semi?
Usually, since the partition between them in an interwar semi is often a lightweight stud, though that is confirmed before removal. The joists under the combined room are checked for the new loads, and the WC stays close to the soil stack so the waste keeps its fall. New circuits are notifiable under Part P and certified on completion by a registered electrician.
Will a new shower work well with the boiler in my Welling house?
The hot water system sets the limit. Combis run at mains pressure yet cap the flow, so an oversized drench head suits them poorly. Cylinders filled by gravity from a loft tank give weak pressure upstairs without a pump, while unvented ones want room and a decent mains. If the boiler is moving, as it sometimes does into a Welling garage, the pipe run to the shower lengthens as well.
Where does the extractor fan duct go in a Welling bathroom?
Outside, because Part F requires mechanical extraction ducted out. In a Welling semi that is often up into the loft and out through a soffit or tile vent, and the run through the cold roof space should be insulated so condensation does not drain back to the fan. An opening window on its own does not satisfy the requirement.
What protects the flat below when a Welling flat bathroom is replaced?
Tanking, a rigid floor and access. 21% of Welling homes are flats, and in a flat the bathroom floor is someone else's ceiling. The wet area is tanked, the floor is fixed so it cannot flex under tiles, and an access panel is left to the bath trap and shower waste so a slow leak can be traced without lifting tiles. Check the lease for any notice the freeholder needs first.
Is a wet room harder in a Welling house built after 2000?
It can be. 6% of Welling homes were built in 2000 or later, and a newer upper floor can sit on engineered joists that cannot be cut down to recess a shower former. The fall is then built above the joists, with a low threshold at the door or a raised floor across the room. Lifting a board to see the joists comes before a level wet room is promised.
How much notice does Bexley need before a Welling bathroom with new drainage starts?
At least 48 hours before work starts on site. That applies where the bathroom adds a WC connection, a soil stack or a new drain run, which is building control work in Bexley. Give the notice when the start date is fixed rather than on the morning, so the inspector's first visit can be booked for the stage where the new pipework is exposed and ready to test.
Every Service, One Team
More GS Renovation Services in Welling
One team for every GS Renovation service in Welling:
Same Service, Nearby Areas
Bathroom Renovation Near Welling
We carry out bathroom renovation across Welling and the surrounding areas. Explore a nearby location:
Ready to Start Your Welling Project?
Free, no-obligation quote for bathroom renovation in Welling.