RSJ and Steel Beam Installation Hendon
Steel beam and RSJ installation in Hendon, designed by the engineer we appoint and signed off by building control.
- Rated 4.9 from 31 reviews on MyBuilder
- London guide: £1,500 to £4,000
- Free site survey, itemised quote
GS Renovation installs RSJs and steel beams throughout Hendon, from the 1930s semis off the main NW4 roads to the purpose-built blocks that hold most of Hendon's homes. We remove load-bearing walls safely and open up these homes for modern family living.
In Hendon, a steel beam for one opening typically costs £1,500 to £4,000 fitted and signed off, or £2,500 to £6,500 or more for a full knock-through with the engineer's fee and making good (indicative London ranges, MyBuilder and Checkatrade, 2026). GS Renovation Ltd, a building contractor based in Potters Bar, does the work in Hendon.
Price guide
| Work | Indicative London range |
|---|---|
| Steel beam, one opening: supply, install, sign-off | £1,500 to £4,000 |
| Full knock-through with engineer and making good | £2,500 to £6,500+ |
Indicative London ranges (MyBuilder and Checkatrade, 2026), not a quotation. Prices checked September 2026. Full breakdown: RSJ & Load-Bearing Walls.
How the job runs
- Free site survey at your Hendon address and an itemised quote.
- The engineer we appoint sizes the beam, and the work is registered with Barnet Council building control or an approved inspector. On a shared wall you serve the party wall notice as building owner; we supply the drawings.
- Props go in, the opening is cut and the beam is set on padstones, packed tight above.
- Building control inspects the steel before it is covered. We make good, and the completion certificate follows.

Steel beam design for Hendon interwar homes
Hendon's 1930s semis were built with solid or early cavity brick walls and a fairly compartmentalised layout, so almost any wall you want to lose between the front and back reception is doing structural work. Before we touch it, a structural engineer calculates the load and specifies the beam, whether that is a single RSJ or a goalpost frame, along with the padstones the ends bear onto.
We then set up temporary propping, take the wall down in careful stages, and lift the steel into position onto its padstones. Everything is checked and signed off by building control under the Building Regulations. On a typical Hendon semi the beam carries the floor above and, on the flank wall, part of the roof, so the padstone bearing has to be exactly as the engineer drew it.
Housing in Hendon
By the valuation list's count, Hendon holds about 16,060 homes, 38% houses and 62% flats; by age, 20% were built before 1919, 37% between the wars and 43% since 1945. Where most homes are flats, a beam in a leasehold flat in Hendon needs the freeholder's licence for alterations, since the lease usually keeps the structure with the freeholder.
Getting a steel beam into a Hendon flat through the common parts
62% of homes in Hendon are flats, and a beam for a flat has to travel through the building before it goes anywhere near the wall. The stair turns, the landing widths and the lift car set the longest length that can be carried in, and in a mansion block the tightest point may be a half landing. Measure the route before the design is finalised. A beam that cannot turn the stair either comes in through a window under a lifting plan or is made in two lengths bolted together, with a splice designed by the structural engineer we appoint.
The structure of the block matters too. 43% of homes in Hendon were built after 1945, and a flat in a post-war block may have concrete floors rather than timber joists. A wall under a concrete slab is taken out on props set to the slab, and the steel is fixed to the concrete with anchors chosen by the engineer. The bearings may land on concrete walls or columns that are scanned for reinforcement before they are drilled. Book the managing agent's approval for the lift, the protection and the delivery slot alongside the licence, so a delivered beam is never left standing in the entrance hall.
Party wall duties on shared Hendon walls
Because many Hendon houses are semis, the wall between you and your neighbour is often a shared party wall, and the chimney breasts and stacks often sit within it. Where your steelwork bears into or cuts into that wall, the Party Wall Act applies and you, as building owner, must serve your neighbour the correct notice before work starts. We flag this early and give you the drawings it needs, so the notice period does not hold up the build.
For a mid-terrace or an end-of-terrace property near Golders Green or Finchley the same principle holds on the adjoining flank. We coordinate the propping, the engineer's details and the notice timing so the structural opening proceeds cleanly. Getting the party wall paperwork right protects both households and keeps the project on programme rather than stalling at the demolition stage.
What happens in the floor above the beam
Fitting the steel is only half of what happens at ceiling level. The joists that were bearing on the wall have to be transferred onto the new beam, and how that is done depends on the engineer's detail. If the beam sits below them they simply rest on the top flange and are strapped. If it is raised into the floor zone to keep the ceiling flat, each joist is cut back and carried on a hanger bolted or welded to the web.
That work means the ceiling in the room, and sometimes a strip of the bedroom floor above, is opened up and reinstated. In a 1930s Hendon semi the ceiling below is often the original lath and plaster, which does not take kindly to being cut, so we usually plan to overboard and skim the whole ceiling rather than patch a strip that will always show. You are told which of those applies before we begin.
- Structural engineer's calculations arranged and followed
- Load-bearing wall removal and knock-throughs
- Temporary propping and staged, controlled demolition
VOA Council Tax stock of properties, March 2025, for Hendon Central, Hendon Park, North Hendon & Sunny Hill and West Hendon. Counts rounded by the VOA.
Why Hendon Homeowners Choose GS Renovation
Hendon homeowners choose GS Renovation because one team appoints the engineer who produces the calculations and manages the propping, the safe demolition and the building control sign-off. We understand how these 1930s semis and NW4 blocks of flats are built, we coordinate the work around the party wall award on shared walls, and our founder's 30+ years on the tools means the steel goes in right the first time.
We loved working with George and Ibrahim and would highly recommend them. They have done splendid job on our new kitchen refurb which including new…
The kitchen has been fitted to the high standard. Saaid was polite, professional, tidy, he pays attention to a little details that make huge…
Saiid did a complete refurbishment of our small bathroom. This involved ripping out the existing bath/shower, basin, toilet, pipework, and tiles and…
FAQ
Frequently Asked Questions about RSJ and Steel Beam Installation Hendon
How accurate is an RSJ and steel beam installation quote for a Hendon house?
Accuracy on an RSJ and steel beam installation quote in Hendon comes from surveying, itemising and standing behind the total within £1,500 to £4,000 for one beam opening (indicative). Quoting low to win a job and correcting it later is the commonest complaint about builders. GS Renovation prices in the order the work runs: the steel is delivered and checked before the wall is opened. Anything unforeseen is costed before continuing at NW4.
Can propping in a Hendon house pass through more than one floor?
It has to where the load above comes from more than one storey. In your Hendon house props supporting a first floor have to bear onto something capable of carrying that load, and a suspended ground floor may not be. The engineer's temporary works design then continues the support down to a firm base, sometimes through to a solid floor below. Props standing on an inadequate floor is a serious and common error.
What happens where two beams meet at a corner in a Hendon house?
The connection is designed rather than improvised on site. Where openings in your Hendon house turn a corner, one beam usually lands on another, and that junction has to transfer load safely through a bolted or welded connection specified by the engineer. A post at the corner is sometimes the simpler answer. Connections are where fabricated steelwork is most often got wrong.
Can an existing lintel be reused in a Hendon opening?
Only if the engineer confirms it is adequate for the new arrangement. A lintel in a Hendon wall was sized for the opening it currently spans, and widening that opening or adding load above changes the demand on it completely. Some are timber and have decayed. It is exposed and assessed rather than assumed serviceable because it has not failed so far.
How wide an opening is worth forming in a Hendon house?
Wider is not always better, and the structure sets the sensible limit. In your Hendon house a full width opening transfers everything to the ends of the room and often needs posts on their own foundations, whereas leaving a pier at each side keeps the beam shallower and the work simpler. We ask the engineer to set out both so you can see what the last few feet of opening actually cost you.
How is a long steel beam carried up to a flat in a Hendon mansion block?
It is measured first, then carried or lifted in the length the building allows. The stair turns and the lift size fix the longest piece that fits. Where the design needs a longer span, the engineer can specify a bolted splice so two shorter lengths are joined inside the flat, or the beam comes in through a window with a lifting plan agreed with the managing agent. Both choices are settled before the steel is ordered.
Can a wall under a concrete floor in a post-war Hendon flat be removed?
Sometimes, but the investigation differs from a timber-floored house. 43% of homes in Hendon were built after 1945, and a block from that period may have concrete floors spanning onto crosswalls. A crosswall of that kind can carry several storeys, and removing it may not be practical at all. A lighter partition under the slab may come out with a smaller beam. The block's original drawings, held by the freeholder or managing agent, show which is which.
What does a Hendon managing agent need before a steel beam is delivered?
Usually the engineer's calculations, a method statement for the carry or lift, and insurance details, with a date for protecting the common parts. 62% of homes in Hendon are flats, and a managing agent may have its own forms for this, so ask for them early. A delivery booked before the agent's written approval can be turned away at the door, and the props and the gang wait with it.
Every Service, One Team
More GS Renovation Services in Hendon
One team for every GS Renovation service in Hendon:
Same Service, Nearby Areas
RSJ and Steel Beam Installation Near Hendon
We carry out RSJ and steel beam installation across Hendon and the surrounding areas. Explore a nearby location:
Ready to Start Your Hendon Project?
Free, no-obligation quote for RSJ and steel beam installation in Hendon.