Open-plan kitchen, diner and living conversions in Mill Hill. Trusted, professional, 30+ years' hands-on experience.
GS Renovation opens up Mill Hill houses, from the compartmented interwar semis near the Broadway to the wide detached homes where the ground floor can lose most of its internal walls at once. With more than 30 years of hands on structural experience in NW7, we handle the steel, the stability, the fire escape strategy and Barnet building control.

The larger detached houses here take open plan well, because there is real width to work with. The catch is that same width. Removing the wall between the receptions and then the wall through to the kitchen takes out two lines of masonry that were bracing the house against sideways load as well as holding the floor up. The engineer looks at stability, not only at the beam, and the answer is often a goalpost frame with columns rather than a beam perched on a slender return of brickwork at one end.
Where the openings meet, the detail matters. A beam landing on another beam needs a connection designed by the engineer, and columns need a pad foundation dug beneath the floor rather than a padstone sitting on a slab that was never meant to take that load. Broken plan usually works better than one enormous room in these houses anyway. A retained nib, a Crittall style screen or a change in ceiling level keeps kitchen noise out of the sitting area while the light still runs the length of the plan.
The rule that trips people up is the escape route. In a two storey house the staircase should discharge into a hall separated from the rest of the ground floor, so knocking the hall into the kitchen puts your escape route straight through the room most likely to be on fire. Building control will want that resolved before it signs anything off, usually with interlinked mains powered detection throughout, sometimes by keeping a protected route elsewhere, occasionally with an escape window. Far easier to design at the start than to argue about at completion.
The rest we run as one package. Barnet Council's building control, or an approved inspector, inspects the beam bearings and the connections before they are boarded. Structural steel in a house normally needs 30 minutes of fire protection, which in practice is two layers of plasterboard rather than a skim coat over a bare flange. In a detached Mill Hill house there is often no party wall duty at all; in one of the paired houses near the Broadway there usually is, and we prepare the notice for you to serve.
Mill Hill owners choose us for open plan because we think about the whole ground floor rather than just the hole in the wall. Stability, the fire escape route, the beam connections and the finished ceiling line are considered together, built to the structural engineer's calculations and inspected by Barnet Council's building control. One team, one programme, and a house that stays liveable while the messy stage happens.
Punctual, worked hard, and did exactly what he was asked and what he said he would do. Overall, a very high quality job. Will use again.
Very friendly and I am very pleased with the work he has done, also very clean worker and enthusiastic about his work. Can not fault this company!!!!…
He was very very good. He just got on with the job and we was beey pleased with the result. He Also cleaned everything away when he finished. Will…
FAQ
We would rather not, because a phone figure is a figure that changes. What open-plan conversion costs at an NW7 address depends on structure and condition we can only see on site, particularly in interwar semi-detached housing. GS Renovation will happily talk through the likely scope on 07472 424 226, then survey the Mill Hill property free of charge. The written quotation follows that visit. Nothing is owed for the NW7 visit, in Barnet or anywhere beyond it. As a rough guide, open-plan conversion in London typically costs from roughly £3,000 to £8,000 or more, including the steel beam and finishing (indicative London ranges, MyBuilder and Checkatrade, 2026). Your figure depends on the size, specification and condition of the property, which is why we survey before quoting.
Faster than most people assume, provided the survey is done early. The lead time on open-plan conversion at an NW7 property is usually approvals and materials rather than labour, so GS Renovation starts both as soon as the Mill Hill scope is signed off. Seasonal demand across Barnet does move it. Email info@gsrenovationltd.co.uk for the current position on interwar semi-detached properties. The NW7 survey is free and there is no obligation afterwards in Mill Hill.
Openly, because the alternative shows up at handover. An open-plan conversion project in a Mill Hill home occasionally uncovers wiring, timber or drainage nobody could have seen at NW7, and GS Renovation treats that as a variation to agree rather than a chance to add cost. Barnet Council is notified where the change affects approved work. Nothing proceeds without your say-so. Ask for Barnet references on that point. The engineer's fee appears on the NW7 quotation in Mill Hill.
Internal work in a Mill Hill house does not normally engage planning, but removing a load-bearing wall needs building regulations approval, engineer's calculations and Barnet Council sign-off. If the wall is shared with a neighbour the Party Wall Act may apply too. GS Renovation manages the whole process.
Mainly that investigation comes before commitment. Open-plan conversion at an NW7 property of that age can meet altered structure, aged timber or previous work that was never signed off, so GS Renovation opens up carefully and confirms before pricing the Mill Hill job. An engineer is appointed where the design needs one. Barnet Council inspects the structural stages in the usual way. GS Renovation will explain on 07472 424 226 what open-plan conversion involves in an NW7 house of that age.
Sometimes, but the staircase is the constraint. Building control expects the stair in a two storey house to discharge into a hall that is separated from the rooms around it, so opening that hall into a kitchen removes the protection to your escape route. It is not an automatic refusal. The usual route through is a full interlinked mains powered alarm system across the house, sometimes with an alternative protected escape or an escape window in the affected rooms. We agree the approach with the inspector before the wall comes out.
Almost always, and it is a fair question to ask any contractor. Open-plan conversion across Mill Hill is core work for GS Renovation rather than an occasional job, so there is usually an NW7 project or a Barnet one under way. Ask to speak to those clients. Call 07472 424 226 and we will arrange it. Seeing finished work in Finchley is worth the trip. Nothing about an NW7 address is withheld if you ask.
Every Service, One Team
The same trusted team, 30+ years' hands-on experience and free, no-obligation quotes apply to every GS Renovation service in Mill Hill. Explore what else we do locally:
Same Service, Nearby Areas
We carry out open-plan conversion across Mill Hill and the surrounding areas. Explore a nearby location:
Free, no-obligation quote for open-plan conversion in Mill Hill. Rated 4.9 from 31 reviews on MyBuilder, fully insured, and building control handled for you.