Flat Refurbishment Kew
Flat refurbishments in Kew, your flat renewed within the lease, the licence and the rules of the block.
- Rated 4.9 from 31 reviews on MyBuilder
- UK guide: £33,000 to £48,000
- Free site survey, itemised quote
Flat refurbishment matters in Kew, because 43% of homes here are flats. Expect two kinds of building: Victorian houses divided into flats, and purpose-built blocks, with 31% of all Kew homes dating from after 1945. Either way the flat shares walls, floors and a staircase with neighbours, and the lease, the freeholder and the managing agent set the terms. We renew the kitchen, bathroom, electrics, heating and finishes inside the flat, to a programme the block can live with.
For Kew, published UK averages put a full flat refurbishment at £33,000 to £48,000 and a basic one, with budget kitchen and bathroom fittings, at £15,000 to £18,000, and London flats usually cost more (Checkatrade and MyJobQuote, 2026). GS Renovation Ltd, a building contractor based in Potters Bar, does the work in Kew: we refurbish the flat within the terms of your lease and licence to alter, protect the common parts throughout, and a registered electrician certifies the new consumer unit and circuits.
Price guide
| Work | Indicative range |
|---|---|
| Flat, full refurbishment | £33,000 to £48,000 |
| Flat, basic refurbishment | £15,000 to £18,000 |
| Full rewire, one-bed flat | from £3,900 |
| Consumer unit replacement | £350 to £750 |
| Sound insulation under a new floor | £45 to £160 per square metre |
Indicative ranges from published cost guides (Checkatrade and MyJobQuote, 2026), not a quotation. Most are UK-wide figures and London work usually costs more; a row marked London is a London figure. Prices checked September 2026.
Quick estimate from UK guide figures
Guide range: choose above

The lease and licence to alter for a Kew flat
In a Kew flat the lease comes first: where it requires the landlord's written licence to alter, that licence is needed before walls move, floors are lifted or the bathroom changes position. The managing agent may also set its own working hours, rules for the common parts and a method statement to approve before work starts. We supply the method statement and programme the owner needs for that application. Allow for that approval in the start date.
Read the lease for what it says about floor coverings, alterations to services and access to the roof void or riser, because a refurbishment often touches all three. In a converted Kew house the freeholder may be the leaseholders themselves, through a residents' company, which can make consent quicker or slower depending on who holds the post. In a purpose-built block a professional agent usually asks for a method statement, a risk assessment and a named site contact, and we provide those.
Housing in Kew
Kew has around 4,470 homes on the Council Tax list: 31% post-war, 6% interwar and 62% predate 1919, with 43% flats and 57% houses.
Floors, sound and leaks to the flat below in Kew
Floors are the sensitive point. Pulling up carpet to lay boards or tiles in an upper flat can make impact noise much worse for the flat below, and some leases forbid hard floors without acoustic underlay. We lay a resilient layer under any hard floor and keep it clear of the skirting, so sound does not bridge into the walls. In a converted Victorian house in Kew the timber joists carry sound further than a concrete slab does.
Water is the other risk to neighbours. A new bathroom or kitchen inside a Kew flat is kept on its existing footprint where possible, so wastes still fall to the same stack, and every joint is pressure tested before the floor closes. Where the flat sits over another, we form a tanked shower area and fit accessible isolation valves. If a leak from above has already stained the ceiling, the source is traced and fixed before we make good, otherwise the new plaster fails.
Working inside a Kew block: hours, common parts and deliveries
Richmond's standard limit for noisy work, weekdays from 8am to 6pm and Saturday mornings to 1pm, is the outer boundary; a managing agent can set tighter hours inside a block. In a Kew flat we put stripping out, drilling and tile cutting in the middle of the day and give the other residents a written programme. Nothing noisy happens on Sundays or Bank Holidays, and the quiet stages such as painting fill the early mornings.
The shared hall and stairs are protected before the first delivery: floor sheet on the treads, corner guards on walls and a lift lined if the block has one. Waste leaves in bags carried down each day rather than a skip, which suits a flat with no frontage of its own. A Kew street with controlled parking means a bay suspension is booked through Richmond for the days that plasterboard, a kitchen or a bath arrive, and we clear the common parts each evening.
Letting a Kew flat: EPC rules and fire safety in the block
A landlord refurbishing a Kew flat between tenancies has to meet the minimum EPC rating before re-letting. Since 1 April 2018 private landlords may not let domestic properties on new tenancies with an F or G rating unless an exemption applies, and since 1 April 2020 they cannot let or continue to let below E. The local authority enforces the rules and can fine per property. In a flat the usual gains are heating controls, an efficient boiler or electric heater, and draught stripping.
Fire safety in a block is shared. The flat entrance door and the compartment walls and floors are part of the block's fire protection. The lease decides who owns them, the responsible person has fire safety duties for the building, and we do not alter them without agreement. Where a Kew block is a higher-risk building under the Building Safety Act, building control for work there sits with the Building Safety Regulator rather than the council. Some work done under a competent person scheme is an exception, though not every scheme type can be used in a higher-risk building, so the installer confirms theirs. The managing agent can confirm whether the block is one.
- EPC improvements to meet the minimum standard for let flats
- Kitchen renewal within the flat footprint, drained to the shared stack
- Secondary glazing inside windows the lease keeps with the freeholder
VOA Council Tax stock of properties, March 2025, for Kew Gardens. Counts rounded by the VOA.
The GS Renovation Difference in Kew
Refurbishing a flat is as much about the neighbours as the flat. We read the managing agent's rules before pricing, give the owner the method statement and programme the licence application needs, and keep the common parts clean every day. Electrics inside the flat are tested and certified by a registered electrician, and any gas appliance is fitted by an engineer on the Gas Safe Register. One point of contact deals with the agent and the residents, and the quote is fixed after a site visit to the flat.
- Honest updates if a date or a detail has to move
- Acoustic floor build-ups laid to the specification in your lease
- The lease and licence to alter read before a flat is quoted
George always kept to commitments and arrived on time. He offered helpful suggestions during his initial visit and promptly provided a reasonably…
Saiid did a complete refurbishment of our small bathroom. This involved ripping out the existing bath/shower, basin, toilet, pipework, and tiles and…
It's the second time I have hired George and he has been absolutely professional and the work he did resembles perfectly what I had in mind. Being an…
FAQ
Frequently Asked Questions about Flat Refurbishment Kew
What should I budget to refurbish a flat in Kew?
Use the UK range of £33,000 to £48,000 for a full refurbishment (Checkatrade and MyJobQuote, 2026) as a floor, and add for London prices and for what the block requires. The licence to alter is between you and your freeholder, so any fee they charge sits outside the building quote. The Kew survey fixes the scope, and each trade is priced as its own line.
Does refurbishing a leasehold flat in Kew need the freeholder's consent?
Where the lease requires a licence to alter, yes, for anything beyond decoration: moving walls, relocating a kitchen or bathroom, or changing floor finishes. The freeholder or managing agent grants it, often with conditions on hours and floors. We supply the method statement and programme the application needs.
Can wooden floors go down in an upper flat in Kew?
Only if the lease allows it, and many leases require acoustic underlay under hard floors. In a converted Victorian house the timber joists carry impact sound easily, so we fit a resilient layer and isolate the boards from the walls to protect the flat below.
What EPC rating does a rented flat in Kew need?
At least E. Since 1 April 2020, landlords cannot let or continue to let properties covered by the MEES Regulations with a rating below E unless a valid exemption applies. A pre-letting refurbishment should therefore include the heating and insulation work that lifts the rating, before the EPC assessor visits.
Does a new consumer unit in a Kew flat need building control?
It is notifiable electrical work, so yes, but the usual route is a registered electrician in a competent person scheme, who certifies it and notifies building control for you. A building notice to Richmond, which runs its own building control service, is the fallback where that route is not used. In a block the supply may come from a landlord's riser, so the managing agent books any shutdown and may want a copy of the certificate.
Can the managing agent restrict our working hours in a Kew block?
Yes. Richmond's limits on noisy work are the legal outer boundary, and a block's rules can be stricter, for example no drilling before 9am or at weekends. We ask for the block rules before pricing, because tighter hours lengthen the programme and change how the trades are sequenced.
Who is responsible for the front door of a flat?
The lease decides who owns it. In a block the flat entrance door is part of the building's fire protection, so whoever replaces it must keep the fire rating required, and the freeholder or responsible person should agree the specification. We will not swap it for a door that is not fire rated.
How do materials get into a Kew flat with no parking?
We book a parking bay suspension through Richmond for delivery days and carry materials up by hand, protecting the stairs first. Waste leaves in bags the same day rather than a skip on the road. Large items such as a bath or worktops are measured against the stair turns before ordering.
What happens if a new bathroom leaks into the flat below?
We aim to prevent it: wastes stay on the existing stack where possible, the shower area is tanked, and joints are pressure tested before floors close. If a leak does occur during works, water is isolated at once, the source is found and fixed, and the owner and the flat below are told straight away.
Every Service, One Team
More GS Renovation Services in Kew
One team for every GS Renovation service in Kew:
Same Service, Nearby Areas
Flat Refurbishment Near Kew
We carry out flat refurbishment across Kew and the surrounding areas. Explore a nearby location:
Ready to Start Your Kew Project?
Free, no-obligation quote for flat refurbishment in Kew.