Every trade under one contract across Woolwich and SE18. Structural work, extensions, kitchens and bathrooms, building control handled for you.
Renovation in Woolwich divides cleanly between two kinds of building. Up the hill from the town centre run streets of Victorian terraces with solid nine inch walls, bay fronts, closet wings and suspended timber floors, most of them well past a hundred years old. Down by the river, the Royal Arsenal's conversion has produced apartments in a mixture of restored historic buildings and new construction. The same request, a better kitchen and a more open ground floor, means completely different work depending on which side of General Gordon Square you happen to live.
A terrace of this era has a predictable anatomy and predictable faults. The rear closet wing leaves a narrow side return that most owners eventually want filled in. Solid brick walls have no cavity, so they lose heat and can carry damp inward where ground levels have risen against them. Suspended timber ground floors need their underfloor ventilation kept clear, and it rarely is. Lath and plaster ceilings crack and get overboarded rather than replaced. All of it turns up once the finishes come off. The survey is where these things surface, not the second week of the build.
Opening the ground floor up is the change that transforms these houses, and it needs designing properly. The wall between front and rear rooms carries floor loads and often part of a chimney stack, so the load path is assessed by an engineer we bring in and the beam and padstones come from their calculations. Our part is installation: propping, staged demolition, seating the steel and leaving the bearings open for building control. Where a bearing lands in the shared wall, the work becomes notifiable under the Party Wall Act and the notice has to reach the neighbour first.
An apartment at the Royal Arsenal is a different job in every respect. The building is managed, the flat is leasehold, and structural or layout changes need the freeholder's written consent before the design is finalised. Construction is typically concrete or steel frame with non structural partitions, which sounds simpler than it is: what looks like a stud wall may be concealing a column, a riser or part of a structural core, and the building's own drawings and the management rules both need consulting before anything is cut. Cutting first and asking afterwards is not an option in a frame building.
Management rules govern the rest. Working hours, lift bookings, loading bay access, dust containment and where waste can be staged are set by the building rather than by the site. Corridors and lifts get protected before the first delivery. We supply the insurance details and method statement the management company asks for, and you get one named project manager who deals with them so you are not doing it from your desk. It adds lead time, not difficulty. Booking the lift and the loading bay weeks ahead is part of the programme rather than an afterthought.
Most Victorian houses in SE18 have been improved in patches over decades, which leaves an odd mixture: a new bathroom, original wiring, a rewire that stopped at the first floor, a boiler squeezed into what used to be an airing cupboard. A full renovation is worth doing precisely because it brings the whole building to one standard in one sequence. Structure, then first fix electrics and plumbing, then plaster, then kitchen, bathroom, second fix and decoration, with inspections at each stage rather than all at the end. Following that order is what stops one trade undoing the work of another.
Living arrangements have to be decided honestly too. A full refurbishment in an occupied terrace can be phased, but it is slower and dustier than moving out for the noisy stage, and we say which yours needs at quotation stage rather than in week three. Waste, deliveries and a skip permit all have to be arranged around a street with controlled parking and no rear access to most of these terraces, and that gets planned before a start date is confirmed. Certainty about those arrangements is worth more to most households than an optimistic start date.
Every Service, One Team
One accountable team for every trade in Woolwich. Choose the work you need:
RSJ and Steel Beam Installation in Woolwich: steel beam installation, RSJ and structural alterations.
Load-Bearing Wall Removal in Woolwich: safe load-bearing wall removal with steel beam support.
Structural Alterations in Woolwich: structural alterations, new openings and steel support.
Chimney Breast Removal in Woolwich: chimney breast removal with gallows bracket or beam support.
Open-Plan Conversions in Woolwich: open-plan kitchen, diner and living conversions.
House Extensions in Woolwich: single and double storey extensions.
Loft Conversion in Woolwich: dormer, hip to gable and mansard loft conversions.
Home Renovation in Woolwich: full refurbishments and whole-house renovations.
Kitchen Renovation in Woolwich: bespoke kitchen design and installation.
Bathroom Renovation in Woolwich: luxury bathroom and wet-room refurbishment.
Nearby
FAQ
Yes, and it is the most common renovation request in SE18. The dividing wall between front and rear rooms carries load, so an engineer we bring in calculates the beam and padstones, and we install to those calculations with the structure propped. Building control inspects the bearings before they are covered. Where a bearing lands in the shared party wall, notice reaches the neighbour first.
Both the consent and the construction change. The flat is leasehold, so the freeholder's written permission is needed for structural or layout work, and the building's management sets working hours, lift bookings and waste routes. The structure is a frame rather than loadbearing masonry, so partitions are usually non structural, but risers, columns and cores can hide behind plasterboard and must be identified before anything is cut.
By finding the cause rather than treating the symptom. Raised external ground levels, blocked underfloor vents, failed pointing and cement render over soft brick account for most of what gets diagnosed as rising damp in SE18. We deal with the external cause first, restore ventilation, and only then replaster, because new plaster on a wall that is still wetting will fail inside a year.
Yes, applications and inspections are coordinated as part of the job, whether through the Royal Borough of Greenwich or an approved inspector. It applies to steelwork and new openings, electrical work in the notifiable categories, any change to the drainage and the insulation improvements that come with a full refurbishment. The company is fully insured and quotations are free and carry no obligation.
George did a great job on our new bathroom. He is a really friendly and helpful guy and always ready to discuss any issues or concerns and come up with a sensible solution. Best of all, he works to budget and does not try and find…
Saiid did a complete refurbishment of our small bathroom. This involved ripping out the existing bath/shower, basin, toilet, pipework, and tiles and replacing with new. Saiid was very helpful during the planning stage giving useful advice…
I had a bathroom refit which I was very pleased with and I then went on to get my kitchen refitted as I was so happy with the way he worked. Even though I made a few changes to my original idea nothing bothered him and he worked his magic…
Free, no-obligation quote for any renovation work in Woolwich. Rated 4.9 from 31 reviews on MyBuilder, fully insured, and building control handled for you.